MiLAWYER

Law library · Sierra Leone · Environment Protection Agency Act, 2008

First Schedule, Environment Protection Agency Act, 2008

Status not yet checkedEnvironment Protection Agency Act, 2008, Sierra Leone

(Section 24) PROJECTS REQUIRING ENVIRONMENTAL IMPACT ASSESSMENT LICENCES A licence is required for the projects whose activities involve or include the following:– (a) substantial changes in renewable resource use (e.g. conversion of land to agricultural production, forestry or to pasture land, rural development, timber production); (b) substantial changes in farming and fisheries practices (e.g. introduction of new crops, large scale mechanisation or use of chemicals in agriculture); (c) exploitation of hydraulic resources (e.g. dams, drainage and irrigation projects, water basin development, water supply); (d) infrastructure (e.g. roads, bridges, airports, harbours, transmission lines, pipelines, railways); (e) industrial activities (e.g. metallurgical plants, wood processing plants, chemical plants, power plants, cement plants, refinery and petro-chemical plants, agro-industries). (f) extractive industries (e.g. mining, quarrying, extraction of sand, gravel, salt, peat, oil and gas); (g) waste management and disposal (e.g. sewerage systems and treatment plants, landfills, treatment plants for household and hazardous waste); (h) housing construction and development schemes; (i) establishment of places of entertainment, motor repair garages and welding shops; (j) importation of second hand vehicles.

Read the whole lawDownload PDFAsk Tima what this means

Check the current official version before relying on this text. MiLAWYER shares legal information, not legal advice.