GUMA VALLEY WATER COMPANY LANDS
GUMA LANDS AND GUMA WORKS
PART 1- GUMA LANDS
The three pieces or parcels of land hereinafter described, all of which are delineated on the
plan entitled ‘’Guma Lands’’, numbered 73/60-61, registered in the office of the Registrar-
General.
A. ALL THAT PIECE OF PARCEL OF LAND marked ‘’A’’ on the plan situated
and lying between the junction of two streams west of the Peninsular Circular Road and the
Colony Forest Reserve Boundary lying east of the aforementioned Peninsular Circular
Road at its junction with the main Access Road to Guma Valley at Guma in the Colony of
Sierra Leone the boundary whereof commencing at a point marked R on the plan which
point is situated at the junction of the aforesaid two streams runs thence along the southern
bank of the northern stream in a north-easterly direction for approximately 1,021m to a
point marked S situated on the Colony Forest Reserve Boundary and thence following the
Colony Forest Reserve Boundary in a south-easterly direction for approximately 411.5m
to appoint marked T and thence on a south-westerly direction following the northern bank
of the southern stream for approximately 1,234m to the said point marked R, the point of
commencement, thus enclosing an area of 44.0 acres be the same several dimensions little
more or less as the same premises are more particularly delineated and shown edged GREEN
on the said plan.
B. ALL THAT PIECE OR PARCEL OF LAND marked ‘’B’’ on the said plan situated
and lying within the Colony Forest Reserve at Guma in the Colony of Sierra Leone the
Boundary whereof commencing at a point in the Colony Forest Reserve at Guma in the
Colony of Sierra Leone the boundary whereof commencing at a point in the Colony Forest
Boundary which is approximately 76.2m distant on a north-westerly direction from the
center of the Main Access Road to Guma Valley runs in a general easterly direction parallel
to and approximately 76.2m distance from the centre of the Main Access Road for an
approximate distance of 1,387m to a point marked A on the plan, the Colony Co-ordinates
for this point being 18,597m east and 188,643m north, and thence on an approximate true
bearing of 1880 30’ for approximately 152.4m to a point marked Q on the plan, the Colony
Coordinates for this point being 18,521m east and 188,491m north, and thence in a general
westerly direction parallel to and approximately 76.2m distance from the centre of the said
main Access Road for an approximate distance of 1,387m to the Colony Forest Reserve
Boundary and thence following the Colony Forest Boundary in a north-westerly direction
for an approximate distance of 152.4m to the point of commencement thus enclosing an area
of 53.88 acres.
C. ALL THAT PIECE OR PARCEL OF LAND marked ‘’C’’ on the said plan.
Situated and lying within The Colony Forest Reserve at Guma in the Colony of Sierra
Leone the boundary whereof commencing at the said point marked ‘’A’’ on the plan runs on
an approximate true bearing of 1150 30’ for 167,7m to a point marked ‘’B’’ and thence on
a bearing of 680 00’ for 411.5m to a point marked ‘’C’’ and thence on a bearing of 3530 00’
for 625m to a point marked ‘’D’’ and thence on a bearing of 900 00’ for 685.9m to a point
marked ‘’E’’ and thence on a bearing of 3600 00’ for 381m to a point marked ‘’F’’ and thence
on a bearing of 900 00’ for 381m to a point marked ‘’G’’ and thence on a bearing of 1560 00’
for 411.5m to a point marked ‘’H’’ and thence on a bearing of 1670 30’ for 792.7m to a point
marked ‘’I’’ and thence on a bearing of 900 00’ for 304.8m to a point marked ‘’J’’ and thence
on a bearing of 1800 00’ for 762m to a point marked ‘’K’’ and thence on a bearing of 2240 30’
for 442m to a point marked ‘’L’’ and thence on a bearing of 270000’ for 914.6m to a point
marked ‘’M’ and thence on a bearing of 3310 00’ for 609,7m to a point marked ‘’N’’ and
thence on a bearing of 297 00’ for 350.6m to a point marked ‘’O’’ and thence on a bearing of
2590 00’ for 381m the said point marked ‘’P’’ and thence on a bearing of 3600 00’ for 381m
to the said point marked ‘’Q’’ and thence on bearing of 080 30’ for 152m to the said point
marked ‘’A’’ which is the point of commencement thus enclosing an area of 733.08 acres.
PART II- PRELIMINARY WORKS ON GUMA LANDS
With the boundaries of the Guma lands all works whether permanent or temporary including
excavation, filling, boring, grouting. Construction in any material and all camps, offices,
stores and other buildings, access road quarries, borrow pits, gauging weirs and rain gauges.
PART III-GUMA WORKS
1. The Trunk Main, of diameters 450mm and 550mm, from the boundary of the Guma
Lands with the Peninsular Road to the Wilberforce Reservoir, together with the
lands appertaining to it (so far as such lands do not form part of any street maintainable
at the public expense).
2. The Wilberforce Reservoir together with lands appertaining to it and all ancillary
3. The Main, of diameter 550mm. from the Wilberforce Reservoir to the Tower Hill
Reservoir, together with the lands appertaining to it (so far as such lands do not
form part of any street Maintainable at the public expense).
4. The Main, of diameter 550 mm, from the Tower Hill Reservoir to the Reservoir No.
R I.
5. The Reservoir No R I together with lands appertaining to it and all ancillary works.
6. The Mains of diameters 300 mm and 400 mm from the Reservoir No. R I to the
Reservoir No R2.
7. The Reservoir No. R 2 together with the lands appertaining to it and all ancillary
8. The Main, of diameter. 300 mm, in Kissy Road between Dan Street and Ross Road
and in Upper Dan Street.
9. The Main of diameter 200 mm. in Ross Road.
10. The Main of diameter 200 mm. in College Road.
11. The Mains of diameters 300 mm and 375 mm, in Fourah Bay Road
No. 6 Guma Valley Water Company Act 2017No. 6 Guma Valley Water Company Act 201736 37
12. The Mains. of diameter 80 mm, in Wilkinson Road and the roads to the south-west
of Wilkinson Road and Brookfields, Main Road.
13. The mains of diameter 700 mm starting from Congo Town to Maxwell Street,
Wellington.
14. The mains of diameter 300 mm in Upper Mountain Cut from Baharm Road to Will
Street.
15. The Break Pressure Tank on Tower Hill together with the lands appertaining to it
and all ancillary works.
16. The Maxwell Street reservoir, Wellington reservoir with the lands and all ancillary
works appertaining to it.
17. The Wellington Extension Scheme, comprising the stream intake on the Blue River,
the treatment works and the mains of diameters 150mm and 300mm in the
Wellington area, together with the lands appertaining to it and all ancillary works.
18. The Tower Hill Reservoir together with lands appertaining to it and all ancillary
19. The mai n of diameter 550 mm from Tower Hill Reservior to break pressure tank
at Tower Hill.
20. Break pressure tank at Tower Hill together with land appertaining to its and all
ancillary works.
21. The main of diameter 200 mm in the Central Business District.
22. The main of diameter 300 mm between Dan Street and Maxwell Street Wellington.
23. The Africanus Road Reservior together with land appertaining to it and all ancillary
24. The main of 200 mm form Kongo Dam to Babadori , Regent.
25. The Allen Town Reservior together with lands appertining to it and all ancillary