(1) An environmental licence holder shall be liable for anycivil or criminal action to which he may be subject at any time and the
penalty provisions contained herein shall not be interpreted as
excluding liability or providing compensation in relation to any such
criminal or civil liability.
(2) The penalty provisions contained in these
Regulations are in addition to and in no way limit or exclude the
obligation of an environmental licence holder’s responsibility to spend
funds and take any other remedial or restorative actions required to
clean up and rehabilitate all damages resulting from an infringement
and where practicable, restore damaged land or goods to their
condition prior to the occurrence of the offence.
(3) Any compensation or fines indicated in the Act shall
not reduce, preclude, compromise or replace any payment of penalties,
damages, indemnities or other economic consequences attributable
to an environmental licence holder under these Regulations.
(4) An environmental infringement shall not be liable to a
penalty under these Regulations and the Mines and Minerals Act,
2009 only one penalty shall apply.
72 73
Warnings.
Notification
and payment
of fines.
No exclusion
of liability.
SCHEDULE OFPENALTIES (REGULATION 84)
EP1A Category A or B environmental licence holder $10,000
EP2A Category A or B environmental licence holder $50,000
EP3A Category A or B environmental licence holder $250,000
EP4A Category A or B environmental licence holder $750,000
EP1B Category C or D environmental licence holder $5,000
EP2B Category C or D environmental licence holder $25,000
EP3B Category C or D environmental licence holder $125,000
EP4B Category C or D environmental licence holder $375,000
FIRST SCHEDULE - PUBLIC PARTICIPATION AND CONSULTATION
1. Requirement for public participation and consultation
Regulation 3 (h) places a mandatory obligation on all applicants for an
environmental licence to carry out consultation with stakeholders from
the earliest stages of a mining project throughout the mining operations
until closure is completed. This consultation shall be undertaken in
accordance with the principles for public participation and consultation
set out in Regulation 3 (h) and this Schedule.
2. Procedural requirements for each category of mining project
Applicants for mining projects under the following environmental licence
categories shall, as a minimum requirement, undertake the following level
of public participation and consultation.
Category D: There is no formal requirement for public participation and
consultation in relation to a Category D project, however the holder of a
mineral right shall recognize the legitimate interests of local communities
74 75
to be informed about any activities which involve the transport of equipment and personnel and the use of accommodation in association with
mineral reconnaissance and prospecting and shall provide relevant
information to such stakeholders.
Category C: Applicants for an environmental licence in relation to a Category C
project shall arrange a public meeting within the area likely to be affected by
exploration or small scale mining activities before any equipment is moved into the
area or physical activity takes place on site.
The purpose of the meeting will be to discuss with the community the nature of the
work and its likely impacts and to engage in dialogue with the community which
must include answering questions and addressing concerns.
Where activities are ongoing, the holder of an environmental licence shall hold
public meetings with local communities at regular intervals, which shall occur at
least every three months.
Category B: The requirements for public participation and consultation set out
for Category C projects above shall also apply to Category B projects.
In addition, where the area covered by a Category B project includes more than
one settlement and these settlements are more than 5 kilometers apart, the holder
of or applicant for an environmental licence shall organise public meetings in each
settlement.
In the case of Category B projects, the holder of or applicant for an environmental
licence shall develop and implement a communications plans to manage public
participation and consultation throughout the term of the mining licence or
environmental licence, as applicable.
The communications plan shall be included in the Environmental Management
Plan and Social Management Plan.
Category A: The requirements for public participation and consultation set out
for Category B projects shall also apply to Category A projects.
In addition, all arrangements for public participation and consultation contained
within the communications plan shall be discussed and agreed with the Community
Liaison Committee established under Regulation 7.
SECOND SCHEDULE - PROJECT SCREENING APPLICATION
(REGULATION 11(5))
TO DETERMINE THE CATEGORY OF PROJECT FOR AN
ENVIRONMENTAL LICENCE
1. Procedures
Applicants for an environmental licence required in connection with the following
categories of mineral rights licences shall submit a project screening application as
set out in Tables 1 through 3 below. This information will be used by the Agency
to determine which category of environmental impact assessment shall be
undertaken by the applicant to support its application for an environmental licence
relating to:
(a) A Reconnaissance Licence involving invasive activities under Section 64
of the Mines and Minerals Act 2009;
(b) An Exploration Licence under Part IX of the Mines and Minerals Act 2009;
(c) A small scale mining licence; and
(d) A large scale mining licence.
Table 1 Information on the Applicant and the nature of the planned
operation
1. Thefollowing information isin summary form (full details shall be
submitted as set out in theAct).
(a) Registered Name and place of incorporation of the company
………………………..……………………………………………………….
(b) Company profile and history of reconnaissance and exploration
operations in Sierra Leone and elsewhere
……………………………….............…………………………………………
(c) Name and qualifications of supervising officer
…………………………………………………………………………………
(d) Plan of the reconnaissance licence area
…………………………………………………………………………………
(e) Description of contiguous blocks
………………………....………………………………………………………
(f) Statement on technical and financial resources
…………………………….........………………………………………………
(g) Proposed programme of reconnaissance operations
……………………….............…………………………………………………
(h) Period for which the application applies
……………………….........................…………………………………………
(i) Details of any existing mineral rights
…………………….............……………………………………………………
76 77
Table 2 Description of Location and Nature of Operations
2. Information required under the First Schedule
Description Units Estimated cost of remediation
(i) Area of land covered Km2 or Ha
by the application
(ii) Number of boreholes
to be drilled Number
(iii) Quantity of specimens
and samples to be taken < 1 tonne
<1-10 tonnes
> 10 tonnes
(iv) Name and surface area of
woodland or forest within
which timber will be cut
(v) Name and location of river,
lake or other water body
from which water will be
extracted
(vi) Location of any temporary
buildings
(vii) Name and location of any
ancient monument, relic,
sacred grove or other artifacts
of historic and cultural
significance that lies within
or closer than 100 metres to
the boundary of any physical
works
Table 3 Applicant’s assessment of the likely effects of the mining activities on
the natural environment within the area of mining operations
Completion of this table shall satisfy the requirements of an applicant for a
reconnaissance licence under Section 57 (j) of the Mines and Minerals Act 2009.
3. Physical Environment (Mark the relevant sections with an X and give precise details of area,
depth or volume, where these exist.)
3.1 Land Surface
Description 1 2 3 4 5
Less than 1 1 to 10 10 hectares 1 to 100 km2 More than 100
hectare hectares to 1 km2 km2
Surface area of land affected by
surface disturbance with
machinery or excavations
Area of vegetation to be cleared
Area of farmland affected
3.2 Land Excavation
If the operations involve 1 2 3 4 5
excavation what quantity of Less than 10m3 to- 100m3 to 1 million to More than
material will be moved? 10 m3 100m3 1 million m3 100 million m3 100 million m3
What is likely to be the Less than 3 3 to 15 feet 15-30 feet 30 to 150 More than 150
maximum depth of excavation feet feet feet
from the existing surface level (1 metre) (1-5 metres) (5-10 metres) (10-50 (>50 metres)
metres)
Ratio of overburden to
mineral ore recovery 0:1 1:1 Between 1:1 Between 5:1 More than
and 5:1 and 20:1 20:1
3.3 Water
Description 1 2 3 4 5
Less than 100 to 1000 to 50,000 to Over 100,000
100 m3 1000m3 50,000m3 100,000m3 m3
Volume of water to be
abstracted by gravity or
pumping from a natural or
artificially constructed water
course or water body
(maximum over one month)
Volume of water to be stored
in tanks/ settling ponds or
other artificial storage areas
78 79
Volume of waste water
(including drilling mud) to be
produced (over a maximum
period of one month)
creating a dam or impoundment
on any watercourse or dredging
operations?
diverting an existing water course?
3.4 Wildlife and Nature Conservation
Does the application area include N o Yes
any officially protected area?
Has an ecological survey been Yes N o
undertaken by a qualified biologist?
Are any rare or endangered species N o Yes
of plants or animals found within
the application area as listed in
national or international registers?
In the applicant’s opinion, will the
operations affect wild life and nature
conservation in the application area? Not at Very Some Moderate Major
all slight minor adverse adverse
effects adverse impacts impacts
impacts which
which can be
can be mitigated
mitigated
3.5 Natural Resources
Will the operation require the use N o Yes
of local timber, stone, clay or other
building materials
3.6 Infrastructure
Do existing tracks and roads lie
within the application area? Footpaths Minor tracks Dirt/ Un-surfaced Regional
gravelled District and Paved
feeder roads Roads Roads
Will any tracks and roads be
used by mineral traffic? Footpaths Minor tracks Dirt/ Un-surfaced Regional
gravelled District and Paved
feeder roads Roads Roads
How many of truck Less than 3 3 to 10 10 to 20 20 to 50 More than
movements of over 3 tonnes 50
capacity will use public roads
in an average month?
diversion or construction of metres to 1 Km 10 kms 10 kms
new roads?
diversion or construction of metres to 1 Km 10 kms 10 kms
new railways?
Does the project involve the use
of existing ports or the
construction of new ports? N o Yes Yes
(existing ports) (new ports)
Does the project involve the use
of air transport from existing or
new airports? N o Yes Yes
(existing (new
airport) airports)
3.7 Energy
Will the applicant provide all
energy requirements from the
company’s own resources? N o Yes
What is the estimated annual Less than 5000 - 50,000 to 100,000 kw More than 1
electricity requirement of the 5000kw 50,000 kw 100,000 kw to 1 mw mw
operations?
What is the estimated annual Less than 50,000 to 100,000 to 500,000 to More than 1
requirement of the operations 50,000 litres 100,000 500,000 1 million million
in terms of diesel oil or other litres litres litres litres
petroleum products?
80 81
3.8 Buildings, Structures and Processing Plant
Will the operations include Temporary Permanent Permanent Permanent Permanent
the erection of buildings and buildings buildings/ buildings/ buildings/ buildings/
structures/plant? and structures structures structures structures
structures covering covering covering covering
erected for less than 100m2 to 500m2 to more than
<5 years 100m2 500m2 1000m2 1000m2
3.9 Emissions
Will the operations generate N o Yes
solid waste requiring disposal
through land fill?
Will the operations involve N o Yes
processes giving rise to
gaseous emissions
potential to generate dust
which would impact on local
inhabitants?
potential to generate noise
which could adversely affect
local inhabitants?
Will the operations require the N o Yes
use of chemicals and reagents
in on-site processes?
Will the operations pose any N o Yes
form of risk to humans from
potential accidents and the
creation of hazards
(e.g. deep bodies of water/rock falls?)
Will the operations create unsightly N o Yes
visual impacts affecting the setting
of villages or towns?
If the answers to any of the above questions relating to “Emissions” in Part 3.9 of Table 3 are “Yes”, provide
summary details on the scale and nature of the potential effects.
Table 4Applicant’s assessment of the scale and likely effects of the operations on the local economy and
social conditions within the area of mining operations.
4.1 Resettlement Impact
Will the operations require the N o Yes
resettlement of people?
Description/Impact
Will the operations affect existing Not at all Very Some Moderate Major
settlements either directly or slight minor adverse adverse
indirectly? effects adverse impacts impacts
impacts which can
which can be mitigated
be mitigated
with more than 500 houses?
with 100-500 houses?
with 50 -100 houses?
with 25-50 houses?
With fewer than 25 houses?
Where the answer to the above questions on settlements and properties is “Yes” provide details on the estimated
number of properties and individuals involved
4.2 Effect on current land use activity
Will the operations displace or Not at all Very Some Moderate Major
reduce the viability of existing slight minor adverse adverse
land uses for: effects adverse impacts impacts
impacts which can
which can be mitigated
be mitigated
Agriculture?
Forestry?
Rural livelihoods (collecting roots/
fruits/honey etc.)?
Tourism?
Will the operations affect:
Monuments/archaeological sites:
Sacred groves?
Burial areas?
82 83
THIRD SCHEDULE - PROJECT SCREENING CRITERIA
(Regulations 11 (6) and 12 (2) )
1. Procedures
(1) The Agency shall base its decision on the information submitted as part
of the project screening application, supported by information on
environmentally sensitive areas in Sierra Leone and criteria relating to
social and local economic conditions as set out in Table 1.
(2) Any application which falls within the criteria listed in Table 1 will
automatically require a Category A or B environmental Assessment and
the equivalent social assessment.
(3) Applications falling outside the environmentally sensitive localities listed
in Table 1 will also require environmental and social assessment where
the class of assessment will be determined by the nature and scale of the
planned operations.
(4) In all cases, the class of environmental and social assessment will be
determined by the Agency in accordance with criteria set out in Table 2.
Table 1 Criteria Determining a Mandatory Need for Environmental Assessment
Criteria relating to Environmental Sensitive localities
(a) Areas and ecosystems meriting special protection under national and
international law including coral reefs, mangroves, native forest, small
islands, areas at risk from erosion including sand dunes and beaches, areas
exposed to desertification, marshland, wetlands and areas with flora, fauna
or ecosystems on the verge of extinction.
(b) Fish spawning areas and areas containing important natural resources such
as medicinal plants
(c) Important water sources including springs, headwater catchments of rivers,
and watercourses or water bodies providing public water supplies.
Criteria relating to Socially or Economically significant localities
(d) Populated areas where more than 50 properties or 500 people might be directly
or indirectly affected in terms of livelihoods.
(e) Populated areas where it might be necessary to resettle any individual
inhabitants involuntarily.
(f) Populated areas where more than 50 properties or 500 people live in close
proximity to the area of potential operations and could be affected adversely
by noise, dust or other pollutants.
(g) Areas within which there are already conflicts in terms of ownership, use and
distribution of natural resources.
(h) Areas containing sensitive receptors including proximity to hospitals and
health centres
(i) Applications in areas adjacent to ports and airports where development
activities could adversely affect operation of these facilities.
(j) Areas within or adjacent to important tourism resorts or tourism assets
Table 2 EPA Determination of the Class of EIA required based on the nature
and scale of planned operations
The class of assessment is guided by the aggregate score generated by the
Agency’s review of the applicant’s screening application. A total score for an
application is established by summing individual scores from tables 3 and 4 in the
Second Schedule.
Agency staff will be guided by the applicant’s own assessment of the severity of
any potential Impact but may alter the weight / score at their discretion where they
have reason to believe that the effects of the project may be more or less significant.
Any alteration in the score allocated to individual topics shall be highlighted on a
copy of the screening application and forwarded to the applicant with the EPAs
screening decision.
84 85
The Agency shall exercise its discretion in terms of the categorisation of
applications and is not bound by the absolute scores set out in the table below
which provide guidance only.
Category Physical Social and Economic Type of Assessment
Environment Score Score Likely to be required
A Over 150 Over 20 EIA and SIA
B 130-150 5-20 EIA (including SIA)
C 50-130 Under 5 ESHIA
D Under 50 0 Code of Practice
Table 3
Indication of the application of scores to broad categories of assessment
3. Physical Environment (Mark the relevant sections with an X)
3.1 Land Surface
Description 1 2 3 4 5
Less than 1 to 10 10 hectares 1 to 100 More than
1 hectare hectares to 1 km2 km2 100 km2
Surface area of land
affected by surface
disturbance with
machinery or excavations
Area of vegetation to be cleared
Area of farmland affected
3.2 Land Excavation
If the operations involve Less than 10m3 to- 100m3 to 1 million to More than
excavation what quantity 10 m3 100m3 1 million m3 100 million m3 100 million
of material will be moved? m3
What is likely to be the Less than 3 to 15 feet 15-30 feet 30 to 150 feet More than
maximum depth of 3 feet (1-5 metres) (5-10 metres) (10-50 metres) 150 feet
excavation from (1 metre) (>50 metres)
existing surface
level
Ratio of overburden to 0:1 1:1 Between 1:1 Between 5:1 More than
mineral ore recovery and 5:1 and 20:1 20:1
3.3 Water
Description
Less than 100 to 1000 to 50,000 to Over
100 m3 1000m3 50,000m3 100,000m3 100,000 m3
Volume of water to be
abstracted by gravity or
pumping from a natural or
artificially constructed
water course or water body
(maximum over one month)
Volume of water to be stored
in tanks/settling ponds or
other artificial storage areas
Volume of waste water
(including drilling mud)
to be produced
(maximum over one month)
creating a dam or impoundment
on any watercourse, or
dredging operations?
diverting an existing water
course?
86 87
3.4 Wildlife and Nature Conservation
Does the application area N o Yes
include any official protected
area?
Has an ecological survey been Yes N o
undertaken by a qualified
biologist?
Are any rare or endangered N o Yes
species of plants or animals
found within the application
area as listed in national or
international registers?
In the applicants’ opinion Not at all Very slight Some minor Moderate Major
will the operations affect wild effects adverse adverse adverse
life and nature conservation impacts impacts impacts
in the application area? which can which can
be mitigated be mitigated
3.5 Natural Resources
Will the operation require N o Yes
the use of local timber, stone,
clay or other building materials
3.6 Infrastructure
Do existing tracks and roads footpaths Minor Dirt/ Un-surfaced Regional
lie within the application tracks graveled District Roads and Paved
area? feeder roads Roads
Will any tracks and roads footpaths Minor Dirt/ Un-surfaced Regional
be used by mineral traffic? tracks gravelled District Roads and Paved
feeder roads Roads
How many truck movements Less than 3 3 to 10 10 to 20 20 to 50 More than 50
of over 3 tonnes capacity
will use public roads in an
average month?
diversion or construction metres to 1 Km 10 kms 10 kms
of new roads?
diversion or construction of metres to 1 Km 10 kms 10 kms
new railways?
Does the project involve the N o Yes Yes
use of existing ports or the (existing ports) (new ports)
construction of new ports?
Does the project involve the
use of air transport from
existing or new airports? N o Yes Yes
(existing airports) (new airport)
3.7 Energy
Will the proponent provide Yes N o
all energy requirements from
the company’s own resources?
What is the estimated annual Less than 5000 - 50,000 to 100,000 kw More than
electricity requirement of the 5000 kw 50,000 kw 100,000 kw to 1 mw 1 mw
operations?
What is the estimated annual Less than 50,000 to 100,000 to 500,000 to More than
requirement of the operations 50,000 litres 100,000 litres 500,000 litres 1 million litres 1 million
with respect to diesel oil and litres
other petroleum products?
3.8 Buildings, Structures and Processing Plant
Will the operations include Temporary Permanent Permanent Permanent Permanent
erection of buildings and buildings buildings/ buildings/ buildings/ buildings/
structures/plant? and structures structures structures structures structures
erected for covering covering covering covering
<5 years less than 100m2 to 500m2 to more than
100m2 500m2 1000m2 1000m2
88 89
.
3.9 Emissions & Waste
Will the operations generate N o Yes
solid waste requiring
disposal through land fill?
Will the operations involve N o Yes
processes giving rise to
gaseous emissions
potential to generate dust
which would impact on
local inhabitants?
potential to generate noise
which could adversely affect
local inhabitants?
Will the operations require the N o Yes
use of chemicals and reagents
in on-site processes
Will the operations pose any form N o Yes
of risk to humans from potential
accidents and the creation of
hazards (e.g. deep bodies of
water/rock falls)
Will the operations create N o Yes
unsightly visual impacts
affecting the setting of villages
or towns?
If the answers to any of the above questions on emissions are “Yes”, provide summary details on the scale and
nature of the potential effects.
Table 4Review of the Applicant’s Assessment of the scale and likely effects of
the mining activities on the local economy and social conditions within the area of
mining operations
4.1 Resettlement
Will the operations N o Yes
require resettlement
of people?
If the answer to the question above is YES then score the assessment of effects as shown
below:-
Description /Impact Not at all Very slight Some minor Moderate Major
Will the operations affect effects adverse adverse adverse
directly or indirectly existing impacts impacts impacts
settlement(s): which can which can
be mitigated be mitigated
Complete only one of
the following
with more than 500 houses? 0 25 30 35 40
with 100-500 houses? 20 25 30 35
with 50 -100 houses? 15 20 25 30
with 25 50 houses? 10 15 20 25
With fewer than 25 houses? 5 10 15 20
Where the answer to the above questions on settlements and properties is “Yes” provide details on the estimated
number of properties and individuals involved
90 91
4.2 Effects on current land use activities
Will the operations displace Not at all Very slight Some minor Moderate Major
or reduce the viability effects adverse adverse adverse
of existing land uses for: impacts impacts impacts
which can which can
be mitigated be mitigated
Agriculture
Forestry
Rural livelihoods
(collecting roots/
fruits/ honey etc.)
Tourism
Will the operations affect:
Monuments/archaeological sites
Sacred groves
Burial areas
FOURTH SCHEDULE - PREPARATION OF A SCOPING REPORT
(REGULATION 14 (1) )
1. Content of the Scoping Report
In accordance with Regulation 15, the applicant for an environmental licence shall
prepare and submit a Scoping Report to the Agency before commencing detailed
investigations as part of an environmental impact assessment for a Category A or
B Project.
The Scoping Report will typically consist of a document, 20 to 60 pages in length
and will cover the following information:
CONTEXT
1.1 Name of the project
1.2 Particulars of the applicant for an Environmental Licence
1.3 Information on the environmental firm engaged to work
on the EIA
Including where relevant, information on individual experts who are
engaged to work on specific aspects of the assessment
1.4 A Description of the Project Proposals
(a) Site Area
(b) Nature of the project (exploration, pre-feasibility study,
feasibility study, small-scale mining, large scale mining)
(c) Timescale of operations
1.5 Environmental Baseline Conditions
This shall include the following:
(1) Topography and relief
(2) Climatic conditions,
92 93
(3) Air quality
(4) Water and drainage
(5) Geology and soils
(6) Flora and fauna
(7) Landscape character and quality
(8) Human settlement
(9) Land use
1.6 Potential Areas of Environmental Impact
A one paragraph description of the potential areas of environmental impact that
could arise during each phase of the planned activity in relation to each of the
environmental topics described in the baseline.
1.7 Scope for Avoiding, Mitigating or Compensating for Potential Adverse
Environmental Impacts
A one paragraph statement on the scope for minimizing significant environmental
impacts in relation to each of the environmental topics described in the environmental
baseline.
1.8 Programme of Work
This shall contain a summary of investigations to be undertaken in relation to each
area of potential environmental impact.
FIFTH SCHEDULE–EIAT STANDARDS FOR CATEGORYA AND B
PROJECTS (REGULATION 15 (1) (e))
These standards provide generic Terms of Reference (ToRs) for the preparation of
EIAs for Category A and B mining activities.
Applicants for Environmental Licences shall adapt the ToRs to meet the specific
characteristics of their development project and the environmental and social
conditions in the project area.
1. General Provisions for an Environmental Impact Assessment Report
The Environmental Impact Assessment report records the findings of exhaustive
studies undertaken as part of the assessment process. The principal findings shall
be included in the main report, supported by a stand-alone Non-Technical Summary.
Background information, detailed maps and statistical data may be added as
appendices or set out in separate volumes.
(1) Applicants shall ensure that all aspects of the bio-physical environment are
addressed when applying for an exploratory, small scale or large scale mining
project.
(2) The EIA shall contain a section on methodology and give a clear statement
about the processes of public consultation that has been employed.
(3) The EIA shall contain a chapter outlining the characteristics of the planned
activity and the physical development of infrastructure and these features
shall be clearly shown on a map of appropriate scale.
(4) A description of the current baseline conditions and likely trends in the
absence of the planned development shall be provided.
(5) Potential environmental impacts shall be identified in relation to topography,
geology, soils, land use, flora and fauna, water, drainage, climate, air, human
beings (unless covered in a separate Social Impact Assessment), and the
interactions between these topics.
94 95
(6) Impacts shall be described in terms of potential scale, magnitude,
significance, for example, major, minor and likely duration, for example, short
term, medium term, long term and reversibility or irreversibility.
(7) Any economic or physical alternatives to the proposed form of development.
(8) A Non-Technical Summary written in plain English such that a layman would
be able to understand.
2. Content of the EIA Report
The Environmental Impact Assessment report shall include the following:
I CONTEXT
1.1 Name of the project
1.2 Particulars of the applicant for an Environmental Licence
1.3 Information on the environmental firm that produced the EIA
Identity document/registration details:
II TABLE OF CONTENTS
This section shall contain an index of the EIA.
III EXECUTIVE SUMMARY
The executive summary shall be written in plain English and in a form that is
accessible to all potentially affected parties. It shall include summarized information
on the following:
(1) Project description
(2) Environmental impacts of the project
(3) Environmental management plan, monitoring plan and closure plan
(4) Public participation plan
IV INTRODUCTION
(1) Brief history of the project
(2) Other mining projects under the applicant’s control that are planned or in
progress in the same area
(3) Other associated projects
(4) Previous environmental management instruments
(5) Benefits of the project (locally and regionally)
(6) Legal framework
(7) Methodology adopted for the environmental assessments (to be
expanded, as necessary, in technical appendices for individual specialist
topics; e.g. measuring air pollution).
V DESCRIPTION OF THE PROJECT
The description of the project shall contain the following information as applicable:
5.1 General information on the project
(1) Type of mining activity (exploration, artisanal mining, small scale mining,
large scale mining, dredging mining, radioactive substances mining and
sand miningetc.)
(2) Project location (district, chiefdom, village, section)
(3) Blocks that comprise the project area, indicating UTM coordinates
96 97
(4) The extent of the project area in hectares
(5) Minerals to be explored or produced
(6) Proven and probable mineral reserves
(7) Estimated production
(8) Estimated productive life of the mine
(9) Phases of the project and chronogram
(10) Duration of the project
(11) Estimated date for the beginning of operations
(12) Workforce (permanent and temporary workers)
(13) Total investment and financial sources
5.2 Works and logistics
(1) Earthwork (volume of soil to be moved)
(2) Volume of water required and water sources (for mining purposes and
domestic and human consumption)
(3) Water and wastewater treatment plants
(4) Natural resources demand (timber, flora and fauna, etc.)
(5) Waste rock deposits
(6) Electricity requirements and sources
(7) Power plants
(8) Fuel supply and storage
(9) Mineral transportation system
(10) Buildings, camps, other facilities
(11) Equipment and machinery
(12) Roads to be constructed in kilometres
(13) Port facilities
5.2.1 Specific information for exploration projects
(1) Exploration plan and method
(2) Exploratory boreholes and drilling techniques
5.2.2 Specific information for mining projects
(1) Mining plan and method
(2) Excavation, open pit, underground mining, placer
(3) Mine development
(4) Type of explosives to be used
5.2.3 Specific information for beneficiation projects
(1) Mineral processing and metallurgy methods
(2) Beneficiation plants and associated facilities (crusher, grinder, mill,
concentrator, leaching pads, smelter, refinery, conveyors, cable cars,
pipelines, tailings dam, reservoirs, etc.)
(3) Ore and concentrates storing facilities
5.3 Permits
(1) Permits required (i.e. water use, effluent treatment)
(2) Permits obtained
(3) Private agreements (i.e. easements, land leasing)
5.4 Maps
(1) Location map (1/25,000) depicting the following:
(a) Project area and area of influence
(b) Topography and relief
(c) Access roads
(d) Urban areas and areas of urban expansion
98 99
(e) Populated rural areas
(f) Agriculture areas, cultivated areas, and areas with agricultural potential
(g) Protected areas
(h) Water bodies, wetlands, forests
(2) Land use map (1/500 or 1/1000) depicting the following:
(a) Water supply and sewerage network
(b) Electric power supply network
(c) Site facilities layout (comprises any construction or works that modifies
the preoperational landscape such as tunnels, open pits, plants, buildings, camps,
roads, waste rock dumps, tailing channels, tailing dams, slag deposits, mineral
transportation, etc.)
(d) Land owned by the applicant
(e) Land owned by third parties
(3) Geology mapand geology report
VI BASELINE
This Section describes the characteristics of the environment in the project area
and area of influence before the implementation of the proposed project.
6.1 Physical environment
(1) Climate and meteorology (atmospheric conditions, temperature, humidity,
rainfall, winds, storms, barometric pressure, etc.)
(2) Topography, geology, geomorphology, stratigraphy, geochemistry
(3) Hydrography, hydrology, hydrogeology, hydraulic balance
(4) Land use capacity
(5) Air, soil, water and ground quality
6.2 Biological environment
(1) Biological diversity
(2) Flora and fauna (terrestrial and aquatic) distribution, conservation status,
endemic species, and endangered species
(3) Fragile ecosystems (deserts, mountains, wetlands, forests, other.)
(4) Protected areas and buffering zones
(5) Scenic beauties
6.3 Social environment
(1) Demographic indicators
(2) Population distribution
(3) Social organization
(4) Ethnic groups
(5) Public health
(6) Economy and labour
(7) Goods and services
(8) Residential location
(9) Land ownership and use
(10) Use of natural resources
(11) Recreation
(12) Utilities and services
(13) Transportation services
(14) Quality of life indicators
(15) Cultural heritage
(16) Areas of historical, cultural or scientific interest
(17) Vulnerability
100 101
6.4 Areas already disturbed
(1) Areas already disturbed by previous mining activities
(2) Areas already disturbed by other previous activities
(3) Current third party’s activities disturbing the area
(4) Other elements that represent a menace to the conservation of natural
habitats and ecosystems
VII ENVIRONMENTAL IMPACT
In this Section the applicant shall describe possible significant environmental
impacts of the project if implemented. The description shall refer to each phase of
the project (exploration, construction, operation, closure and post-closure) and
shall indicate the affected environmental element and the action that caused the
impact.
Significant impacts shall be determined based on the analysis of the impact’s
characteristics: nature, extent, timing, probability, reversibility, duration and
magnitude.
7.1 Exploration
7.2 Construction phase
7.3 Operational phase
and 6.3above.
7.4 Closure phase
Describe remaining impacts after implementing the environmental management
plan.
7.5 Post-closure phase
Describe potential impacts from a closed operation. These impacts may comprise
amongst others, acid drainage, long-term stability of ground or closed tailing dams.
VIII ENVIRONMENTAL MANAGEMENT PLAN
This Section summarises the measures and actions to be taken by the applicant
during each phase of the project to avoid, mitigate or compensate each significant
environmental impact identified in Section VI of this document. This information is
included in the stand-alone Environmental Management Plan (EMP) and includes
a budget for all works. Further guidance on the preparation of the Environmental
Management Plan is given in the Tenth Schedule.
The set of measures which are proposed for control of environmental impacts
during each phase of the project (preventive measures, mitigation and
compensation) shall be summarized in a table as illustrated below.
Phase Environmental Preventive Mitigation Compensation
impact
Construction Oil spill into a river Immediate clean
up measures:
application of
oil dispersant and
oil capture
Operation Ground water Installation of
pollution from geomembrane
tailings pond. underneath soil liner
Closure Environmental Construction of
alteration due to artificial lagoon
open pit not suitable by filling the pit
for restoration to with water, in benefit
original topography of migratory birds
and recreational
activities for the
community
IX ENVIRONMENTAL CONTINGENCY PLAN
This Section shall contain an Environmental Risk Assessment (ERA) and an
Environmental Contingency Plan (ECP).
102 103
The ERA analyses the probability of an extreme accidental or natural event causing
significant adverse effects on the environment and human health within the project
area and/or in the project’s area of influence. The ERA shall determine the likelihood
of the event and the magnitude of the consequences.
The ECP shall establish control measures to be applied in case of the occurrence of
emergency situations detailed in an ERA.
X MONITORING PLAN
This Section describes the proposed plan for assessing the effectiveness of
environmental control measures (preventive measures, mitigation and
compensation) set forth in the EMP. It shall refer to environmental standards
approved by law or, if such laws are not provided, to internationally acceptable
standards.
The Monitoring Plan shall indicate the following;
(1) Environmental aspects to be monitored
(2) Monitoring and inspection methodology
(3) Inspection frequency
(4) Location of monitoring stations
(5) Reporting schedules
(6) Equipment and supplies
(7) Administration
(8) Technical team
XI CLOSURE PLAN
This Section describes the closure plan for mining operations at a conceptual
level. The Conceptual Closure Plan will form the basis for developing a
comprehensive Closure Plan as required in Section 47 of these Regulations and the
standards in the Ninth Schedule.
The Closure Plan shall comprise decommissioning and rehabilitation of all
components of the mining operations (exploration roads, boreholes, mine pits,
waste dumps, plant sites, etc.), during each phase of the project, including
progressive or concurrent reclamation, closure and post-closure measures.
The Closure Plan shall describe the intended plans for the post-mining sustainable
use of the project area.
XII COMMUNICATION AND PUBLIC PARTICIPATION PLAN
A communications plan shall be developed to manage public participation and the
participation of stakeholders in the process of project planning, identification of
environmental and social impacts, follow-up and monitoring. It shall indicate how
public consultation is to be conducted (public hearings, workshops, media, etc.),
how the community’s principal concerns about the project will be identified and
how these will be managed by the applicant.
XIII ANALYSIS OF ALTERNATIVES TO THE PROPOSED PROJECT
This Section describes other alternatives to the project (such as different location,
alternative mining methodologies, substitutes to target minerals, etc.) and explains
why the project design is the best in terms of environmental protection and social
development.
SIXTH SCHEDULE - SIA STANDARDS (REGULATION 15 (1) (b))
1. SIA General Principles
The Social Impact Assessment shall be carried out in accordance with the following
principles -
(1) the mineral right holder shall ensure compliance with all human rights treaties
to which Sierra Leone is a party at any time;
(2) the diversity of interests and cultures of the many different social actors
involved in, and affected by, mining and mining related activities shall be
duly acknowledged and respected;
(3) every effort shall be made to protect local cultures and traditions;
104 105
(4) assessment of the social dimension of mining and mining shall be designed
to help identify the best project options and alternatives, to minimise
negative social impacts and to identify sustainable development
opportunities;
(5) strong emphasis shall be placed on engaging local knowledge and
experience; these resources combined with expert judgment, are fundamental
inputs for enhancing project planning and decision-making processes;
(6) the mining project shall recognize that development of social and human
capital is of primary importance when engaging communities in sustainable
development projects and knowledge transfer from skilled to un-skilled
workers shall play a major role in company employment policies;
(7) every effort shall be made by the applicant to recruit workers and retain the
services of local enterprises from the local community and/or the Primary
Host Community,
(8) materials, food and other resources shall be sourced from the local
communities,
(9) the holder of a mineral right shall engage social and economic experts
periodically throughout the mine life cycle to monitor compliance with its
social and environmental obligations; and
(10) if, under the best scientific advice and feasible mitigation measures it is
concluded that a planned intervention poses considerable threats to the
health or survival of a community that intervention shall not proceed.
2. General Provisions on Social Impact Assessment
Applicants shall apply the same principles on Social Impact Assessment to all
levels of assessment from exploratory and small scale mining to large scale mining.
(1) The SIA shall contain a section on methodology and give a clear statement
about the processes of public consultation and public participation that
have been employed.
(2) The SIA shall contain a socio-economic and cultural overview of the locality
(3) The SIA shall include a baseline description and identify and assess potential
social impacts on land, property, labour requirements, the work force and
other social aspects of the proposals.
(4) The SIA shall contain a map identifying all human settlements, including
villages and towns within their respective chiefdom jurisdictions.
(5) The SIA shall include a chapter setting out a Social Impact Management
Plan (SIMP) with measures designed to prevent, mitigate or compensate for
social impacts. Furthermore, monitoring activities, timeframes and estimated
costs shall be included in the SIMP.
3. Scoping Study and Report
(1) Following confirmation from the Agency that a Social Impact Assessment
is required for a Category A or B Mining Project, the applicant will undertake
a scoping study and prepare a scoping report.
(2) The scoping study will examine:
(a) The basic social characteristics of the proposed licence area and
its surroundings;
(b) Any specific local language requirements to ensure that all public
participation and public consultation processes reach affected
communities;
(c) The main economic activities, in addition to mining, that is taking
place or are being promoted within the region.
(d) The main requirements of the project for skilled and unskilled
labour, materials and services that could be provided from the
local communities.
(e) A preliminary assessment of the likely range of adverse and
beneficial social impacts.
106 107
(f) Requirements for negotiations over land and other natural
resources.
(3) The findings of the scoping study will be written up in a report not exceeding
60 A4 sides of paper.
(4) The Scoping Report will be submitted to the Agency and any
recommendations from the Agency will be carefully considered and
incorporated as appropriate in a final document.
(5) The Final Scoping Report shall be published on the Company’s website
(where this exists) and copies shall be provided to the District Authorities
and Chiefdoms’ administrative offices for public display and access.
4. Non-Technical Project Brief
The applicant for an environmental licence shall prepare a Non-Technical Project
Brief which summarises the essential characteristics of the planned project in terms
of the likely area of land required, the nature of the mine site in terms of area and
depth, the type of extraction process envisaged, options for disposing of rock,
sand and tailings waste, the type of buildings and structures to be erected, and the
quantities of materials and means of transportation for transferring mine products
for further processing or to ultimate markets.
The non-technical project brief shall be published and copies provided to the
District Authorities and Chiefdoms’ administrative offices for public display and
access.
5. Formation of Community Liaison Committee
A community liaison committee shall be formed in accordance with Section 5 of
these Regulations as soon as it becomes apparent to the applicant that the project
is likely to involve negotiations with the local community and Primary Host
Community over any aspect of social cultural and local economic activities. This
need is certain to arise with large scale mining and will also apply to most small
scale mining projects.
6. Public Participation and Consultation
The applicant shall arrange for full public disclosure of the Scoping Report and
Non-Technical Project Brief. In addition a communications plan shall be prepared
and followed in accordance with the First Schedule.
7. Stakeholder participation
When undertaking the analysis of social and local economic issues the applicant
shall actively engage local stakeholders including village communities, individuals
and local enterprises such as agricultural cooperatives, education, gender and
youth empowerment groups, market traders and educational, health and social
workers. A full list of stakeholders’ names, positions and contact details shall be
kept by the applicant and published in the draft SIA report.
8. Undertaking the Social Impact Assessment
The process of undertaking the Social Impact Assessment shall include:
(1) identifying, analyzing, managing, and monitoring the negative and
positive, intended and unintended consequences of reconnaissance,
exploration, small-scale, and large-scale mining operations, and any kind
of social and cultural change that these interventions may generate;
(2) a public consultation process through which to identify, analyse, manage,
and monitor potential social impacts;
(3) a participatory processes with the aim of strengthening the role of women,
youth, and marginalized segments of society in development planning,
bringing about higher levels of social inclusion and a more equitable
distribution of benefits.
(4) a strategy identifying how the applicant plans to obtain the community’s
support for the project and strengthen ties with it throughout the entire
life of the project, including preparing the community for closure and
post-closure phases.
9. Draft SIA report
The results of the social and local economic analysis shall be written up in a draft
108 109
Social Impact Assessment and submitted for comment to the Agency. The draft
findings shall also be presented to the stakeholders identified in (7) above.
10. Review by the Environment Protection Agency
Following review by the Agency and, where appropriate, by the Resettlement
Committee, the applicant shall revise the draft SIA report to take account of these
views.
11. Publication of the Social Impact Assessment Report
The Company shall make the findings of the SIA public by making them available
for the public to review through a variety of medium which may include periodic
radio broadcasts, publication at local town halls, community halls and/or public
notice boards, adjourning meetings with local communities and dissemination
amongst local civil society groups, as appropriate.
12. Components of SIA Report
A Social Impact Assessment Report shall include the following:
(1) Social baseline description
(2) Potential impacts and analysing alternatives
(3) Maximising development opportunities and mitigation of negative
impacts
(4) Benefit and Impact plan
(5) Monitoring Plan
(6) Evaluation Plan
13. Content of the SIA Report
The Social Impact Assessment Report shall include the following:
I CONTEXT
1.1 Name of the project
1.2 Particulars of the applicant for an Environmental Licence
1.3 Information on the Social Impact assessors and company that produced
the EIA
II PREAMBLE AND TABLE OF CONTENTS
The preamble shall provide:
(1) Acknowledgements: identifying the principal contributors and
stakeholders who have rendered assistance to the assessment team.
(2) Key sources of information
(3) Definitions and abbreviations. Defines all words, expressions and
abbreviations that a layperson cannot be expected to know.
110 111
The contents list shall contain an index of the SIA.
III EXECUTIVE SUMMARY
Discusses significant findings and recommended actions in a non-technical
language (layperson’s language). It shall include summarized information on the
following:
(1) Project description
(2) Social and local economic impacts of the project
(3) Social impact management plan, social monitoring plan and social
components of the mine closure plan
(4) Public participation plan
IV INTRODUCTION
(1) Brief history of the project
(2) Other mining projects under the applicant’s control that are planned or in
progress in the same area
(3) Other associated projects
(4) Previous environmental management instruments
(5) Benefits of the project (locally and regionally)
(6) Legal framework
(7) Methodology adopted for the social impact assessments (to be expanded,
as necessary in technical appendices for individual specialist topics).
V POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK
This chapter discusses the policy, legal and administrative framework within which
the SIA is carried out, including relevant international agreements to which Sierra
Leone is a party.
VI DESCRIPTION OF THE PROJECT
This chapter summarises the proposed project and its geographical, social and
temporal context, including any off-site developments that may be required (e.g.
access roads, power plants, water supply, housing, storage facilities). Relevant
maps are to be included showing the project site and area of influence.
The description of the project shall contain the following information as applicable:
6.1 General information on the project
(1) Type of mining activity (exploration, artisanal mining, small scale mining,
large scale mining, dredging mining, radioactive substances mining)
(2) Project location (district, chiefdom, village, section)
(3) Blocks that comprise the project area, indicating UTM coordinates
(4) The extent of the project area (hectares)
(5) Minerals to be explored or produced
(6) Proven and probable mineral reserves
(7) Estimated production
(8) Estimated productive life of the mine
(9) Phases of the project and chronogram
(10) Duration of the project
(11) Estimated date for the beginning of operations
(12) Workforce (permanent and temporary workers)
(13) Total investment and financial sources
112 113
6.2 Permits
(1) Permits required (i.e. water use, effluent treatment)
(2) Permits obtained
(3) Private agreements (i.e. easements, land leasing)
6.3 Maps
(1) Location map (1/25,000) depicting the following:
(a) Area and area of influence
(b) Topography and relief
(c) Access roads
(d) Urban areas and areas of urban expansion
(e) Populated rural areas
(f) Agriculture areas, cultivated areas, and areas with agricultural
potential
(g) Protected areas
(h) Water bodies, wetlands, forests
(1) Land use map (1/25000) depicting the following:
(a) Water supply and sewerage network
(b) Electric power supply network
(c) Site facilities layout
(d) Land owned by the applicant
(e) Land owned by third parties
VII SOCIAL BASELINE
This Section describes relevant social and economic conditions in local communities,
the region and Sierra Leone at large, including any changes anticipated before the
project commences. Quantitative parameters are provided where possible.
7.1 Demographic Indicators
(1) Population number, density and distribution
(2) Population age profile
(3) Male/Female ratios
(4) Children under 18
(5) Average life expectancy
(6) Population growth
(7) Migration
(8) Fertility rates
7.2 Community and Social Organisation
(1) Role of Chiefdoms
(2) Local authority structure, powers, capabilities
(3) Informal administration structures
(4) Cultural diversity, ethnic groupings and religion
(5) Local customs and taboos
(6) Vulnerable and disadvantaged groups
114 115
7.3 Housing
(1) Housing stock
(2) Housing condition
(3) Housing demand
7.4 Education
(1) Child Education
(2) Youth education and training
(3) Adult education and training
7.5 Public Health
(1) Mortality rates
(2) Morbidity rates
(3) Maternal welfare (pre/post natal)
(4) Infectious diseases
(5) Nutrition levels
(6) HIV/AIDs
7.6 Economy and Livelihoods
(1) Economic structure
(2) Livelihoods
(3) Business Enterprises
(4) Employment
(5) Unemployment
(6) Goods and services
(7) Market trading
7.7 Land ownership and use
7.8 Use of natural resources
7.9 Utilities and services
7.10 Intangible Assets
(1) Quality of life indicators
(2) Cultural heritage
(3) Areas of historical, cultural or scientific interest
VIII SOCIAL AND LOCAL ECONOMIC IMPACT
In this Section the applicant shall describe possible significant socio-economic
impacts of the project if implemented. The description shall refer to each phase of
the project (exploration, construction, operation, closure and post-closure),
indicating the affected socio-economic element and the action that caused the
impact. The assessment of socio-economic impacts shall take into account relevant
local, regional or national development plans.
Significant impacts shall be determined based on the analysis of the impact’s
characteristics: nature, extent, timing, probability, reversibility, duration and
magnitude.
8.1 Exploration
8.2 Construction phase
8.3 Operational phase
116 117
8.4 Closure phase
Describe remaining impacts after implementing the environmental management
plan.
8.5 Post-closure phase
Describe potential impacts from a closed operation. These impacts may comprise
acid drainage, long-term stability of ground or closed tailing dams, among others.
IX SOCIAL IMPACT MANAGEMENT PLAN
This Section describes the set of measures and actions to be taken by the proponent
during each phase of the project to avoid, mitigate or compensate each significant
socio-economic impact identified in Part VII of this Schedule. The Social Impact
Management Plan (SMP) shall include a budget. Further guidance on the preparation
of a social impact management plan is given in the Eleventh Schedule.
The set of proposed measures to control environmental impacts for each phase of
the project (preventive measures, mitigation and compensation) shall be summarized
in the table below (see example in Italics
Phase Socio-Economic Preventive Mitigation Compensation
impact
Construction
Operation
Closure
X COMMUNITY DEVELOPMENT PLAN
The Social Impact Assessment shall include a chapter which summarises the state
of negotiations between the applicant for an environmental licence and the Primary
Host Community being undertaken in accordance with Section 140 of the Mines
and Minerals Act 2009. An outline of the content and main proposals of the
Community Development Plan shall be included together with the programme for
finalizing this document and, where appropriate, arrangements for entering into a
Community Development Agreement.
XI SOCIO-ECONOMIC CONTINGENCY PLAN
This Section shall contain a Social and Economic Risk Assessment (SERA) and a
Socio-Economic Contingency Plan (SECP).
The SERA analyses the possibility of an extreme accidental or natural event causing
significant adverse effects on the social fabric and human health within the project
area and/or in the project’s area of influence. The SERA shall determine the event
likelihood and the magnitude of the consequences.
The SECP shall establish control measures to be applied in case of emergency
situations described in the SERA.
XII SOCIO-ECONOMIC AND HEALTH MONITORING PLAN
This Section describes the proposed plan for assessing the effectiveness of socioeconomic and health control measures (preventive measures, mitigation and
compensation) set forth in the SIMP. It shall refer to socio-economic and health
standards and standards approved by law or, in the absence of such laws, to
internationally acceptable standards.
The Monitoring Plan shall indicate the following;
(1) Socio-economic and health aspects to be monitored
(2) Monitoring and inspection methodology
(3) Inspection frequency
(4) Location of monitoring stations
(5) Reporting schedules
(6) Equipment and supplies
(7) Administration
(8) Technical team
118 119
The Evaluation of monitoring results will form a key output from the socio-economic
and health monitoring plan. The results shall be carefully considered by the
environmental licence holder and acted upon in implementing the social impact
management plan.
XIII SOCIAL AND ECONOMIC COMPONENTS OF THE CLOSURE
PLAN
This Section describes the mine closure plan for mining operations at a conceptual
level. The Conceptual Closure Plan will form the basis for developing a
comprehensive Mine Closure Plan as required in Section 47 of these Regulations
and described in more detail in the Ninth Schedule.
The Mine Closure Plan shall comprise decommissioning and rehabilitation of all
components of the mining operations (exploration roads, boreholes, mine pits,
waste dumps, plant sites, etc.), during each phase of the project, including
progressive or concurrent reclamation, closure and post-closure measures.
The Mine Closure Plan shall describe the intended post-mining sustainable use of
the project area.
XIV COMMUNICATIONS AND PUBLIC PARTICIPATION PLAN
The Communications and Public Participation Plan shall describe the participation
of stakeholders in the process of project planning, identification of environmental
and social impacts, follow-up and monitoring. It shall indicate what are the means
for public consultation to be used (public hearings, workshops, media, etc.), what
the community’s principal concerns about the project are and how these plan to be
managed by the proponent.
XV ANALYSIS OF ALTERNATIVES TO THE PROPOSED PROJECT
This Section describes other alternatives to the project (such as different location,
alternative mining methodologies, substitutes to target minerals, etc.) and indicates
how the community and surrounding district would possibly develop if the project
is not realized, for example, in terms of potential social impacts; and reasons why
these alternatives have not been chosen.
SEVENTH SCHEDULE–ESIA STANDARDS (REGULATION 15 (1) (C))
1. Environmental and Social Impact Assessment (ESIA) Procedures
These standards set out the procedures for conducting a simplified form of
environmental, social and health impact assessment for those Category C projects
identified in Regulation 13 that do not require a comprehensive Environmental
Impact Assessment or Social Impact Assessment.
The Regulations and these standards recognise that there are some forms of
exploration and small-scale mining activity that are unlikely to have major
environmental, social or health impacts. These operations may typically involve:
(1) extraction of small quantities of ore for bulk sampling during mineral
exploration
(2) small quarries used for the extraction of building stone
(3) small scale sand and gravel pits
Very occasionally, other small scale mining operations may qualify for the simplified
form of assessment if the type of mineral extraction allows for rapid restoration of
worked out areas and there are no important or sensitive environmental habitats or
social issues on the mine site or the surrounding area.
For the avoidance of doubt no large scale mining operations will qualify for simplified
assessment using ESIA.
2. Conduct of an Environmental and Social Impact Assessment
Applicants for a Category C Project Environmental Licence shall undertake a
combined assessment on environmental, social and health issues relating to the
project and prepare a report of not more than 100 pages including appendices.
The work shall be undertaken by assessors who are qualified and competent to
undertake the three core areas of assessment.
3. Content of the EIA Report
The Environmental Impact Assessment Report shall include the following:
120 121
I CONTEXT
1.1 Name of the project
1.2 Particulars of the applicant for an Environmental Licence
1.3 Information on the Environmental firm that produced the EIA
II TABLE OF CONTENTS
This section shall contain an index of the EIA.
III EXECUTIVESUMMARY
The executive summary shall be written in plain English and in a form that is
accessible to all potentially affected parties. It shall include summarized information
on the following:
(1) Project description
(2) Environmental, social and health impacts of the project
(3) Combined environmental, social and health management plan, monitoring
plan and closure plan
(4) Statement on public participation procedures
IV INTRODUCTION
The introduction shall contain the following:
(1) Description of the project
(2) Relationship to other developments under the applicant’s control or
ownership
(3) Benefits of the project
(4) Methodology adopted for the environmental assessments
V DESCRIPTION OF THE PROJECT
The description of the project shall contain the following information as applicable:
5.1 General information on the project
(1) Type of mining activity (exploration, artisanal mining, small scale mining,
large scale mining, dredging mining, radioactive substances mining)
(2) Project location (district, chiefdom, village, section)
(3) Blocks that comprise the project area, indicating UTM coordinates
(4) The extent of the project area (hectares)
(5) Minerals to be explored or produced
(6) Proven and probable mineral reserves
(7) Estimated production
(8) Estimated productive life of the mine
(9) Phases of the project and chronogram
(10) Duration of the project
(11) Estimated date for the beginning of operations
(12) Workforce (permanent and temporary workers)
(13) Total investment and financial sources
122 123
5.2 Works and logistics
(1) Earthwork (volume of soil to be moved)
(2) Volume of water required and water sources (for process, domestic and
human consumption)
(3) Water and wastewater treatment plants
(4) Natural resources demand (timber, flora and fauna, etc.)
(5) Waste rock deposits
(6) Electricity requirements and sources
(7) Power plants
(8) Fuel supply and storage
(9) Mineral transportation system
(10) Buildings, camps, other facilities
(11) Equipment and machinery
(12) Roads to be constructed in kilometres
(13) Port facilities
5.3 Specific information for exploration projects
(1) Exploration plan and method
(2) Exploratory boreholes, drilling techniques
5.4 Specific information for exploration projects
(1) Mining plan and method
(2) Excavation, open pit, underground mining, placer
(3) Mine development
(4) Type of explosives to be used
5.5 Specific information for beneficiation projects
(1) Mineral processing and metallurgy methods
(2) Beneficiation plants and associated facilities (crusher, grinder, mill,
concentrator, leaching pads, smelter, refinery, conveyors, cable cars,
pipelines, tailings dam, reservoirs, etc.)
(3) Ore and concentrates storing facilities
5.6 Permits
(1) Permits required (i.e. water use, effluent treatment)
(2) Permits obtained
(3) Private agreements (i.e. easements, land leasing)
5.7 Maps
Location map (1/25,000) depicting the following:
(1) Project area and area of influence
(2) Topography and relief
(3) Access roads
(4) Urban areas and areas of urban expansion
(5) Populated rural areas
(6) Agriculture areas, cultivated areas, and areas with agricultural potential
(7) Protected areas
(8) Water bodies, wetlands, forests
5.8 Land use map (1/500 or 1/1000) depicting the following:
(1) Water supply and sewerage network
(2) Electric power supply network
124 125
(3) Site facilities layout (comprises any construction or works that modifies
the preoperational landscape such as tunnels, open pits, plants,buildings,
camps, roads, waste rock dumps, tailing channels, tailing dams, slag
deposits, mineral transportation, etc.)
(4) Land owned by the applicant
(5) Land owned by third parties
5.9 Geology map and geology report
VI ENVIRONMENTAL, SOCIAL AND HEALTH BASELINE
This Section describes the characteristics of the environment in the project area
and area of influence under existing conditions (i.e. prior to the project development)
6.1 Physical environment
6.2 Biological environment
6.3 Social, local economic, health and environment
6.4 Areas already disturbed
The content of these sections shall draw on the fuller description of topics to be
covered under an EIA or SIA baseline, where these are relevant to the assessment.
VII POTENTIAL IMPACTS
In this Section the applicant shall describe possible significant environmental,
social and where relevant health impacts of the project if implemented. The
description shall be referred to each phase of the project (exploration, construction,
operation, and closure), indicating the affected environmental element and the
action that caused the impact.
Significant impacts shall be determined based on the analysis of the impact’s
characteristics: nature, extent, timing, probability, reversibility, duration and
magnitude.
VIII INTEGRATED ENVIRONMENTAL AND SOCIAL MANAGEMENT
PLAN
This Section describes the set of measures and actions to be taken by the applicant
during each phase of the project to avoid, mitigate or compensate the environmental
and/or social impacts identified in Section VII. The integrated environmental and
social management plan shall include an indicative budget for all works.
IX ENVIRONMENTAL AND SOCIAL RISKS
A chapter shall be included indicating any potential environmental or social risks
and the measures that will be taken to control such risks.
X INSPECTION AND MONITORING PLAN
A chapter shall be included setting out the measures that are proposed for
monitoring potential sources of environmental pollution and control measures to
avoid, mitigate or compensate for any adverse environmental or social impacts
XI CLOSURE PLAN
A chapter shall be included outlining the steps that will be taken to decommission
the mine and rehabilitate the site on completion of works.
The Mine Closure Plan shall describe the intended post-mining sustainable use of
the project area.
XII STATEMENT ON PUBLIC PARTICIPATION
A section shall be included in the report indicating the steps that have been taken
to consult the local community and the Primary Host Community and the measures
that will be followed to keep stakeholders informed throughout the mine life cycle.
XIII ANALYSIS OF ALTERNATIVES TO THE PROPOSED PROJECT
This Section shall describe other alternatives to the project (such as different
location, alternative mining methodologies, substitutes to target minerals, etc.)
and explain why the project design is the best in terms of environmental protection
and social development.
126 127
EIGHTH SCHEDULE - ENVIRONMENTAL CODE OF PRACTICE
(REGULATIONS 15 (1) (D) AND 55 (2) )
1. Application of the code of practice
This code of practice will be applied by all holders of mineral rights to their operations
in circumstances where:
(1) a declaration has been signed under oath that there will be no adverse
environmental, social or local economic impacts arising from the operations; and
(2) the Agency has issued a decision that an environmental licence is not
required and the code of practice shall apply.
2. Content of The Code of Practice
I. Land Surface
(1) The site(s) of operations shall be protected at all times by fencing or by
constant inspection to ensure that they pose no risk to the local
community and Primary Host Community and in particular children or
other vulnerable groups.
(2) All areas of land affected by the operations shall be reinstated to their
original condition following completion of the operations and such
reinstatement shall include the replacement of soil and reseeding or
replanting of vegetation, or in the case of productive land, re-cultivation
of the land to leave it in a state suitable for the growing of crops.
II. Land Excavation
Any excavation created as part of the operations shall be backfilled with inert
material or regarded to leave smooth free-draining contours with no depressions
or pits that could fill with water.
III. Water
(1) The holder of a mineral right shall ensure that no water supplies are
adversely affected or access to water is impaired by the operations for
any other users in the locality.
(2) In the event that the operations accidently cause a temporary break in
service or supply to any other users in the locality, the mineral right
holder shall provide alternative supplies and meet the full costs of
compensation for disruption of supply.
(3) In the absence of any agreement under (4) below, all pipes, tanks and
other receptacles used for water storage shall be removed on completion
of the operations.
(4) Pipes, tanks and other water storage receptacles may be retained on site
for use by the landowner or local community if this action is authorised
by the Agency following a written request from the holder of a mineral
right.
IV. Wildlife and Nature Conservation
The holder of a mineral right shall ensure that minimum disturbance is caused to
local habitats by the operations.
V. Natural Resources
(1) With the exception of the clearance of vegetation to permit activities to
proceed in accordance with the signed declaration, the operator
undertakes not to fell trees or cut timber or remove any other natural
resources from the site.
(2) The rights of local communities to collect roots, fruits, honey, medicinal
plants, fire wood and any other natural resources in the area shall be
respected.
128 129
VI. Infrastructure & Access
(1) Where any form of mineral traffic, including movement of plant takes
place on public access roads or tracks and the roadways are subject to
wear and tear from this traffic, the operator undertakes to maintain such
roads in a state which is as good as, if not better than it was prior to the
commencement of operations.
(2) Following closure of the operations the operator shall leave all access
roads used by mineral traffic in a condition which is as good as, if not
better than those at the start of operations.
VII. Energy & Fuel
(1) All equipment used for the transport or storage of diesel, oil and other
fuels will be maintained in safe and fully serviceable condition throughout
the life of the operations and shall be removed on completion of the
works.
(2) Areas used for the storage or transfer of diesel, oil and other fuels shall
be protected against accidental spillage with an impermeable membrane
(plastic or equivalent) laid beneath an absorbent surface.
VIII. Buildings, Structures and Processing Plant
(1) All buildings, structures and processing plant shall be maintained in a
safe and secure condition during the operations and will be removed on
completion of the operations, except under condition (2).
(2) Following completion of the operations, buildings may be retained on
site for use by the landowner or local community if this action is
authorised by the Agency following a written request from the holder of
a mineral right.
IX. Emissions & Waste
(1) The holder of a mineral right shall ensure that at all times throughout the
operations, any emissions to air, water or land are kept to an absolute
minimum and at levels that pose no risk whatsoever to the health of
workers, local inhabitants or wildlife.
(2) Drilling mud and all other reagents used in lubricating drill rods and
drilling equipment shall be contained in sealed circulatory systems and
recycled without discharge to the environment.
X. Social Conditions
(1) The holder of a mineral right shall ensure that all aspects of the operations
are controlled to the highest standards and do not give rise to any
disturbance or annoyance to persons living or working in the vicinity of
the operations.
(2) The holder of a mineral right shall be liable for any accidents caused to
members of the local community and/or the Primary Host Community
and in particular children or other vulnerable groups arising within the
area of the operations and shall be obliged to pay full compensation in
the event of injury or death or any individual.
XI. Land use
The holder of a mineral right shall ensure that the operations are conducted in
harmony with all surrounding land uses and shall undertake restitution with full
compensation in the event that any aspect of the operations leads to accidental
damage to neighbouring land uses.
130 131
NINTH SCHEDULE - MINE CLOSURE PLAN STANDARDS
(REGULATIONS 16(A), 33 (7) )
1. Objectives
The aim of these standards is to ensure that for every mining operation in Sierra
Leone a planning process is in place that ensures the mine can be closed,
decommissioned and rehabilitated in an ecologically and socially sustainable
manner consistent with the terms of the environmental licence.
The responsibility for opening, operating and closing a mine rests on the
environmental licence holder and mineral right holder and must be exercised without
unacceptable liability to the state.
Planning for mine closure should be an integral part of mine development and
operations planning. Consequently the level of information required should
correspond to the stage in the mine lifespan.
2. Principles and Approaches towards Mine Closure Planning
At all stages from project approval and licencing onwards, the Mine Closure Plan
should demonstrate that ecologically sustainable approaches can be followed.
Mine closure plans shall be site-specific. “Off the shelf” or generic proposals will
not be permitted.
Closure planning should take account of detailed materials characterization, data
on local environmental conditions and climatic conditions.
Consultation should take place between the mine manager and local communities.
3. Public availability of documents
The applicant shall ensure that all Mine Closure Plans are made public in the Local
Community and the Primary Host Community and shall use a variety of medium
which may include periodic radio broadcasts, publication at local town halls,
community halls and/or public notice boards, adjourning meetings with local
communities and/or dissemination amongst local civil society groups, as
appropriate.
4. Level of Detail required in a Mine Closure Plan
The level of detail provided with each category of project will vary according to the
complexity of the mineral deposit and the expected longevity of the mining
operations. The level of detail required in a Mine Closure Plan for small scale
mining operations will be significantly less than is required for large scale mines.
Table 1 below provides an indication of the information required.
Anticipated Post-mining Identification and Level of Status of Mine
Life of Mine land use Management of Key information Closure Plan
Environmental Issues
Long term in Provisional All high risk Indicative Provisional
excess of 25 targets components
years established identified
Medium term Clear proposals Full risk Well informed Full Plan
(10-25 years) set out assessment presented
provided
Short term up Full definition Full risk Full and Plan and
to 10 years of future uses assessment accurate details detailed
required provided proposals
presented
Small scale Full definition Full risk Full and Plan and
mining of future assessment accurate details detailed
operations uses required provided proposals
presented
Existing Assessed on Assessed on Assessed on Assessed on
operations case-by-case case-by-case case-by-case case-by-case
basis basis basis basis
132 133
5. Details required in a Mine Closure Plan
A Mine Closure Plan must be accompanied by professionally surveyed site plans,
aerial photographs and three dimensional drawings and diagrams.
The suggested content of a MCP is detailed below:
CONTENT
Cover Page:
(1) Title of project
(2) Document title
(3) Document ID number and version number
(4) Date of submission
(5) Environmental Licence number (or application number)
(6) Mineral Rights Licence number (or application number)
(7) Company name
(8) Full contact details
Table of Contents
Section 1 Scope and Purpose of the Mine Closure Plan
Section 2 Project Summary
Covering: land ownership, location of the operations, overview of
the mining operations, comprehensive site plan
Section 3 Identification of closure obligations and commitments
Section 4 Collection and analysis of closure data
Covering environmental data, other closure data and an analysis of
data
Section 5 Results of Stakeholder consultation
Section 6 Post-mining land use and closure objectives
Section 7 Presentation of final land forms in map and graphic (3-D) formats
Section 8 Identification and Management of closure issues
For example:
- Hazardous materials
- Hazardous and unsafe facilities
- Contaminated sites
- Acid and metallic-ferrous drainage
- Radioactivity
- Fibrous materials (asbestos)
- Non-target metals and residues in mine wastes
- Management of mine pit lakes
- Adverse impacts on surface and ground water quality
- Dispersive materials
- Design and maintenance of permanent drainage systems
- Dust emissions
- Rehabilitation of flora and fauna
- Visual amenity
- Heritage issues
Section 9 Completion Criteria, Performance indicators and targets
Section 10 Financial provisions
To cover:
- Earthmoving and landscape forming operations
- Management of hazardous or unstable materials
134 135
- Management of surface water drainage post closure
- Research and trials
- Decommissioning and removal of infrastructure
- Remediation of contaminated areas
- Progressive and final restoration
- Post-closure maintenance and monitoring
- Continuing stakeholder consultations
- Closure project management (administration, specialist consultancy,
legal fees)
- Provision for unexpected closures
- Provision for potential delays and extreme events.
Section 11 Closure Implementation
- Management structure and staffing
- Work plan and programme
- Sources of materials for remedial works
- Pilot processes
Section 12 Closure Monitoring and maintenance
Section 13 Management of date and permanent mine records depository
6. Risk Assessment
In the interests of reducing the risks of failure in achieving full rehabilitation of
worked out mines, the applicant shall carry out a risk assessment and include the
findings in the Mine Closure Plan. The purpose of the risk assessment is to:
- Ensure early identification of potential risks;
- Develop acceptable and realistic criteria to measure performance;
136 137
- Ensure orderly, timely and cost-effective closure outcomes;
- Reduce uncertainty in terms of the scale of closure costs; and
- Ensure application of continual improvements in remedial technology,
the enhancement of the final design and management of drainage, erosion and
seepage controls.
7. Minimum requirements for a Mine Closure Plan
A Mine Closure Plan will be judged incomplete if the answer to any of the following
questions is NO;-
(1) Has the closure plan been prepared specifically for this site?
(2) Is stakeholder consultation fully documented in the plan?
(3) Does the plan clearly indicate how stakeholders’ concerns have been
taken into account?
(4) Has a full environmental and social assessment been undertaken of the
issues involved in closing and rehabilitating the mine?
5) Are workable management measures identified and formally proposed
as part of the mine closure plan for dealing with the issues highlighted in
(4) above,
(6) Is there evidence that experience from other similar sites in Sierra Leone,
or other countries has been taken into account with the lessons learnt
being applied to the mine closure plan?
(7) Does the mine closure plan contain firm proposals for further research
and field trials to support closure proposals?
(8) Is the scope for progressive restoration or rehabilitation fully examined
in the mine closure plan?
(9) If scope exists for progressive restoration or rehabilitation are the
necessary technical and financial provisions made in the plan?
(10) Does the mine closure plan contain a section setting out measures for
dealing with closure and the possibility of temporary closure on a care
and maintenance basis?
138 139
8. Changes to approved Mining Proposals
Any substantial change to an approved mining operations and a mine plan is likely
to result in increases in environmental and social impact. This in turn will necessitate
review of the mine closure plan.
9. Unexpected and Temporary Closure
Mining operations can run into unexpected issues, like the influx of water into the
mine area, or change in economic circumstances that necessitate temporary closure
of the mining operations. If temporary closure becomes necessary this will trigger
requirements for adoption of a Care and Maintenance Plan as set out in the
Seventeenth Schedule of these Regulations. In the case of a temporary closure the
mineral right holder is required carry out all environmental obligations without
interruptions.
10. Existing Mine Operations
Under the Regulations and this Schedule the mine closure plans for all existing
mining operations will need to be reviewed every 2 years
TENTH SCHEDULE - ENVIRONMENTAL MANAGEMENT PLAN
STANDARDS (REGULATION 16(1)(B))
1. Preparation of an Environmental Management Plan
A mineral right holder which is obliged to prepare an EIA shall prepare an
Environmental Management Plan in accordance with Section 110(2)(d) of the Mines
and Minerals Act, 2009.
The Environmental Management Plan must incorporate all of the recommendations
and commitments to environmental protection in terms of avoidance, minimisation
and compensation that are contained in the Environmental Impact Assessment,
together with any additional conditions that are attached to the Environment Licence.
The Environmental Management Plan must include a programme of environmental
works, including timescale, targets and indicative costs.
2. Objectives of the Environmental Management Plan
An environmental management plan sets out the measures and steps that will be
taken by the holder of an environmental licence to avoid, minimise, mitigate or
compensate for adverse environmental effects arising from the mining operation
that are identified in the environmental impact assessment studies and report.
The level of detail will vary according to the stage of mining operation that is being
covered in the environmental license (i.e. exploration, detailed feasibility study or
full scale mining) and the scale of operations (small scale or large scale mining
operations).
An EMP will describe critical environmental values and/or sensitive sites that are
to be protected during the life, closure and post-closure stages of the operations,
in addition to those environmental features that are likely to be directly influenced
or affected.
Specific commitments must be entered into in the plan based on the site assessments
and international best practice in environmental care and proven research. Provisions
for monitoring must be included that are technical and financially achievable and
these shall cover environmental protection objectives, standards, measurable
indicators and control strategies.
Applicants for an environmental licence are strongly advised to consult the Agency
while preparing environmental protection commitments and responses to the
findings of the EIA.
3. Recommended contents of an Environmental Management Plan
Environmental Management Plan for an Environmental Licence for Exploration
CONTENTS
Section 1 Mining project status
Section 2 Description of mining activities
Section 3 Description of environmental values and potential impacts
Section 4 Management measures for each of the following environmental
values, as applicable
140 141
- Air : micro-climate, dust, odours, point source contaminants
- Water: natural watercourses, stream sediments, water quality,
groundwater, dams and containments, sewage effluent quality and
control,
- Noise and vibration
- Wastes: liquids and solids
- Land, landforms, rehabilitation criteria, landform design, gradients relating
to end-uses
- Dams containing hazardous waste
- Infrastructure: roads, power lines, generators
- Vegetation: flora
- Biodiversity: fauna
- Heritage and cultural conservation features
ELEVENTH SCHEDULE - SOCIAL MANAGEMENT PLAN STANDARDS
(REGULATION 16 (C))
1. Status of a social management plan
A social management plan is prepared from the material contained in a social
impact assessment (SIA) environmental and social impact assessment (ESIA) and
contains the measures to prevent, mitigate or compensate for negative social
impacts resulting from mining activities as well as measures to enhance and maximise
development opportunities.
The social management plan sets out the steps and measures that will be taken by
the mineral right holder to deliver all of the social and local economic obligations
that stem from these Regulations in relation to the construction, implementation,
operation and closure of mining activities and operations.
Social obligations covered in the social management plan are separate and distinct
from any wider commitments arising pursuant to negotiations with the host
community in relation to a Community Development Agreement or community
development plan or resulting from a Company’s corporate and social responsibility
policies.
2. Preparing a Social Management Plan
All Category A project applicants are required to prepare a social management
plan. Where it is deemed appropriate, an authorised officer of the Agency or the
Director of Mines may also direct that a Social Management Plan be prepared for a
Category B project.
In accordance with these Regulations, a social management plan must be revised
annually throughout the construction, implementation, operations and closure
stages of a mineral operation. The annually updated SMP shall be submitted to the
Agency within one month of the date of its adoption.
3. Objectives of a social management plan
A social management plan sets out the measures and steps that will be taken by the
holder of an environmental licence to avoid, minimises, mitigate or compensate for
adverse social effects arising from the mining operation that are identified in the
social impact assessment studies and report (or the environmental and social impact
assessment study and report in the case of a Category C Project).
The level of detail will vary according to the stage of mining operation that is being
covered in the environmental license (i.e. exploration, detailed feasibility study or
full scale mining) and the scale of operations (small scale or large scale).
A SMP will describe critical social values and/or sensitive sites that are to be
protected during the life, closure and post-closure stages of the mining operations
in addition to those social and local economic features that are likely to be directly
influenced or affected.
Specific and tailored commitments must be entered into in the plan based on site
assessments, international best practice in social care and proven research. All
monitoring provisions must be technically and financially achievable and must
cover social protection objectives, standards, measurable indicators and control
strategies.
142 143
Applicants for an environmental licence are strongly advised to consult the Agency
while preparing their social protection commitments and responses to the findings
of the SIA or ESIA.
4. Contents of a social management plan
The social management plan will contain, as a minimum, the following criteria:
CONTENTS
Section 1 Mining project status
Section 2 Description of mining activities
Section 3 Description of social and local economic values and any sensitive
sites and potential impacts
Section 4 Management measures for each social and local economic value.
In addition, the social management plan shall include sections detailing the
following:-
(a) references and links to a public consultation and participation
plan;
(b) a grievance or conflict management plan;
(c) timescales and estimated costs for the work; and
(d) provisions for monitoring and evaluating the results, and where
necessary, taking extra measures.
TWELFTH SCHEDULE - COMMUNITY DEVELOPMENT AGREEMENT
AND PLAN STANDARDS (REGULATION 16 (c) (iii))
1. Community development agreement
The holder of a small scale or large scale mining license is required to have and
implement a community development agreement with the host community in
accordance with Section 139(1) of the Mines and Minerals Act 2009.
2. Community development plan
The Community development agreement shall be based on the contents of a
community development plan which in turn sets out how the holder of an
environment licence will implement the findings and recommendations of a social
impact assessment (SIA) or environmental and social impact assessment (ESIA).
The Community Development Plan (CDP) will include;
(1) a participatory framework;
(2) a statement on the company’s policy, procedures and institutional
arrangements necessary to implement sustainable development
opportunities in the Host Community in the social impact assessment or
environmental and social impact assessment and in the social management
plan.
(3) a local employment and procurement strategy that commits the applicant;-
(a) to a policy of utilizing local employment wherever practical during
all stages of mine development; and
(b) to purchasing local materials and products wherever practical.
(4) a gender strategy outlining actions for improving the condition of women
and children within the Host Community who are likely to be affected by
the planned operations.
(5) a community development programme which shall include at least the
following:
(a) objectives,
(b) milestones;
(c) implementation timetable;
(d) schedule of anticipated expenditures;
(e) metrics by which to measure progress;
144 145
(f) periodic reporting including actual expenditures;
(g) how the plan works in coordination with government plans,
services, infrastructure and activities provided to or affecting
the community;
(h) how the provision of any service provided by the mining right
holder to the community will be terminated or transferred to the
community, government or other entity;
(i) how and when the plan will be periodically updated;
(j) how the plan and amendments to the plan will be ratified by the
community; and
(k) such other content as may be mutually agreed by the community
and the mining right holder;
Pursuant of Section 140(1) (c) (iii) of the Mines and Minerals Act 2009,
the Community Development Plan shall also serve to prepare the community for
mine closure with the Mine Closure Plan (MCP) also containing relevant consultation
and participation methodologies to meet that end.
3. Form of the Community Development Agreement
The community development agreement shall be structured around the following
contents list.
CONTENTS LIST
1. Objectives
2. Mining right holder’s obligation to assist in development of communities
3. Capacity to negotiate
4. Recommended content of community development agreement
5. Community development agreements should complement other
agreements and development plans
6. Recommended minimum expenditure
7. Transparency through reporting
8. CDAs and annual reports available to the public
9. Transfer
10. Pre-existing mining rights
4. Objectives of the Standards
The objectives of these standards are:
(1) to enhance the sustainable social, cultural and economic well-being of
communities impacted by mining operations;
(2) to define when community development agreements may be useful and
to provide a suggested framework for such agreements;
(3) to promote accountability and transparency in mining related community
development.
5. Obligations of the Mining Rights Holder
In accordance with Section 138 of the Mines and Minerals Act a mining right
holder is required to assist in the development of communities affected by its
operations to promote sustainable development, enhance the general welfare and
the quality of life of the inhabitants, and recognize and respect the rights, customs,
traditions and religion of local communities.
6. Conduct of negotiations
Where a qualified community lacks the capacity to effectively negotiate a community
development agreement, the mining right holder is obliged to assist to build that
capacity including the provision of such funds to the community for capacitybuilding and preparation as are reasonable in the circumstances.
7. Content of the Community Development Agreement
A mining right holder is required to negotiate a ratified community development
agreement with each host community affected by the planned mining development,
and each such agreement shall include as a minimum the following provisions:
146 147
(1) the person, persons, board, committee, foundation, trust, forum, body or
other entity which shall manage the agreement;
(2) the person or body that represents the partner community for the
purposes of the agreement;
(3) the means by which a registry of persons comprising the community will
be developed, maintained and updated;
(4) the means by which members of a partner community will participate in
the community’s agreement related decision-making processes;
(5) the means by which the interests of women, youth and sub-communities
of the partner community will be represented in the community’s
agreement related decision-making processes and implementation;
(6) the goals and objectives of the community development agreement;
(7) a community development programme (see Section 2v. above)
(8) the roles and obligations of the holder of the mining right to the partner
community, which may or may not be part of the development programme
plan, including but not necessarily limited to:
(a) undertakings with respect to the social and economic
contributions that the project will make to the sustainability of
the community;
(b) assistance in creating self-sustaining, income-generating
activities, such as but not limited to, production of goods and
services needed by the mine and the community;
(c) consultation with the community in the planning of mine closure
and post-closure measures that seeks to prepare the community
for the eventual closure of the mining operations;
(9) the roles and obligations of the partner community to the holder of the
mining right;
(10) the roles and obligations of the District Council, if it is a party to the
community development agreement or otherwise so chooses to be
obligated;
(11) the means by which the community development agreement shall be
reviewed by the holder of the mining right and partner community every
five (5) calendar years, and the commitment to be bound by the current
agreement in the event that any modifications to the agreement sought
by one party cannot be mutually agreed with the other party;
(12) the consultative and monitoring frameworks between the holder of the
mining right and the partner community, and the means by which the
community may participate in the planning, implementation, management,
measurement (including indicators) and monitoring of activities carried
out under the agreement;
(13) the language(s) to be used in the preparation of reports, plans, and other
written matters required under the agreement;
(14) the means by which any funds made available under the agreement are to
be disbursed, for what purposes they may be disbursed, what accounts
must be kept and by whom, and reporting and auditing requirements;
(15) the mechanisms whereby the partner community, and sub-communities
and members of the partner community may lodge a grievance with the
mining right holder;
(16) the mechanisms whereby the mining right holder may lodge a grievance
with the partner community;
(17) the process by which the agreement may be modified;
(18) a statement to the effect that both the holder of the mining right and
partner community agree that any dispute regarding the agreement shall
in the first instance be resolved by consultation between the holder and
the partner community representative(s);
(19) the dispute resolution mechanism to be used when consultation between
the holder and the partner community representative(s) fails;
(20) severability of articles;
(21) the applicable law, which shall be the law of Sierra Leone;
(22) reasons and procedure for declaring force majeure;
(23) duration of the agreement;
148 149
(24) suspension / termination of the agreement;
(25) assignment of the agreement or any right or obligation there under;
(26) transfer of all community development agreement rights and obligations
to any party to whom the mining right holder transfers its mining right;
(27) how notifications to respective parties shall be done;
(28) in order to prevent any overlap of resources and wastage of funds, a
provision requiring the mining right holder to co-ordinate with the
relevant local or central planning authorities which are responsible for
providing schools, medical centres, hospitals and other social
infrastructure to local communities;
(29) location where the agreement may be accessed by members of the
community; and
(30) the agreement signatories, which may for the partner community be the
representatives of the community, representatives of sub-communities
comprising the community, community members or any combination
thereof, non-governmental organizations, and others as the need requires.
8. Other Issues to be considered
In addition to the subject matter listed in (7) above, it is recommended that a
community development agreement take into account the unique circumstances of
the mining right holder and partner community, and the issues to be addressed in
the agreement and development program plan might address all or some or none of
the following issues:-
(1) role of local and other levels of government;
(2) educational scholarship, apprenticeship, technical training and
employment opportunities for the people of the community;
(3) employment quota or percentage allocation for sub-communities;
(4) financial or other forms of contributory support for infrastructural
development and maintenance such as education, health or other
community services, roads, water and power (in consultation with relevant
government authorities);
(5) assistance with the creation, development and support to small-scale
and micro enterprises;
(6) special programs which benefit women;
(7) special programs which benefit youth;
(8) special programs which benefit sub-communities within the partner
community;
(9) agricultural product marketing;
(10 ) protection of natural resources;
(11) support for cultural heritage and sports;
(12) treatment of cultural and sacred sites;
(13) treatment of ecological systems, including restoration and enhancement,
for traditional activities such as hunting and gathering;
(14) language training to further employment prospects;
(15) how cultural values will be respected;
(16) cross-cultural training requirements;
(17) malaria, AIDs and drug dependency prevention and intervention;
(18) land access;
(19) the assumption of specified obligations of the mining right holder by the
partner community, sub-communities and/or government authorities on
an evolving basis and/or upon termination of the agreement;
(20) methods and procedures of environment and socio-economic
management, and local governance enhancement;
(21) coordination with local and national government development plans
affecting the community;
(22) requirements with regard to third parties such as the mining right holder’s
contractors and suppliers;
(23) the involvement of non-governmental organizations; and
150 151
(24) other matters as may be agreed.
9. Goals and Objectives of the Community Development Plan
It is recommended that goals, objectives, obligations and activities specified in a
community development agreement aim to achieve sustained community
development which-
(1) lasts from generation to generation;
(2) is based on the actual needs of the community;
(3) is maintainable within available income;
(4) is well planned, monitored and evaluated;
(5) has long term benefits;
(6) prepares the community for closure of the mine;
(7) compliments but does not replace government-led development and
services;
(8) is in accord and compliments local and regional government development
plans; and
(9) recognizes and incorporates traditional knowledge.
10. The Role of the Local Authority
A mineral right holder and partner community shall consider what role the District
Council should have in regard to a community development agreement, whether
that role should be described in such agreement, and whether it would be
appropriate for the District Council to be a party to such agreement.
11. Provisions to be excluded from Community Development Agreements
A community development agreement shall not address any of the following
matters:-
(1) the provision of any passenger car, small truck, or four by-four vehicle to
any individual or single family unit of the partner community or to the
partner community, other than a specialized purpose vehicle such as an
ambulance, fire engine, water truck, or bus; or
(2) the provision of any monetary amount, service, good, or facility for the
sole benefit of an individual or single family unit.
12. Other Matters
(1) It is recommended that a community development agreement be in English
but where a substantial proportion of the community members are not
fluent in English the mining right holder party to such agreement should
consider making available to representatives of the partner community
translated copies in the local language or dialect.
(2) It is recommended that a mining right holder that enters into a community
development agreement with a partner community take into
consideration;-
(a) any community development agreements it has with other partner
communities so that such agreements complement one another
to achieve synergistic development across the communities.
(b) any existing community development agreements entered into
by that partner community with other holders of mining rights so
that its community development agreement compliments such
existing agreements, and whether the mining right holder might
become a party to any such existing agreements.
(c) any governmental community, local or regional development
plans or schemes so that the agreement is in harmony with and
compliments such plans or schemes.
(3) It is recommended that the holder of a mining right who has entered into
one or more community development agreements expend no less than
one tenth of one percent (0.1%) of the gross revenue amount earned
pursuant to that right from mineral sales in the previous calendar year to
implement all its agreement(s) or otherwise promote community
development.
152 153
(4) Where a mining right holder makes expenditures pursuant to a community
development agreement, it is recommended that such expenditures be
done in a transparent, predictable and sustained manner over the life of
the mine.
(5) The value of community development related work might include (whether
incurred directly by the mining right holder or indirectly through payments
by the mining right holder to a contractor, community trust, community
foundation or other legal entity):
(a) work or funds irrevocably committed to fulfil any obligation of
the mining right holder specified in a community development
agreement;
(b) salaries and benefits of any person responsible for managing
the implementation of one or more community development
agreements where such responsibilities comprise over fifty
percent(50%) of that person’s time;
(c) social baseline studies (the gathering and compilation of baseline
data that describes the state of the ecological, social and
economic environment and characteristics of the populations
living in the area);
(d) social impact and opportunities assessment work (assessment
of the potential ecological, social and economic impacts of the
project upon communities and measures to offset potential
negative impacts and maximize positive impacts);
(e) competencies assessment (measuring and recording the skills in
a community);
(f) participatory planning (the preparation of development program
plans where community members participate in the planning
effort);
(g) community and mining operation mapping (maps depicting what
the community perceives as its community space, where mining
operations will take place and when, where access is open,
restricted, or closed);
(h) institutional analysis processes (processes for identifying and
discussing what institutions are present in and around a
community);
(i) problem census taking (processes by which community members
articulate the problems they consider need addressing in their
community);
(j) implementation of District Council regional and community
development plans;
(k) training programs for members of a partner community;
(l) consultation processes between the mining right holder and a
partner community or members of a partner community and or
local government which are related to the creation or
implementation of a community development agreement;
(m) community development agreement monitoring;
(n) conflict management activities (the implementation of a grievance
process, other than Court actions, as stipulated in a community
development agreement); and
(o) such other expenditures as may be appropriate in the
circumstances.
(6) It is recommended that the holder of a mining right provide annually to
the Mining Cadastre Office, Minerals Advisory Board for every
community development agreement to which it is a party -
(a) a Community Development Agreement Annual Report no later
than January 31st, describing objectives, activities, milestones
and results for January through December during the prior
calendar year, and
(b) a Community Development Annual Expenditure Report not later
than February 15th detailing its community development
expenditures and total expenditure for January through December
during the prior calendar year.
(7) All community development agreements, community development
agreement reports and community development annual expenditure
reports (including all required attachments) submitted by past and present
holders of a mining right in furtherance of these standards shall be open
to free inspection by members of the public at the Mining Cadastre
Office during normal Government office hours.
154 155
(8) It is recommended that a community development agreement, community
development agreement reports and community development annual
expenditure reports (including all required attachments) submitted by
the holder of a mining right in furtherance of these standards also be
open to free inspection by any member of the partner community at the
office of the mining right holder located closest to that community during
normal office hours.
(9) It is recommended that when a mining right is transferred to another
party, the transferee should assume all rights and obligations of the
transferor under any community development agreement relating to the
mining right.
(10) The holder of a mining right which came into force prior to the publication
date of these guidelines should strive to have community development
agreements with all partner communities within two years from the
publication date of these Regulations.
THIRTEENTH SCHEDULE - CONSENT FOR THE USE OF LAND FOR
MINING PURPOSES (REGULATION 17(1))
1. The nature of consent
Before the initiation of any mining activity regulated under the Mines and Minerals
Act 2009 and these Regulations, the applicant for a mining right must obtain consent
to use the surface land on licence area for exploration or mining purposes. Consent
must be obtained from the Chiefdom Mining Allocation Committee or its rightful
occupiers or owners, and must be supported by documentary evidence.
2. Conditions for granting an Environmental Licence
Before granting an environmental licence for exploration, small scale mining, large
scale mining or any other mineral activities authorized under these Regulations,
the Agency will require proof that a legally binding agreement is in place to cover
use of land for mining purpose and that any other permits or permissions under
other legislation have been secured by the applicant.
Exceptionally, the Board of the Agency may grant an environmental licence for
complex projects involving a multiplicity of surface right ownerships if evidence is
presented to show that negotiations are at an advanced stage and there are no
substantive areas of disagreement between all the parties. The issue of a licence
under conditions where agreements remain to be concluded will be entirely at the
discretion of the Board of the Agency with no grounds for appeal in the event that
a licence is withheld.
3. Standard form on the status of consent for the use of land for mining
purposes
Registration Details
Name ofApplicant ……………………………........……………………………………
Document Identity /registration no.……………………............................……………
Registration with the Agency …………………………………………………………..
Legal representative…………………………………………………………………….
Address……………………...…………………………………………………………..
Telephone number………………………………………………………………………
E-mail address……………………………………………………………………………..
Details of the Land owner(s)
Provide the name, address and contact details for each independent land owner
Details of the Chiefdom Mining Allocation Committee
Mining District …………………………………………………..…………….……..
Name ofChiefdom……………………………………………………………..………
Name of Representative
Address ………………………………………………………………………….……..
Telephone number ……………………………………………………………………
Email……………………………………………………………………………..……..
156 157
Details of the Land owner(s)
Provide the name, address and contact details for each independent land owner
Name……………………………...……………………………………………………..
Address …………………………………………..……………………………………..
Telephone number …………………………….………………………………………
Email ………………………………………………....…………………………………..
Status of negotiations for consent to use land for exploration purposes
Answer each question by ticking the relevant box Yes No
A full legal agreement has been signed between the
applicant for the environmental licence and mineral
rights and the land owner(s) identified above, for the
use of land covered by this application for mining
exploration purposes.
A draft legal agreement has been exchanged between
rights and the land owner(s) identified above, for the
use of land covered by this application for mining
exploration purposes. The draft agreement covers
all heads of agreement and there is no dispute between
any of the parties which would prevent full agreement
being reached.
A full legal agreement has been entered into between
rights and the land owner(s) identified above,
covering the terms of compensation for any disturbance to
the land owners’ rights during the mining operations.
Attempts to reach a voluntary agreement between the
and the land owner(s) identified above, for the use of
land covered by this application for mining exploration
purposes have been unsuccessful and an application
has been made to the Minister under the Mines and
Minerals Act, 2009
Status of negotiations for consent to use land for small scale mining
Answer each question by ticking the relevant box Yes No
A full legal agreement has been signed between
the applicant for the environmental licence and
mineral rights and the land owner(s) identified above,
for the use of land covered by this application for small
scale mining operations.
A draft legal agreement has been exchanged between
rights and the land owner(s) identified above, for the use
of land covered by this application for small scale mining
operations. The draft agreement covers all heads of
agreement and there is no dispute between any of the
parties which would prevent full agreement being reached.
A full legal agreement has been entered into between the
and the land owner(s) identified above, covering the terms
of compensation for any disturbance to the land owners’
rights during the mining operations.
Attempts to reach a voluntary agreement between the
and the land owner(s) identified above, for the use of
land covered by this application for mining exploration
purposes have been unsuccessful and an application
has been made to the Minister under the Mines and
Minerals Act, 2009
158 159
Status of negotiations for consent to use land for large scale mining
Answer each question by ticking the relevant box Yes No
A full legal agreement has been signed between
the applicant for the environmental licence and
mineral rights and the land owner(s) identified
above, for the use of land covered by this application
for large scale mining operations.
A draft legal agreement has been exchanged between
rights and the land owner(s) identified above, for the use
of land covered by this application for large scale mining
operations. The draft agreement covers all heads of
agreement and there is no dispute between any of the
parties which would prevent full agreement being reached.
A full legal agreement has been entered into between the
and the land owner(s) identified above, covering the terms
of compensation for any disturbance to the land owners’
rights during the mining operations.
Attempts to reach a voluntary agreement between the
and the land owner(s) identified above, for the use of
land covered by this application for large scale mining have
been unsuccessful and an application has been made to the
Minister under the Mines and Minerals Act, 2009 for the
land covered by this application to be compulsorily
purchased, subject to the provisions for compensation
contained in the above act.
FOURTEENTH SCHEDULE - CONFIRMATION OF LOCAL COMMUNITY
PARTICIPATION IN SUSTAINABLE DEVELOPMENT (REGULATION 18(c))
1. Basic requirements
The applicant for an Environmental Licence is obliged under the principles and
obligations set out in Regulation 3 to;-
(1) engage the local community at the earliest opportunity;
(2) ensure that the programme of participation:
(i) identifies all relevant issues that could have harmful effects on
the local community; and
(ii) guides the identification of development priorities, joint planning,
implementation, management and monitoring of sustainable
development projects.
2. Form confirming participation of the local community
Applicants’ Details
Name ofApplicant ………………………………………………………...........………
Identity document/registration…………………………………………………...……
Registration with the Agency ………………………………………………………..
Legal representative……………………………………………………………........….
Address……………………………………………………………………………………..
Telephone number…………………………………………………………........………
E-mail address……………………………………………………………..........………..
160 161
Local Community Details (A separate entry should be made for each local
community involved)
Name ofCommunity: ……………………………………………………………………
Location (Name of District): ………………………………………......………………
Official representative of the Community: …………………………...........…………
Chiefdom(s) within the local community area: ………………………………………..
Details of any Community Liaison Committee(s) (CLC) Established
Name of CLC: …………………………………….................................................……..
Name of CLC Representative: ………………….....................………………………..
Contact Details for CLC Representative: ……………………………………...……..
Date of formation and incorporation of the CLC: ……………………………………..
Number of meetings of the CLC: ………………………………………………………..
Dates when meetings of the CLC were held ………………………………….....……
Record of Public Consultation
(Provide a list of all public consultation meetings and describe the location,
venue, purpose, type of meeting, number of participants, outcomes and
recommendations with copies of minutes)
1.
2.
3.
Note: Add rows as necessary
Record of Publications, Advertisements and Media Events (Video, Film, TV and
Radio Broadcasts)
1.
2.
3.
Note: Add rows as necessary
FIFTEENTH SCHEDULE -APPLICATION FORM FOR ENVIRONMENTAL
LICENCE (REGULATIONS 17 (3), 18 (3) and 19)
This application dated ………....………..has been:
(1) Hand-delivered to the Registration Office of the Environment Protection
Agency at 3rd Floor West Wing Youyi Building, Freetown.
(2) Submitted to the Registration Office of the Environment Protection
Agency at 3rd Floor West Wing Youyi Building, Freetown by Courier
service.
(3) Hand-delivered to a regional office of the Environment Protection
Agency.
(strike out whichever of the above categories do not apply).
Signed and dated by individual authorised to submit the application
……………………………………………
Counter signature and date by receiving officer……………………………….
Official Date Stamp of the Environment Protection Agency:
The period specified for determination of the environmental licence by the
Environment Protection Agency will run from the day following receipt of the
completed application if delivered at the headquarters in Freetown, or 5 working
days after registration at a regional office to allow for the transfer of relevant
documents.
162 163
An application shall not be complete until it comprises the requisite number of all
of the documents specified in Regulation 20.
Confirmation by the Environment Protection Agency’s reception staff of the type
and number of documents handed over does not in itself constitute a formal
acceptance of a completed application. This will be provided by letter signed by a
duly authorised officer once the applications details have been checked and verified.
Registration Details
Name ofApplicant ………...........................……………………………………………
Identity document/registration……………...............…………………………………
Registration with the Agency………………..........……………………………………..
Legal representative …………………………………………………………………….
Address………………………………………………………………………………………..
Telephone number………………………………………………………………………
E-mail address………............................................................................…………………
I confirm, as the authorised officer or agent for the applicant, that the following
details are correct and that the requisite number of documents (identified by a tick
in the appropriate boxes) has been submitted with this application form:
Signature of applicant’s agent or Authorised Officer:…………………..……………
Date:……………………….
History of Application
Project Screening Application submitted: Date :
Environment Protection Agency Decision on Project Category issued: Date
Environment Protection Agency Application Reference Number:
Project Category:
Application documents submitted To be EPA
with this form completed confirmation
by applicant
No. of No. of
Copies Copies
CATEGORY D PROJECT
Environmental Code of Practice
CATEGORY C PROJECT
Environmental and Social Impact Assessment
Mine Closure Plan
CATEGORY B PROJECT
Mine Closure Plan
Environmental Management Plan
Social Management Plan
Draft Community Development Agreement
(where required)
CATEGORYA PROJECT
Mine Closure Plan
Environmental Management Plan
Social Management Plan
Draft Community Development Agreement
(supported by a community development plan)
Resettlement Management Plan
164 165
SIXTEENTH SCHEDULE - FINANCIAL ASSURANCE MECHANISM
STANDARDS (REGULATIONS 28 (1) AND 29 (1) AND (2))
The financial assurance mechanism utilised for a specific project shall be comply
with the standards defined in this Schedule.
1. Early scoping of financial feasibility
The mining right holder must ensure that the costs associated with mine closure
and post closure activities, including post closure care, are included in business
feasibility analyses during the planning and design stages. Minimum considerations
should include the availability of all necessary funds by appropriate financial
instruments to cover the cost of closure at any stage in the mine life, including
provision for early or temporary closure. Funds must be set aside early on in the
project development to finance the social and economic aspects of mine closure.
2. Level of financial assurance
The required level of financial surety will be established by the Agency taking due
regard of the following end goals and rehabilitation standards and in all cases, to
enable full reclamation and cover all costs relating to the physical closure of the
site. Reclamation shall comprise but is not limited to (i) removal of all plant,
equipment, and, where it is no longer needed, infrastructure; (ii) removal of all
hazardous materials; (iii) sealing of adits; (iv) stabilization of all surfaces; (v) revegetation of all surfaces; (vi) restoration of surface and groundwater flows; (vii)
prevention of long-term pollution and (viii) the adverse effects of closure of social
assets in the local community, the closure of which can have severe economic
consequences.
In addition, reclamation includes amounts to cover activities provided for in future
care, maintenance, reconstruction and emergency response action plans.
The social elements that should be taken in to consideration include redundancy
payments, retraining schemes, support for dependent (spin-off) businesses, utilities
(electricity, water, communications etc.), social facilities (health, education, justice
etc.), infrastructure (roads, airstrips, ports, wharves etc.), food security and the
financial system.
In most cases, the amount that is required for the financial surety is based on the
specific itemized costs of all components included in the closure or rehabilitation
plan. The amount of financial surety shall be established by the applicant and
reviewed by the Agency.
3. Timing
The financial surety must be in place before work is allowed to start on site. It does
not have to be lodged until after the mining title is granted.
4. Types of funding
Acceptable funding instruments include a cash accrual system, bank guarantee or
letter of credit, offshore trust fund, insurance policy or surety bond.The two
acceptable cash accrual systems are fully funded escrow accounts (including
government managed arrangements) or sinking funds.
5. Accessibility of financial assurance
Financial assurances should be readily accessible, dedicated, and only released
with the specific consent of the Agency. Forms of financial assurance should be
payable to the Agency under its control or in a trust for their benefit and earmarked
for reclamation and closure.
6. Funding provider
An acceptable form of financial guarantee must be provided by a reputable financial
institution.
Where a guarantee is provided, in order to assure that guarantors have the financial
capacity to assume an operator’s risk of not performing its reclamation obligations,
the Agency must carefully screen a guarantors’ financial health before accepting
any form of assurance. Any risk-sharing pools should also be operated on an
actuarially sound basis. The Agency should require periodic certification of these
criteria by independent third parties.
7. Review of financial assurance
The level of financial surety may be reviewed and revised at any time by the
Environment Protection Agency.
166 167
8. Release of financial assurance
Following the successful total rehabilitation of the site and consultation with the
relevant local community, all of the financial surety is returned to the proponent.
The financial surety funds are not available to the mining permit holder for ongoing
rehabilitation.
The funds may be partially released where progressive rehabilitation has been
successful and at the time of periodic review. Staged reductions in the level of
financial surety can help to promote progressive rehabilitation and good practices.
Before any money is returned to the mining permit holder, the Agency should
establish that the program has been successful and no further work is required on
the site. A commonly used method of evaluating the release of the financial surety
is the success of the re-vegetation program. It is also possible to use other testing
criteria, such as the surface stability, water quality, or a combination of all three.
Depending on the post closure monitoring requirements, as specified in the mine
closure plan, the mining title may not be relinquished for a significant period of
time during which period, the proponent is responsible for any additional
rehabilitation work for residual environmental impacts and social impacts and long
term care and maintenance issues. Financial surety is required to support these
obligations, either through the original security or by provision of a specific fund.
It is released when the Agency has issued a closure certificate, but a portion may
be retained to cover latent or residual environmental impacts and social impacts.
9. Public Involvement
Since the public runs the risk of bearing the environmental and social costs not
covered by an inadequate or prematurely released security, they must be accorded
an essential role in advising authorities on the setting and releasing of such security.
Therefore, the Environment Protection Agency must give the public notice and an
opportunity to comment both before the setting of the financial level of the security
and before any decision on whether to release the same.
10. No Substitute
Any type of financial assurance should not be regarded as a surrogate for a mining
permit holder’s legal liability for cleanup or for the Agency applying the strictest
scrutiny and standards to proposed mining plans and operations. Rather, a financial
assurance is only intended to provide the public with a buffer against having to
shoulder costs for which the mining permit holder is liable.
11. Primary Agency
The Agency shall act as primary government agency in all mine closure matters.
This assures the business community that one agency will take the lead on its
problems and that it will not have to answer to many differing opinions on how the
success of operation, reclamation, and closure will be measured.
SEVENTEENTH SCHEDULE - CARE AND MAINTENANCE PROGRAMME
STANDARDS (REGULATION 31 (2))
1. Context
A mine may need to be closed either permanently due to unexpected circumstances,
including but not limited to, a marked change in the geological conditions, or
temporarily due to changes in mineral demand and/or market prices which make it
uneconomic to continue production in the prevailing economic climate.
Whenever a mine needs to be closed it is a fundamental requirement of the
Regulations that one of the following two actions is taken:
(1) the mining operations are brought to an end in accordance with the
Mine Closure Plan; or
(2) the mining operations are put into temporary suspension and a care
and maintenance plan is enacted to ensure that there are no adverse
environmental or social impacts arising during the period in which
the mine is dormant.
2. Preparation of the care and maintenance plan
A care and maintenance plan must be prepared as part of the environmental
management plan and social management plan so that the necessary actions can
be taken as soon as the need for temporary closure arises. It is acknowledged that
some elements of the care and maintenance plan will cover protection of plant and
equipment and that these elements are covered in the Operational Regulations for
the Minerals Sector, 2011. This guidance relates only to environmental and social
aspects of the care and maintenance plan.
168 169
3. Activating a care and maintenance plan
Any decision taken by the environmental licence holder to place a mine under care
and maintenance must be immediately notified to the Agency. Concurrently with
this notification the environmental licence holder must undertake an environmental
and social audit of the site and its surrounding area.
4. Audit requirements
The environmental audit will establish the precise condition of all open excavations,
waste tips, minerals dumps, watercourses, chemical storage tanks, treatment plants,
tailings dams and lagoons and assess their vulnerability to erosion, subsidence,
corrosion, rupture or any other form of failure in the absence of on-going mining
activities.
The social audit will establish the likely impact of closure for employees and their
dependents and for the local and host community as well as the consequences this
will have for obligations and commitments entered into by the environmental licence
holder in relation to any Community Development Agreement.
5. Care and maintenance inspections
Under the terms of the care and maintenance plan the environmental licence holder
will be obliged to continue carrying out inspection and monitoring activities in
accordance with a schedule agreed with the Agency. Where the Agency concludes
that additional surveys and inspections or remote monitoring is required this shall
be provided by the environmental licence holder at its own expense.
6. Emergency response action plan
It shall be a condition of acceptance of the care and maintenance plan by the
Agency that the environmental licence holder formulates an emergency response
action plan along with all relevant implementation tools.
7. Financial assurance and compensation
The costs of the care and maintenance plan and the emergency response action
plan shall be covered by the financial assurance scheme.
Under the terms of the care and maintenance plan, the environmental licence holder
shall make compensatory payments to the local community and host community to
cover the loss of any payments over the period of temporary closure which would
fall due in accordance with any Community Development Agreement.
SCHEDULE EIGHTEENTH - ROSTER OF INDEPENDENT AUDITORS
(REGULATION 59 (3) )
1. Creation of a roster of independent environmental auditors
The Agency will establish and maintain a roster of environmental and social
consultants with the necessary credentials, skills and experience to undertake the
full range of environmental and social audits in the mining and minerals sector.
The roster will comprise between four and six international consultancy companies
that can be called upon to provide the full range of auditing services over a three
year period of service on the roster.
Competitive tendering for the auditor positions will be undertaken at three yearly
intervals.
2. Selection of auditors for the roster
Advertisements will be placed in international mining journals, the newsletter for
the International Association of Impact Assessors (IAIA) and other international
press outlets inviting environmental and social consultants with capabilities in
impact assessment, management, and auditing in the field of mining and mineral
development to apply for a three year post on the auditing roster.
Terms of Reference will be provided which set out the requirements for the
submission of parallel technical and financial bids. All proposals will be evaluated
in terms of the technical competence of the auditing consultancies and their staff.
Applications from those consultancy companies scoring a minimum of 70 points
under the technical assessment will go forward to a second stage review based on
its financial proposal.
The selection of environmental auditors for the roster will be based on an evaluation
of the best performing applicants on technical merit combined with lowest financial
cost using the following ratio:
170 171
Technical assessment score x 70% + financial assessment score x 30%
Technical assessment will be based on submissions outlining:
Organisation, skills and capacity Score
1. Company structure and organisation 10
2. Number and specialisms of senior managers
and project managers 10
3. A list of in-house staff (names, disciplines,
qualifications, seniority, years of work experience), 10
4. A list of recruited external consultants (names,
disciplines, qualifications, seniority, years of work
experience). 10
5. Access to laboratories and description of in-house
monitoring and auditing equipment 10
6. A method statement for handling different types of
audit with examples of related work 20
7. A detailed description of similar auditing work and
experience in the mining and related development
sectors, including client references, timescale and costs. 30
Total Score 100
Financial Proposals will provide the following information:
Information Required Score
1. Scale of charges in bands relating to skills and experience 60
Project Director
Principal Auditors
Senior Auditors
Middle Rank Auditors
Support Staff
2. Fully costed financial proposals for undertaking 3 levels
of audit according to the detailed brief provided in the
Terms of Reference for appointment. 40
Total Score 100
MADE this 15th day of May, 2013.
HADDIJATOU JALLOW (MRS.),
EXECUTIVE CHAIRPERSON
Environment Protection Agency
PRINTED AND PUBLISHED BY THE GOVERNMENT PRINTING DEPARTMENT, SIERRA LEONE.