Law library · Sierra Leone · Acts of Parliament
62 of the Environmental Protection Act, 2008, the Board hereby makes
Status not yet checkedEnvironmentAct of Parliament · 86 provisions
Sign in to download the PDFAsk Tima about this lawCases on this law
Contents
- Preamble
- Section 1 — These Regulations shall apply to-
- Section 2 — In these Regulations unless the context otherwise requires
- Section 3
- Regulation 4
- Section 5 — Every holder of a mineral right shall -
- Section 6
- Section 7
- Section 8
- Section 9
- Section 10
- Section 11
- Section 12
- Section 13 — (1) Any applicant submitting a Project Screening
- Section 14
- Section 15
- Section 16
- Section 17
- Section 18
- Section 19
- Section 20
- Section 21
- Section 22
- Section 23
- Section 25 — (1) The holder of a mineral right shall prepare an Annual
- Section 26 — (1) The holder of a mineral right shall prepare an Annual
- Section 27
- Section 28
- Section 29
- Section 30
- Section 31
- Section 32
- Section 33
- Section 34
- Section 35
- Section 36
- Section 37 — (1) Notwithstanding subsection (5) of section 54 of the
- Section 38
- Section 39 — (1) Every holder of mineral right shall present an updated
- Section 40
- Section 41
- Section 42
- Section 43 — (1) Effluent and emission quality standards -
- Section 44
- Section 45
- Section 46
- Section 47
- Section 48
- Section 49
- Section 50
- Section 51 — (1) The relevant environmental assessment instrument
- Section 52
- Section 53
- Section 54
- Section 56
- Section 57 — (1) Pursuant to Section 37 of the Act, the Executive
- Section 58
- Section 59
- Section 60
- Section 61
- Section 62
- Section 63
- Section 64
- Section 65 — (1) The holder of a mineral right shall -
- Section 66
- Section 67
- Section 68
- Section 69
- Section 70
- Section 71
- Section 72
- Section 73
- Section 74
- Section 75
- Section 76
- Section 77
- Section 78
- Section 79
- Section 80
- Section 81 — (1) The Director of Mines in consultation with the
- Section 82
- Section 83
- Section 84
- Section 85
- Section 86
- Section 87
THE ENVIRONMENT PROTECTION
(MINES AND MINERALS) REGULATIONS, 2013
In exercise of the powers conferred upon the Board by section
62 of the Environmental Protection Act, 2008, the Board hereby makes
the following Regulations -
PART I - PRELIMINARY
(a) any person who wishes to undertake or cause
to be undertaken any extractive industries
project, including mining, quarrying,
extraction of sand, gravel, salt and peat set
out in the paragraph (f) of the First Schedule
of the Act, for which an application for an
Environmental Impact Assessment Licence
is required under section 24;
(b) body corporates and individuals applying for
or issued minerals rights under the Mines
and Minerals Act 2009.
:
Short title.
Application.
Interpretation.
“Act” means the Environment Protection Agency Act,
2008;
“adverse environmental impact” means a negative
effect on, or change in, the environmental quality
resulting from mining activities;
“Agency” means the Environment Protection Agency
of Sierra Leone established by section 2 of the
Environment Protection Agency Act, 2008;
“applicant” means an individual or organization that
has submitted, or is in the process of submitting an
application to the Board for an environmental licence
or other form of approval in relation to these
Regulations;
“area of influence” means an area surrounding the
project site that, through an environmental impact
assessment, is determined to be affected by the
project;
“Audit Report” means a report from an environmental
auditing firm summarizing the results and findings
of an environmental audit to a mining operation;
“Authorised Officer” means an employee of the
Agency duly authorised by the Board or Executive
Chairman for a specified purpose;
“Board” means the Board of Directors of the
Environment Protection Agency;
“Community Development Agreement” (or CDA)
means any Community Development Agreement
entered into pursuant to Section 140 of the Mines
and Minerals Act, 2009 designed to promote
sustainable development and to enhance the general
welfare and quality of life of the inhabitants;
“community entitlement” means any legitimate claim
from a member of the Primary Host Community to
the holder of mining permit for the implementation
of any activities relating to the community
development issues;
“Community Liaison Committee” means the committee
mutually established by the applicant or holder of a
mineral right and local communities to serve as the
main consultation body between the applicant, the
holder of a mineral right and local communities for
social issues;
“compensatory measures” means measures to be taken
when mitigation is not feasible, cost effective or
sufficient;
“corporate social responsibility” means a form of
corporate self-regulation and management whereby
companies take responsibility for the environmental
and social impact of their operations;
“Director of Mines” means the authorised officer
assigned responsibilities under the Mines and
Minerals Act, 2009;
“displaced persons” mean persons living in the project
area that must move to another location and who-
(a) have legal rights to the land they occupy;
(b) have a claim to land that is recognized or
recognizable by law; or
(c) are experiencing loss of asset, access to
income whether of temporary or permanent
nature due to the land acquisition process
regardless of whether they are physically
displaced or relocated or not;
2 3
“environmental best practice” means the application
of internationally recognised standards and
practices for the protection of the environment in
mining activities;
“Environmental Impact Assessment” (or EIA) consists
of an environmental impact assessment study and
an environmental impact assessment report that
focuses on environmental issues and describes the
impacts that the proposed project is predicted to
have on bio-physical conditions if implemented,
together with proposals for avoiding, mitigation or
compensation for adverse effects, and includes an
ESIA(as the context may require);
“Environmental Management Plan” (or EMP) means
an Environmental Management Plan produced as a
result of an environmental impact assessment which
shall describe how the applicant will implement all
recommendations, commitments and obligations
designed to avoid, minimise, ameliorate or
compensate for adverse environmental impacts
identified in the relevant Environmental Impact
Assessment;
“environment” means land, air, water and all plants,
animals and human beings living therein and the
inter-relationship which exists among these or any
of them;
“environmental assessment” means, the systematic
identification, prediction and evaluation of a proposal
including the mitigation and management of those
effects; the process extends from the initial concept
of the proposal through implementation to
completion and where appropriate decommissioning.
“environmental audit” means the process of examining,
documenting and verifying that a mining operation
is complying with environmental laws and
regulations, as well as with the EIA goals and
requirements;
“environmental impact” means the direct or indirect
consequences of reconnaissance, exploration, smallscale and large scale operations on the environment
including water, air, climate, land, land use and
natural resources, geology, topography, soils,
vegetation, wildlife that affects life in general,
wellbeing , health, personal safety, cultural heritage
or legitimate means of livelihood and any cumulative
effects on the above;
“environmental licence” means an Environmental
Impact Assessment Licence issued under the Act;
“Environmental and Social Impact Assessment” (or
ESIA) means a simplified or limited Environmental
Impact Assessment which incorporates sections on
social impacts and is appropriate for projects that
require more limited environmental and social
analysis than an Environmental Impact Assessment
as their negative effects on the environment and the
community can be eliminated or minimized by simple
and easy to implement measures;
“Environmental and Social Management Plan” (or
ESMP) means environmental and social management
plan provided as part of an application for artisanal
mining;
“environmental offence” means an act that has directly
or indirectly harmed the environment or an
infringement or violation of an obligation imposed
by the Act or these Regulations;
4 5
“Executive Chairman” means the Executive Chairman
of the Board of Directors of the Agency;
“exploration” means operations carried out to search
for minerals and mineral deposits and includes
operations to test the mineral bearing qualities of
the land, define the extent and determine the
economic value of mineral deposits;
“force majeure” means floods, landslides, riots and
civil insurrection which prevent the holder of a
mining right from performing its obligations under a
contract as long as such event or circumstance was
neither foreseen nor foreseeable at the
commencement of the holder of the mining right’s
mining activities and are out of its control and the
holder of a mining right has taken reasonable care
and diligence to mitigate such event or circumstance;
“frivolous or vexatious claims” means any claim as
determined by a court of competent jurisdiction,
which has been instituted maliciously or repetitively
and without probable cause or has been lodged by a
party or its attorney which are knowingly aware that
such claim lacks merit, proper due diligence, legal
argument and/or a sound factual justification;
“Government” means the Government of Sierra Leone;
“grievance mechanism” means a mechanism –
(a) to receive and facilitate resolution of
concerns and grievances about the holder of
a mineral right’s environmental and social
performance,
(b) for workers (and their organizations, where
they exist) to raise reasonable workplace
concerns, and
(c) to receive and address specific concerns
about compensation and relocation that are
raised by displaced persons or members of
local communities and host communities;
“holder of a mining permit” means a person or body
corporate who has been granted a permit for dredging
or developing radioactive mineral activities issued
under the Mines and Minerals Act, 2009;
“holder of a mineral right” means a person or body
corporate who has been granted a licence under the
Mines and Minerals Act 2009;
“inspection” means the process of entering land or
buildings in order to examine, investigate, test,
compare, analyse and duplicate documents, materials
and data for the purpose of verifying compliance
with these regulations and gather evidence;
“large-scale mining” means the intentional mining of
minerals in mechanised operations exceeding twenty
metres in depth or involving the sinking of shafts,
drilling of adits or other various underground
opening exceeding twenty meters;
“life cycle of the project” means all the phases of mining
activity including reconnaissance, exploration,
development, exploitation, beneficiation, and
closure;
“local community” means any community of the local
population within the project’s general area of
influence who are likely to be affected by the project
and shall also include local populations who are
either directly or indirectly affected by the project;
6 7
“Mine Closure Plan” means a plan comprising
proposals for managing the progressive restoration
(where practicable) of worked-out mine areas and
the ultimate closure and restoration or rehabilitation
of the mine site upon cessation of mining operations;
“Minerals Advisory Board” means the Board
established by section 11 of the Mines and Minerals
“mineral rights” means a right to explore for or to mine
minerals by the hold of a valid reconnaissance
licence, exploration licence, artisanal mining licence,
small scale mining licence, or large scale mining
licence, issued under the Mines and Minerals Act,
2009;
“mining right holder obligation” means a commitment,
condition or undertaking to act, or an agreement to
omit from acting imposed upon the holder of a mining
permit pursuant to these Regulations, the Act or the
Mines and Minerals Act, 2009, which shall include
any community entitlement” which has been agreed
between the Primary Host Community and the holder
of a mining permit;
“mining activities” mean those activities undertaken
by a mineral right holder and in accordance with the
restrictions and obligations of the various licences
including but not be limited to the following –
(a) mining, quarrying, extraction of sand, gravel,
salt;
(b) the establishment and operation of industrial
plant used in mineral processing, power
plants, smelting plants, and refineries;
(c) construction of mineral export ports, maritime
facilities and associated mineral transportation system from mine site or in-land deposits;
and
(d) construction of mineral concentrate depots
or other facilities outside the licence area;
“monitoring” means the continuous or periodical
procedures implemented by the holder of a mineral
right, the Board, the Executive Chairman or
Authorized Officer to monitor, measure, sample,
record and analyse all environmental and social
aspects of mining activities including dynamic
mechanisms, such as inspections and audits, where
relevant, to verify compliance and progress toward
the desired outcomes adjusted according to
performance experience and feedback;
“primary host community” means community as
defined in subsection (2) of section 139 of the Mines
and Minerals Act, 2009;
“project area” means the area covered by the mining
right licence;
“reconnaissance licence” means a reconnaissance
licence granted by the Minister of Mines under
section 58 of the Mines and Minerals Act 2009, that
does not exceed ten thousand square kilometers;
“Resettlement Action Plan” (or RAP) means the
comprehensive plan as further defined in any law
relating to the resettlement of local communities;
“Resettlement Committee” means an intergovernmental committee established pursuant to any
law relating to the resettlement of local communities
designed to review, approve, monitor and evaluate
resettlement activities in Sierra Leone;
8 9
“Resettlement Management Plan” (or RMP) means the
framework broadly identifying the objectives,
principles, policies, procedures, organizational
arrangements and the timeframe and cost for dealing
with resettlement, as further described in any law
relating to the resettlement of local communities;
“Resettlement Policy Framework” means the broad
principles by which the applicant sets forth its
proposals for managing all stages of resettlement as
further described in any law relating to the
resettlement of local communities;
“screening” means the process carried out by the
Executive Chairman in consultation with the Board
by which a decision is taken on whether or not an
EIA is required, and what type of EIA is appropriate
for a particular project;
“scoping or scoping study” means the process of
identifying the content and extent of the
environmental information to be included in an
Environmental and Social Impact Statement;
“scoping report” means a report containing the
findings and recommendations of a scoping study;
“Strategic Environmental and Social Assessment” (or
SESA) means a strategic environmental and social
assessment for mining districts within which artisanal
mining is a major activity;
“small-scale mining” means the intentional mining of
minerals in mechanised operations not exceeding
twenty metres in depth or involving the sinking of
shafts, drilling of adits, or other various
underground openings;
“social assessment” means in respect to a mining
project, the process of undertaking a Social Impact
Assessment in accordance with the Act, the Mines
and Minerals Act, 2009 and these Regulations;
“Social Impact Assessment” (or SIA) means a social
impact assessment study and social impact
assessment report which describes the full range of
social, economic and health issues affecting local
communities, predicts significant adverse social
impacts and sets out proposals for avoiding,
mitigating or compensating for adverse effects;
“Social Management Plan” (or SMP) means a social
management plan which describes how the applicant
will implement all recommendations, commitments
and obligations to avoid, minimise, ameliorate or
compensate for adverse social impacts identified in
the relevant social assessment instrument;
“social impact” means the consequences of
exploration, small-scale, and large-scale operations
in the way people organize their economic system,
the way they live, work, relate to one another,
organize themselves, and the way they develop and
share values, attitudes, beliefs, institutions, and
perceptions of their surroundings, including other
people and the biophysical environment;
“stakeholder” means any persons or groups that are
directly or indirectly affected by a project as well as
those that may have interests in a project or the
ability to influence its outcome either positively or
negatively and the term “stakeholders” include
locally affected communities and individuals and
their formal and informal representatives,
government, politicians, religious leaders, civic
organisations, and other groups with special
interests, the academic community, employees, their
families and employee representatives, other
businesses, financiers, shareholders and joint
venture partners;
10 11
“sustainable development” means the pattern of use
of natural resources that meets the needs of the
present generation without compromising the ability
of future generations to meet their own needs.
PART II - PRINCIPLES AND ACCOUNTABILITY
(1) The principles outlined under sub-regulation (2) shallbe applied by-
(a) the Agency when dealing with matters related
to environmental and social management of
proposed or ongoing mining activities.
(b) any other authority whether administrative
or judicial, whenever its participation,
intervention or decision on matters relating
to the environmental and social impacts of
mining is required under applicable laws or
regulations.
(2) The principles referred to under sub-regulation (1)
are as follows -
(a) SUSTAINABILITY
Every mining operation shall be carried out
in a sustainable manner that is reasonably
practicable in order to minimize, mitigate or
eliminate negative environmental and social
adverse impacts including but not limited to
pollution resulting from such operation in
accordance with the Environment Protection
Agency Act, 2008, subsection (1) of section
132 and subparagraphs (xii) and (xiii) of
paragraph (b) of subsection (1) of section
133of the Mines and Minerals Act 2009.
(b) POLLUTER PAYS
(i) The cost of pollution avoidance, prevention,
control, remediation and compensation shall
be borne by the polluter in accordance with
the principles of international environmental
law
(ii) For the avoidance of doubt, this principle
shall be applicable to any kind of
environmental or social impact derived from
the development, construction, operation
and management of mining activities.
(c) PRECAUTIONARY COST-EFFECTIVE
MEASURES
(i) when a mining activity raises threats of
serious or irreversible harm to public health
or the environment, the lack of full scientific
certainty of a detrimental outcome shall not
be used as reason for postponing
precautionary cost-effective measures to
prevent damage to human health or
environmental degradation.
(ii) The burden of proof in relation to the
precautionary principle resides with the
holder of the mining rights.
(d) LEGAL RESPONSIBILITY FOR ENVIRON-
MENT
(i) The holder of a mineral right shall be
responsible for the environmental and social
impacts of their activities, as well as for
managing these impacts.
(ii) Every holder of a mineral right shall carry on
its operations in a manner that is reasonably
practicable-so as to prevent, minimize,
12 13
application of
principles
manage and mitigate any adverse
environmental impact including but not
limited to pollution resulting from such
operations and any adverse social impact in
accordance with the Act, and the Mines and
Minerals Act, 2009.
(iii) Every holder of a mineral right is legally
obliged to keep emissions and effluents
resulting from its operations under the
maximum level of pollutant concentration
permitted by these Regulations and they shall
manage and control residues, wastes, toxic
substances and other contaminants in order
to ensure that they will not cause adverse
effects on the environment and public health.
(e) PROTECTION OFAFFECTED COMMUNI-
TIES
Every holder of a mineral right shall protect
the surface rights of those within and in close
proximity to a mining area and shall-
(i) obtain consent from lawful landowners and
occupiers prior to entering lands and
commencing exploration or other mining
activities;
(ii) wherever possible, allow lawful landowners
and occupiers to graze livestock and
cultivate land;
(iii) pay fair compensation for land use and
disturbances; and
(iv) where necessary, provide a resettlement
option which is equivalent to or better than
their current living environment.
(f) OBLIGATION TO IMPLEMENT
ENVIRONMENT MANAGEMENT
INSTRUMENT
The holder of a mineral right shall comply
with and operate in accordance with the
environmental management instrument
approved by the Board.
(g) ACCESS TO INFORMATION
(i) Every local community shall have access to
information held by the Board and the
Minerals Advisory Board concerning the
environmental and social effects of proposed
or on-going mining activities.
(ii) The Board and the Minerals Advisory Board
shall inform communities of the existence and
content of communities’ rights to access
information relating to the social, environmental and economic impact of mining
activities.
(iii) Every holder of a mineral right shall make all
approved Environmental Impact Assessments, Social Impact Assessments,
Environmental Management Plans and Social
Management Plans available on its official
website free of charge.
(h) PUBLIC PARTICIPATION
(i) Every holder of a mineral right shall provide
an opportunity for local community and the
Primary Host Community to participate in
consultations relating to environmental and
social matters in accordance with paragraph
(a) of subsection (2) of sections 133 and
paragraph (f) of subsection (1) of sections
140 of the Mines and Minerals Act 2009.
14 15
(ii) Every mineral right holder, in complying with
shall be guided by the followingrules -
(a) all information provided shall be transparent
and honest;
(b) there shall be no discrimination on the
grounds of race, sex, ethnicity, culture,
socioeconomic status or political views;
(c) cultural diversity, including values, customs,
and the traditions of individuals and
communities shall be respected;
(d) information shall be communicated in the
language most commonly used by the
affected parties, in a clear and simple to
understand structure;
(e) local needs and circumstances are taken into
consideration;
(f) all sectors and interests of society shall be
well represented, including women, the elderly
and youth;
(g) there shall be no discrimination based on any
of the grounds contained in international
human rights legislation; and
(h) joint-problem solving shall be promoted
through continuous dialogue and local
traditions.
(iii) The Executive Chairman or Authorised
Officer shall facilitate and encourage public
awareness and participation by ensuring that
environmental licence and mineral right
holders make information on the environmental and social impact of proposed and ongoing mining activities widely available.
(iv) The Executive Chairman or Authorised
Officer shall where practicable, make all
approved Environmental Impact Assessments, Social Impact Assessments, Environmental Management Plans and Social
Management Plans available on the
Agency’s website.
(i) PUBLIC CONSULTATION
(i) Every mining licence holder shall hold
consultations with key stakeholders from the
earliest stages of a mining project throughout
mining operations and mine closure.
(ii) Public consultation and participation in
reconnaissance, exploration, small- scale, and
large-scale mining shall be guided by the
following rules -
(a) local communities shall have the right to
receive and access public information in a
timely and transparent manner;
(b) local communities shall have the right to
participate responsibly in decision-making
processes pertaining to mining projects that
affect their interests, provided that the claims
are not frivolous or vexatious;
(c) local communities shall have the right to
receive copies of the social management plan
at no cost and the applicant shall raise
awareness within the community about the
contents of the plan;
16 17
(d) local communities shall have the right to
monitor the implementation of provisions
contained in the social management plan,
provided that such monitoring shall in no way
impede the applicant from fulfilling its
obligations under these Regulations; and
(e) local communities shall have the right to
denounce any matter concerning the violation
of their civil and human rights.
(iii) Recognising the differences between mineral
rights, applicants for an environmental
licence shall engage in consultation with all
relevant stakeholders as early as possible and,
at a minimum, prior to the submission of an
application for an environmental licence to
the Board.
(j) JOINT AND SEVERAL LIABILITY
Where two or more persons constitute the
holder of a mineral right, those persons shall
be jointly and severally liable for the payment
of all costs, damages and or indemnities
arising from any adverse environmental
impact and social impact (which shall include
any human rights violations) resulting from
their mining activities on the environment,
the local community and the Primary Host
Community.
(k) INDEPENDENT LIABILITY
(i) The termination, expiration, suspension,
cancellation, revocation, forfeiture, attachment, pledge, relinquishment, surrender,
reduction of area, ceasing of operations, or
any other matter affecting the status of the
mining right licence or permit shall not
prejudice any environmental or social
obligations or liabilities incurred by the
holder.
(ii) The rule established in paragraph (i) shall
also apply in the event of any variation,
suspension, amendment or any other matter
adversely affecting the status of the
environmental licence.
(l) APPOINTMENT OF CORPORATE
ENVIRONMENTAL OFFICER
(i) The holder of, or applicant for an exploration,
small scale or large scale mining licence shall
appoint a corporate environmental officer,
and may also appoint a deputy corporate
environmental officer, who shall be in charge
of the environmental control of the mineral
right holder´s mining operations, and shall
be the primary contact person for the Board,
the Executive Chairman, Authorised Officer
and third parties for environmental and social
purposes.
(ii) In the absence of an individual with
appropriate skills, the holder of or applicant
for, an artisanal mining licence shall assume
the status and responsibilities of the
corporate environmental officer.
(iii) The corporate environmental officer shall
have a comprehensive knowledge of the
characteristics of the mineral right holder´s
mining operations, and shall collect compile
and manage and keep, in good order for
inspection purposes, up-to-date information
on the mineral right holder’s environmental
and social performance.
(iv) The holder of an exploration, small scale
licence or large scale mining licence shall,
within thirty days of the coming into force of
these Regulations, inform the Executive
Chairman or Authorised Officer of the
18 19
appointment of the corporate environmental
officer and if one is appointed, a deputy
corporate environmental officer.
(v) The corporate environmental officer shall
inform the Executive Chairman or Authorised
Officer of any major incidents that has or is
likely to give rise to adverse environmental
impact or social impact.
(m) BEST ENVIRONMENTAL PRACTICES
The holder of a mineral right shall conduct
his mining activities according to
environmental best practice and according
to the philosophy of corporate social
responsibility.
PART III-ADMINISTRATION
4. (1) No person shall undertake or cause to be undertaken
any mining project; including reconnaissance, exploration, artisanal
mining, small scale mining, large scale mining, dredging and
radioactive substances mining, specified in the First Schedule of the
Act, and for which an Environmental Impact Assessment Licence is
required, unless that person obtains an Environment Impact
Assessment licence issued by the Agency in accordance with
subsection (1) of section 24 of the Act.
(2) Applications for Environmental Impact Assessment
Licence and enquires on other administrative issues and procedures
related to environmental protection in mining activities shall be
submitted to the Executive Chairman or Authorised Officer in
accordance with Part X
(a) carry on his operations in a manner that is
reasonably practicable in order to minimize,
manage and mitigate any environmental
impact including but not limited to pollution
resulting from such operations and in
accordance with the Act and the Mines and
Minerals Act 2009;
(b) ensure that his actions and operations in
relation to the Local Community and the
Primary Host Community comply with all laws
in force in Sierra Leone including international
human rights instruments to which Sierra
Leone is a party;
(c) conduct consultations and negotiations with
displaced persons and affected communities
in good faith and in an open and transparent
manner in accordance with paragraph (f) of
subsection (1) of section 140 of the Mines
and Minerals Act 2009;
(d) facilitate the formation of a Community
Liaison Committee and, based on an agreed
budget, fund its basic operations, including
transport costs for members to attend
meetings and subsistence allowances for
those travelling to meetings; and
(e) prepare and implement a Resettlement
Management Plan in instances of known or
potential involuntary displacement caused
by mining activities in accordance with
section 38 of the Mines and Minerals Act
2009.
(1) For the purpose of establishing a consultative andmonitoring framework between the licence holder and the primary
hostcommunity, as required under paragraph (f) of subsection (1) of
section 140 of the Mines and Minerals Act 2009, the holder of a smallscale or large-scale mining licence shall establish a Community Liaison
Committee during the period in which he is undertaking a Social
Impact Assessment in order to engage with communities,
stakeholders, individuals, potentially displaced persons and where
relevant, local communities who hold property or access rights to
lands located within the area targeted for acquisition by the mineral
right holder.
20 21
Impact
Assessment
Licence
required for
mining
projects.
Responsibilities
of mineral
right holder.
Commu nity
Liaison
Committee.
(2) A Community Liaison Committee referred to in subregulation (1) shall represent the views of its constituents on all
social matters, with the mining right holder, regarding compensation
and report back to its constituents on all matters, decisions and key
dates addressed and identified.
(3) Members of the Community Liaison Committee shall
comprise a Chairman, not being a local or Paramount Chief, nominated
by the community and approved by the mineral right holder and the
following other members at least two of whom shall be female -
(a) one representative of a local and Paramount
Chief;
(b) four representatives of the local community;
(c) one representative of Civil Society appointed
from local interest groups, including
teachers, workers’ unions representatives,
health practitioners, women’s enterprises
(e.g. farming, beekeeping cooperatives),
proposed by the community; and
(d) one representative of the District Council or
Local Government.
PART IV – RESTRICTING OR PROHIBITING RECONNAISSANCE
(1) Pursuant to paragraph (j) of section 57 of the Minesand Minerals Act 2009, an applicant for a reconnaissance licence
who confirms in writing that his operations will have no adverse
effects on the environment, local communities, any monument or
relic in the proposed reconnaissance area, shall be exempted from
applying for an environmental licence.
(2) A confirmation in writing under sub-regulation (1)
shall be made under oath and in accordance with the Statutory
Declaration Act, 1835.
(1) An applicant for a reconnaissance licence undersection 57 of the Mines and Minerals Act 2009 -
(a) who intends to erect camps, temporary
buildings, take timber or water from a lake or
watercourse, or construct weirs, dams or other
impoundments, or intend to use intrusive
methods to collect geological information; or
(b) whose operations are likely to cause
disturbances to local communities through
noise, vibration physical obstruction or other
adverse social impacts,
shall apply to the Board for an environmental licence in accordance
with Regulation 19.
(2) Where a holder of a reconnaissance licence has
not applied for an environmental licence and has been found to have
adversely affected the environment or any monument or relic or caused
disturbance to local communities, he shall -
(a) promptly report such incident to the
Board; and
(b) pay such fine or other penalty as may be
imposed by the Board, including refusal of
environmental licence for applications for
renewal of a reconnaissance licence and for
approval of proposed amendments to the
programme of reconnaissance under section
63 and section 67 of the Mines and Minerals
Act, 2009 respectively.
(1) The Executive Chairman shall, after consultation withthe Board, coordinate the preparation of a strategic environmental
and social assessment for mining districts within which artisanal
mining is a major activity.
22 23
Non-invasive
reconnaissance
Invasive
reconnaissance
Strategic
and social
assessment of
artisanal
mining areas
(2) A strategic environmental and social assessment shall
consist of -
(a) a baseline description of the environmental,
social and local economic conditions in the
district;
(b) an analysis of the existing artisanal mining
practices within the area, including the
number and ownership of existing licences,
the physical extent of workings, the number
of miners and dependants, the contribution
to the local economy from mining activities
and impacts of mining activities on other land
uses;
(c) a description of the nature and extent of
adverse and beneficial environmental and
social impacts, and an account of any
restoration and rehabilitation work
undertaken within the district;
(d) a statement of prospects for further mining
activities if extraction licences were to be
granted;
(e) a report on the opinions and attitudes of all
stakeholders, including local communities;
and
(f) recommendations on the management of
artisanal mining areas, including potential
restrictions on activities, the number of
artisanal mining licences to be granted at any
one time, and requirements for the treatment
of abandoned mining areas and rehabilitation
of all existing workings either progressively
or on cessation of mineral extraction.
(2) All Strategic Environmental and Social Assessments
shall be widely disseminated and submitted to the Minerals Advisory
Board and the Director of Mines.
(3) Strategic Environmental and Social Assessments
which relate to a specific area shall be submitted to the relevant
district authorities for consideration in preparing community
development agreements.
(1) Applications for an artisanal mining licence made inaccordance with paragraph (e) of sub-section (2) of section 85 of the
Mines and Minerals Act 2009, shall be accompanied by a statement
giving particulars of the likely effects of the proposed mining
operations on the environment and on the local population.
(2) The Director of Mines shall consider the relevant
Strategic Environmental and Social Assessment recommendations
and ESIS when determining whether to refuse or grant an artisanal
mining licence under section 86 of the Mines and Minerals Act, 2009.
(1) Any applicant who wishes to undertake any extractiveindustries project, including mining, quarrying, extraction of sand,
gravel, salt, peat, set out in paragraph (f) of the First Schedule of the
Act, shall submit a project screening application to the Executive
Chairman or Authorised Officer to request determination of the project
category for environmental and social assessment.
(2) Notwithstanding this Regulation and Regulation 20,
all mineral activities falling under paragraphs (e) and (f) of the First
Schedule of the Act shall be subject to this Regulation.
(3) For the avoidance of doubt, mineral extraction shall
include mechanical excavation, dredging, solution mining and the
recovery of radio-active materials.
(4) Project screening applications referred to in subregulation (1) shall contain information specified in subsection (1) of
section 133 of the Mines and Minerals Act 2009, including -
24 25
Application
for artisanal
mining
licence.
Project
screening
applications
(a) on the area of the intended project and
information on its current uses and physical,
biological and social environment; and
(b) on the nature of the project, the intended
work plan and the anticipated implications
on the environment and social conditions.
(5) Project screening applications referred to in sub-regulation
(1) shall be submitted in such form as specified in the Second
Schedule.
(6) Within fourteen days of the receipt of an application under
sub-regulation (1), the Executive Chairman or Authorised Officer shall
assign the applicant one of four categories (A, B, C or D) based on
the environmental and social impact screening criteria specified in
the Third Schedule.
(1) The project screening application shall be reviewedby theExecutive Chairman or Authorised Officer in order to-
(a) identify the nature and scale of the
environmental and social impact that the
proposed project is likely to produce;
(b) determine the category (A, B, C or D) to
which the project is to be assigned;
(c) establish the environmental and social
assessment instruments that correspond to
the project (Environmental Impact
Assessment (EIA), Social Impact Assessment
(SIA), Environmental and Social Impact
Assessment (ESIA), or Code of Practice) as
indicated in Chart A ; and
(d) establish the corresponding environmental
and social management instruments that
correspond to the project Mine Closure Plan
(MCP), Environmental Management Plan
(EMP), Social Management Plan (SMP),
Community Development Agreement (CDA),
Resettlement Management Plan (RMP) as
indicated under Chart A .
(2) In assessing the project screening application, the
Executive Chairman or Authorised Officer shall apply the criteria
specified in the Third Schedule .
(3), The Executive Chairman or Authorised Officer shall
complete the screening process and notify the applicant of its decision
within a period, not exceeding fourteen days, from the date of
submission of the application in accordance with subsection (1) of
section 25 of the Act.
keep a record of the screening decisions and supporting information,
which shall be included in the register established and maintained for
that purpose.
26 27
Project
categorisation
Chart A
PROJECT PROJECT ENVIRONMENTAL ENVIRONMENTAL
IMPACT CATEGORY AND SOCIAL AND SOCIAL
ASSESSMENT MANAGEMENT
INSTRUMENT INSTRUMENT
The project A EIA + SIA MCP
will produce EMP
significant SMP
adverse CDA
environmental RMP
and social impacts
that are likely to
result in the need
for resettlement
The project B EIA + SIA MCP
will produce EMP
significant SMP
adverse CDA(where required)
impacts with
moderate social
effects not
involving the
need for
resettlement
The project C ESIA Simplified
will have MCP
moderated Combined
environmental EMP/SMP
and/or social
impacts which
negative effects
can be eliminated
or minimized by
simple and easy
to implement
measures
The project D Code of Practice
does not
involve Disclosure +
significant
environmental Declaration
and/or social
impacts
Application may appeal to the Board for reconsideration of the
category determined by the Executive Chairman or Authorised Officer
on payment of an additional fee to cover the administrative expenses
of the appeal.
(2) Where an appeal is upheld by the Board and a lower
category is agreed the appeal fee shall be repaid to the applicant.
(3) The period for consideration of any appeal shall be
four weeks.
(4) The decision of the Board shall be final and binding.
(1) Applicants for category A and B projects shall submita scoping report to the Executive Chairman or Authorised Officer
specified in the Fourth Schedule.
(2) The Executive Chairman or designated officer in
consultation with the Board shall review the scoping report and advise
the applicant, within a period of 21 days from the date of submission,
of any modifications to the scope of the assessment or additional
information that may be required.
(3) Applicants for a Category C Project shall not be
required to submit a scoping report but may submit a draft of the
ESIA to the Executive Chairman or Authorised Officer with a request
for guidance on any additional subject matter that may be required to
be covered.
(1) The environmental and social assessment instrumentsindicated under Chart A of regulation 12 shall comprise the the
following-
(a) an Environmental Impact Assessment (EIA)
consisting of an EIA study and environmental
impact assessment report that focuses on
environmental issues and describes the
28 29
Appeal
against
Project
category.
scoping
report
Assessment
instruments
impacts that the proposed project is
predicted to have on bio-physical conditions
if implemented, together with proposals for
avoiding, mitigating or compensating for
adverse effects, in accordance with section
26 of the Act and subsection (2) of section
131 of the Mines and Minerals Act 2009 and
as further specified in the Fifth Schedule;
(b) a Social Impact Assessment (SIA) consisting
of a social impact assessment study and
social impact assessment report which
describes the full range of social, economic
and health issues affecting host communities,
predicts significant adverse social impacts
and sets out proposals for avoiding,
mitigating or compensating for adverse
effects, in accordance with clause (v) of
paragraph (b) of subsection (2) of section
112 and subparagraph (xii) of paragraph (b)
of subsection (1) of section 133 of the Mines
and Minerals Act 2009 and paragraphs (d)
and (e) of the Third Schedule of the Act and
as further specified in the Sixth Schedule;
(c) an Environmental and Social Impact
Assessment (ESIA) consisting of a report
containing a simplified or limited EIA which
incorporates sections on social impacts and
health impacts and is appropriate for projects
that require more limited environmental and
social analysis than an EIA as their negative
effects on the environment and the
community can be eliminated or minimized
by simple and easy to implement measures,
as specified in the Seventh Schedule;
(d) an Environmental Code of Practice, as
specified in Eighth Schedule which shall
apply to all projects where the Board is
satisfied, on the evidence presented by the
applicant, that the project will not have
significant environmental impacts.
(2) Based on the project categorisation referred to in
Regulation 12, the applicant shall use the corresponding
environmental and social management instrument in preparing an
environmental licence application.
The environmental and social assessment managementinstruments indicated under Chart A of regulation 12 shall comprise
the following -
(a) a Mine Closure Plan consisting of proposals
for managing the progressive restoration of
worked-out mine areas and the ultimate
closure and restoration or rehabilitation of
the mine site upon cessation of working as
specified in the Ninth Schedule and in
accordance with clause (iii) of paragraph (c)
of subsection (1) of section 140 of the Mines
and Minerals Act 2009,.
(b) an Environmental Management Plan
describing how the applicant will implement
all recommendations, commitments and
obligations designed to avoid, minimise,
ameliorate or compensate for adverse
environmental impacts identified in the
relevant environmental assessment instrument, as specified in the Tenth Schedule and
in accordance with paragraph (a) of
subsection (1) of section 115 and clause (xv)
of paragraph (b) of subsection (1) of
section 133 of the Mines and Minerals Act,
2009;
30 31
Management
Instruments
(c) a Social Management Plan as specified in the
eleventh schedule which shall-
(i) describe how the applicant will
implement all recommendations,
commitments and obligations to avoid,
minimise, ameliorate or compensate for
adverse social impacts identified in the
relevant social assessment instrument;
(ii) include a community consultation and
participation plan and a grievance
management plan pursuant to Sections
138, 139 and paragraph (f) of subsection
(1) of section 140 of the Mines and
Minerals Act 2009;
(iii) include a community development
agreement as required under Section
140 of the Mines and Minerals Act 2009
and the applicant for an environmental
licence shall include appropriate details
of the planned agreement as specified
in the Twelfth Schedule; and
(iv) include a Resettlement Management
Plan for the purposes of subsection (3)
of section 38 of the Mines and Minerals
Act 2009,
(1) An applicant for an environmental licence shall inform,consult with and obtain the consent of landowners or rightful
occupiers to use the land for mining purposes in accordance with
section 32 and paragraphs (f) and (g) of subsection (1) of section 78
of the Mines and Minerals Act 2009 and as specified in the Thirteenth
Schedule.
(2) An environmental licence shall not be granted
to an applicant under the Act unless-
(a) there is evidence that the applicant engaged
landowners or rightful occupiers in open and
transparent negotiations and obtained their
consent to use land for mining purposes; and
(b) appropriate procedures within the social
assessment and management instruments to
engage the local community and the Primary
Host Community have been implemented.
(3) An applicant for an Environmental Licence shall
complete and submit the application form as specified in the Fifteenth
Schedule together with a written statement confirming the status of
any agreement between the applicant and landowners or rightful
occupiers of the land, including details relating to compensation
arrangements with landowners or rightful occupiers.
carry out prior consultations with the Minerals Advisory Board in
order to ascertain the status and relevance of the applicants’
negotiations, to social and community issues that affect the granting
of an environmental licence pursuant to sections 35, 36 and 37of the
Mines and Minerals Act, 2009.
(5) Where an agreement is not reached relating to the
payment of compensation, the amount of compensation to be paid
shall be determined by the Director of Mines, acting on the advice of
the Minerals Advisory Board, in accordance with subsection (6) of
section 35 of the Mines and Minerals Act 2009.
(1) An applicant for an environmental licence shallengage the local community and the Primary Host Community at the
earliest opportunity in order to encourage community participation
and ownership of sustainable development interventions in
accordance with section 138 of the Mines and Minerals Act 2009 and
as specified in the Fourteenth Schedule.
32 33
Consent to
use land for
mining
purposes Sustainable
development
interventions.
(2) All sustainable development intervention under subregulation (1) shall be designed to-
(a) identify all relevant social issues that could
give rise to harmful or negative effects on
the local community and the Primary Host
Community; and
(b) guide the identification of d e v e l o p m e n t
priorities, joint planning, implementation,
management, and monitoring of sustainable
development projects.
(3) An applicant for an environmental licence shall submit
a completed application form as specified in the Fifteenth Schedule
confirming that all necessary steps have been taken to address the
issues listed in sub-regulations (1) and (2).
carry out prior consultations with the Minerals Advisory Board in
order to ascertain the progress in negotiating a Community
Development Agreement and the relevance of the applicant’s
programme to social and community issues that affect the granting
of an environmental licence.
An applicant for an environmental licence shall completeand submit to the Executive Chairman or Authorised Officer, the
application form specified in the Fifteenth Schedule and 3 copies
each, of documents submitted with the application specifying –
(a) the project category to which the application
applies; and
(b) where and when the relevant documents have
been deposited for public inspection.
(1) The Executive Chairman or Authorised Officer shallexamine the application and confirm in writing within 14 days whether
or not the required type and number of documents have been
submitted relative to the project category.
(2) In the case of Category A and B Projects, the Board
shall review the EIA and SIA and accompanying management
instruments and approve or reject them within a period of twelve
weeks from the date of submission, this period may be extended if the
Board requires clarifications from the applicant.
(3) In the case of Category C Projects, the Board shall
review the ESIA and approve it or reject it within a period of six weeks
from the date of submission.
(4) The Board shall only grant an environmental licence
in relation to projects in Category A and B where it is satisfied that
appropriate screening and review of the relevant application details
and environmental and social management instruments have been
conducted and that any significant adverse environmental impacts
and social impact can be mitigated or ameliorated sufficiently enough
to allow sustainable development of mining activities.
(5) For all applications for Category C Projects involving
more minor environmental and social issues, the Board shall determine
the environmental impact assessment licence by giving due weight
to both environmental and social considerations as set out in the
ESIA.
(1) Where a Category A Project application involves thepotential for resettlement, the Executive Chairman or Authorised
Officer shall refer the SIA and the SMP to the appropriate authority
responsible for resettlement for its consideration.
(2) The appropriate authority responsible for resettlement
shall review the SIA, the SMP and the RMP in accordance with the
criteria set out in any law relating to the resettlement of local
communities and make recommendations in accordance with the
procedures described therein.
(3) For Category A Projects involving potential
resettlement the Board shall consider the SIA in the light of comments
and recommendations provided by the appropriate authority
responsible for resettlement.
34 35
licence
application
Review of
applications.
Projects
involving
resettlement
(1) Where an EIA, SIA or ESIA is returned to the applicantby the Board on the basis of inadequacy, the Board shall state its
reasons and indicate the steps required by the applicant to rectify
the inadequacy within a period of 21 days as specified in paragraph
(b) of subsection (2) of section 28 of the Act.
(2) Subject to sub-regulation (1), the application for an
environmental licence shall be held in abeyance until the required
rectification of the inadequacy has been made and the relevant
environmental or social management instruments have been
resubmitted.
(3) In the event that the necessary rectification of the
inadequacy referred to in sub-regulation (1) are not addressed or the
relevant document is not resubmitted within 21 days, the application
for an environmental licence shall lapse.
(4) The Board may agree to extend the deadline outlined
in sub-regulations (1) to (3) at its discretion on the basis of a
reasonable case for an extension submitted by the applicant.
(1) After receipt of the application documents for anenvironmental licence, the Executive Chairman or Authorised Officer
shall widely disseminate and distribute the documents to local
communities in order to raise awareness of its contents and seeks
comments thereto.
(2) The Executive Chairman or Authorised Officer shall
disseminate notice to the public and the local community of all
Category A, B and C projects through a variety of information outlets
including radio broadcasts, posting details of the Category A, B or C
project in local community, facilitate meetings with local community
groups or civil society groups.
(3) Members of the public and the local community shall
be given fourteen days from the date of the last dissemination of
information to submit written comments to the Executive Chairman or
Authorised Officer.
compile a comprehensive list of all comments received from public
consultation including details of the comments and who provided
the comments.
(5) All documents submitted to the Executive Chairman
or Authorised Officer as part of an application for an environmental
licence shall be reviewed by officers with the relevant technical skills,
discipline and experience.
(6) The documents referred to in sub-regulation (1),
together with a report of the internal evaluation and list of public
comments prepared by an Executive Chairman or Authorised Officer
and endorsed by the Executive Chairman shall be submitted to the
Board at least five days prior to the Board meeting in which the issue
is to be addressed.
(7) The Board may, by simple majority decision, either-
(a) approve the documents and application and
request the Executive Chairman to grant an
environmental licence,
(b) conclude that there are inadequacies in the
assessments and return the application and
documents to the applicant with the option
of rectifying the inadequacies and
resubmitting them within 21 days.
(c) conclude that the scale of adverse environmental or social impacts is so great, and is
incapable of being avoided, mitigated or
compensated for, such that an environmental licence shall not be granted.
(8) The quorum of the Board for any decision to grant a
Category A or B environmental licence shall be two-thirds of appointed
members.
36 37
Inadequate
and social
assessments
Review of
licence
application
PART V – OBLIGATIONS OF AN ENVIRONMENTAL LICENCE
HOLDER
24 (1) The holder of an environmental licence shall prepare
an Environmental Management Plan and a Social Impact Management
Plan and shall -
(a) review the contents of such plans on each
anniversary of the commencement of works
(b) update the plans to accommodate any
changes that have occurred in the method of
mining, and area of operations, or other
activities that could affect environmental
protection and ultimate restoration or
rehabilitation of the affected areas .
(2) The holder of an environmental licence shall submit
an updated Environmental Management Plan and a Social
Management Plan to the Director of Mines and the Board within one
month of the anniversary of the commencement of works.
Environmental Report in accordance with Section 134 of the Mines
and Minerals Act 2009 and submit this report for monitoring purposes
simultaneously to the Director of Mines and the Board
(2) The authors of the Annual Environmental Report
prepared and submitted by the holder of the mineral right under
regulation (1) shall not subsequently be engaged in any form of
independent auditing relating to the same licence area
Social Report in accordance with Section 134 of the Mines and
Minerals Act 2009 and shall widely disseminate the report amongst
the local community and submit copies of the same to the Minerals
Advisory Board and the Board.
(2) The authors of the Annual Social Report prepared
and disseminated by the holder of the mineral right under regulation
(1) shall not subsequently be engaged in any form of independent
auditing relating to the same licence area.
An environmental licence holder shall include a scheduleof the holder of the mineral right’s internal sampling and inspection
programmes covering all areas of environmental and social monitoring
as an appendix to the Environmental Management Plan and the Social
Management Plan.
(1) For Category A and B projects, the holder of a mineralright shall establish itemised costs for the restoration plan including
all progressive restoration proposals and costs associated with the
Mine Closure Plan prior to commencement of work in the manner
specified in the Sixteenth Schedule relating to financial assurance.
(2) Based on the outline costs, to be agreed with the
Executive Chairman in consultation with the Board, the holder of a
mineral right shall, prior to commencement of work, provide financial
assurances to the full value of the restoration, rehabilitation and
remedial works contained within the Mine Closure Plan to the
satisfaction of the Board.
(3) Estimates of costs in sub-regulation (1) shall be
revised annually in the light of practical experience on the site and
the level of financial assurance shall be adjusted accordingly in
accordance with subsection (3) of section 136 of the Mines and
Minerals Act 2009.
(4) For Category C projects, the holder of a mineral right
shall provide the Executive Chairman or Authorised Officer with a
budget of costs relating to the mine closure.
(1) Acceptable forms of financial assurance include asurety bond, a trust fund with pay-in period, an insurance policy, a
cash deposit or annuities, or any combination of these in the manner
specified in the Sixteenth Schedule and in accordance with subsection
(4) of section 136 of the Mines and Minerals Act 2009,
38 39
Annual
Report
Annual Social
Report
and Social
Performance
Monitoring
Financial
assurance.
Forms of
Assurance
Updating
Enviromental
Management
Plan and
social Impact
Management
Plan
(2) The financial assurance mechanism to be used for
any specific project shall comply with the standards contained in the
Sixteenth Schedule.
Where the mineral right holder fails to present the financialassurance by the start-up date for the commencement of mining
activities as notified by the construction contractor, the environmental
licence shall be suspended in accordance with subparagraph (ii) of
subsection (1) of section 34 of the Act.
(1) Where the holder of a mineral right intends totemporarily suspend its mining activities, it shall present a care and
maintenance programme to the Agency for approval by the Board.
(2) The care and maintenance programme referred to in
sub-regulation (1), shall be prepared in the format specified in the
Seventeenth Schedule.
(3) The period of temporary suspension referred to in
sub-regulation (1), shall not be longer than two years and where
mining activities are suspended for more than two years the holder of
a mineral right shall enter into final closure and implement the closure
plan as approved by the Board.
(4) The holder of the mineral right shall ensure that the
financial assurance provided under Regulation 30 shall continue in
full force and effect during any temporary suspension of mining
activities.
PART V1 - CLOSURE OF MINING ACTIVITIES
(1) A mineral right holder shall bring mining activities toa close at the end of extraction and related activities, whether during
the period of or on termination of its mineral right, by ensuring that
the mine area is left in a condition free of any adverse physical,
chemical and biological effects, with no long term adverse
environmental risks.
(2) A mineral right holder shall leave the area of operations
in a condition that facilitates future sustainable land use and ensures
that rehabilitation does not become a burden to the community after
mining activities are over.
(3) A mineral right holder’s obligations and liabilities shall
continue until a closure certificate has been delivered in accordance
with Regulation 41, provided that a mineral right holder’s obligations
shall not be limited by the expiration of the mineral right nor with the
whole or partial suspension, cancellation, revocation, forfeiture,
attachment, pledges, relinquishment, surrenders, reduction of area,
ceasing of operations, or any other circumstances affecting the status
of the mining right licence or the environmental licence.
(1) For Category A and B projects, an applicant shallproduce a Mine Closure Plan which shall include all technical and
legal measures that need to be implemented by the holder of a mineral
right in order to rehabilitate the areas disturbed by its operations and
to eliminate actual or potential risks to the environment and to public
health and safety.
(2) For Category C projects , the applicant shall produce
a conceptual mine closure plan which shall be included in the ESIA.
(3) The mining areas shall be restored to their
preoperational ecological conditions whenever feasible, or otherwise,
to an environmental condition appropriate for sustainable alternative
uses acceptable to the Board.
(4) The conceptual closure plan shall include a budget of
costs in relation to the mine closure.
(5) A detailed Mine Closure Plan shall be submitted for
approval by the Board, together with the financial assurance, at least
six months before the proposed commencement of the project.
(6) Existing small-scale mining and large-scale mining
licence holders who do not currently have approved closure plans
shall submit a detailed Mine Closure Plan for approval of the Board
within six months after these Regulations enter into force.
40 41
Presentation
of financial
assurance
Temporary
Suspension of
activities
Mine closure
obligations.
Mine Closure
Plan
(7) The Mine Closure Plan shall be prepared in
accordance with the structure and guidance as specified in the Ninth
Schedule of these Regulations.
(8) Once approved by the Board, the Mine Closure
Plan shall be reviewed and updated every two years and whenever
changes in the project make it necessary and all updates shall be
submitted to the Board for approval.
(1) Every Mine Closure Plan shall be implemented in aprogressive manner during the life of the project and shall involve a
continuous series of activities starting from the initiation of the project.
(2) Rehabilitation of disturbed areas shall be carried out
on an on-going basis, before, during and after the final closure of
operations.
(3) Closure referred to in sub-regulation (2) comprises
the rehabilitation activities included in the Environmental
Management Plan and the Mine Closure Plan.
(1) If the holder of a mineral right defaults in theperformance of its closure obligations and such default is not caused
by an event of force majeure affecting the holder of the mineral right,
the Board shall levy a fine on the environmental licence holder and
require him to comply with such obligations within such period of
time as the Board may consider appropriate.
(2) Where the infringed closure obligations are not
implemented by the end of the term referred to in sub-regulation (1),
the Board shall execute in full or part, as appropriate, the financial
assurance and the Board shall retain a specialized engineering or
environmental firm to implement the closure obligations in default,
whose costs will be reimbursed by the defaulting mineral right holder.
(3) In the event of a second offence the environmental
licence shall be suspended.
(4) Where the amount of the financial assurance is
insufficient to fully implement the closure obligations, the holder of
the mineral right shall pay the amount that is required to complete the
closure works, to a special financial assurance account managed by
the Board.
(5) The amount referred to in sub-regulation (4) and the
reimbursable amounts indicated in sub-regulation (2), plus interest,
legal costs and any enforcement costs in relation thereto, shall be
recoverable by summary judgement if the holder of the mineral right
fails to pay such money to the special financial assurance account
within the term established by the Board.
(1) Where the holder of a mineral right intends to ceaseoperations either during the period of or on termination of its mineral
right, he shall, in accordance with subsection (1) of section 54 of the
Mines and Minerals Act 2009, present a notice to the Director of
Mines with -
(a) a full register of assets showing those assets
which he intends to remove and those which
he intends to leave in the area covered by
the mineral right or permit; and
(b) information of any potentially hazardous
substances, erections or excavations in that
area.
(2) The register of assets referred to in paragraph (a) of
sub-regulation (1) and the information on potentially hazardous
substances, erections or excavations referred to in paragraph (b) of
sub-regulation (1), shall be consistent with the Mine Closure Plan
approved by the Board.
(3) The notice referred to in sub-regulation (1) shall be
accompanied by a letter of conformity issued by the Director of Mines
and for this purpose the holder of a mineral right shall submit the
proposed notice for review by the Board.
42 43
Progressive
Closure
Default in
closure
obligations
Assets on
termination
of mineral
right.
(4) Pursuant to sub-regulation (3) the Executive Chairman
or Authorised Officer shall issue a letter of conformity or nonconformity, as the case may be, within fourteen days which shall
indicate any objections.
(5) The holder of a mineral right shall, in not more than a
period of seven days, respond to the objections of the Executive
Chairman or Authorised Officer in sub-regulation (4) and re-submit
the proposed notice, after which the Executive Chairman or
Authorised Officer shall issue a letter of conformity within a fourteen
day period and where the Board’s objections are not satisfactorily
addressed, no letter of conformity shall be issued.
(6) On receipt of the notice from the holder of a mineral
right, the Director of Mines may, if he deems it necessary, in
accordance with paragraph (a) of subsection (2) of section 54 of the
Mines and Minerals Act, require that specified items of fixed
machinery are necessary for the care and maintenance of the area
covered by the mineral right, and such items and machinery shall not
be removed.
(7) The items referred to in sub-regulation (6) shall be
excluded from the Mine Closure Plan, and the financial assurance
reduced as required, without prejudice to any corresponding
environmental liabilities to which the holder of the mining right is
subject, until such items are handed to the Director of Mines.
(8) The compensation referred to in subsection (3) of
section 54 of the Mines and Minerals Act shall not reduce compromise
or replace any payment for fines, damages, indemnities, or other
economic consequences attributable to the holder of a mineral right’s
environmental liabilities.
(9) On receipt of the notice from the holder of a mineral
right, the Director of Mines may, if he deems it necessary, require that
specified buildings and other items of fixed machinery shall be
removed or require that potentially hazardous substances, erections
and excavations be removed or made safe in such manner as he may
direct in accordance with paragraphs (b) and (c) of subsection (2) of
section 54 of the Mines and Minerals Act.
(10) The requirements referred to in sub-regulation (9) shall
be consistent with the decommissioning and other abandonment
measures contemplated in the MCP approved by the Board and the
Director of Mines shall consult with the Board in case of any doubt
on the matter.
(11) Where the requirements referred to in sub-regulation
(9) involves the holder of the mineral right to perform additional works,
the Executive Chairman shall require the holder of a mineral right to
submit a proposed amendment to the Mine Closure Plan indicating
the additional works required and the associated costs, the holder of
a mineral right shall present a financial assurance to the Board for the
additional works which shall be included in the Mine Closure Plan.
Mines and Minerals Act, the environmental licence holder shall
undertake a full inspection of the integrity and safety of any fresh
water dam that is to be retained and advise the Director of Mines and
the Board on the long-term engineering and cost implications of
retention.
(2) After consultation with the Director of Mines, the
Board may instruct the retention, removal or modification of the dam
and reservoir and the environmental licence holder shall modify the
Mine Closure Plan accordingly.
44 45
Retention of
fresh water
dams
(1) In accordance with the sustainability principleestablished under Regulation 3 and subsection (1) of section 132 of
the Mines and Minerals Act 2009, and for the purposes of the
community development, provisions contained in sub-paragraph (i)
of paragraph (c) subsection (1) of section 140 and paragraph (b) of
subsection (2) of section 140 of the Mines and Minerals Act 2009, the
local community or the local authority may file a request to the Board
through its Executive Chairman or Authorised Officer in order to
exclude from the Mine Closure Plan, certain facilities, such as roads,
buildings, water wells, or other, that can be beneficial to the local
community after the termination of the mining activities, in which
case, the local community or the local authority, as appropriate,
shall take the responsibility for the maintenance of such facilities as
well as for their closure should it be required.
(2) The Board, through its Executive Chairman or
Authorised Officer shall communicate its decision by written notice
to the community representative or the local authority, as the case
may be, within thirty days.
(3) Where the request is approved, the Board shall
indicate the maintenance and closure obligations to be assumed by
the local community or the local authority.
(4) The Board through its Executive Chairman or
Authorised Officer, shall also notify the related holder of the mining
permit, and shall withdraw such facilities from the Mine Closure Plan,
and reduce the financial assurance in the proportionate amount.
Mine Closure Plan every two years or at the request of the Board, for
review by the Board and the closure cost of areas that have been
rehabilitated as contemplated in the Environmental Management Plan
and the Mine Closure Plan, shall be eliminated from the budget and
the financial assurance reduced or increased accordingly.
(2) The holder of the mineral right shall submit for
consideration by the Board, modifications to the Mine Closure Plan
and associated financial assurance which are required as a result of
the modification of the mining activities.
(3) The Board through its Executive Chairman or Authorised
Officer shall communicate its decision by written notice to the holder
of the mineral right within thirty days of submission of the Mine
Closure Plan and associated financial assurance.
(1) The Mine Closure Plan shall include a proposedmonitoring and reporting programme for the Executive Chairman or
Authorised Officer to control and supervise the execution of closure
measures as proposed by the holder of the mineral right.
(2) The monitoring and reporting programme referred to
in sub-regulation (1), shall include a minimum of a three-year
monitoring and reporting period after final closure in order to verify
that the Mine Closure Plan has been successfully implemented and
the area has reached physical, chemical and ecological stability.
(3) The Board may establish a longer monitoring and
reporting period if deemed necessary.
Where the Mine Closure Plan has been fully implementedand the Board is satisfied that the project area has been rehabilitated
to a condition suitable for stable and sustainable use, the Executive
Chairman shall issue a closure certificate and return the remaining
financial assurance to the holder of the mining right.
PART VII - ENVIRONMENTAL STANDARDS
(1) Environmental quality standards shall establish thedegree, level or concentration of elements and substances, as well
as physical, chemical and biological parameters, present in ambient
air, water or soil that does not pose a significant risk on the public
health and the environment.
46 47
altaernative
use of
facilities
Review and
modification
of Mine
Monitoring
and reporting
Closure
certificate
quality
standards
(2) Alterations of environmental quality exceeding the
environmental quality standards are not legally imputable to the holder
of a mineral right unless a direct cause-effect relationship between its
operations and the violation of the environmental quality standards
is established.
(a) shall establish the degree, level or
concentration of elements and substances
as well as physical, chemical and biological
parameters that characterize a particular
effluent or emission from a mining operation,
in excess of which public health, human
wellbeing or the environment are or might be
harmed
(b) shall be measured at their punctual source
and include funnels and waste water pipes.
(2) The Board shall prescribe effluents and emission
quality standards and recommend air, water and soil environmental
quality standards in accordance with paragraphs (h) and (t) of section
12 of the Act.
(3) The holder of a mineral right shall comply with effluent
and emission quality standards.
(4) The Board shall enforce effluents and emission quality
standards and impose penalties in case of infringement in accordance
with Regulation 83 and these Regulations.
(1) Adjustment to new standards for on-going miningoperations shall be prescribed by the Board and shall be gradually
and progressively undertaken by the holder of the mineral right
within a reasonable period of time prescribed by the Board.
(2) The period of time referred to in sub-regulation (1)
shall be determined by the Board on a case by case basis and always
in consultation with the appropriate industry specialists.
(3) Exceptionally, and for only one time, the Board may
extend the period referred to in sub-regulation (2) for such extended
term it deems necessary, if the social cost of standards implementation
is greater than the overall benefit to the local community.
The prohibition of the discharge of any toxic and hazardoussubstance into the air or in, on or under the land and waters of Sierra
Leone imposed under subsection (5) of section 58 of the Act shall
apply to discharges from mining activities which infringe the effluent
and emissions quality standards established by these Regulations.
Where the natural quality of water used in mining activitiesalready exceeds the effluent standards established by these
Regulations, the effluent discharges from such operations shall not
have a lower quality than the water taken from its natural source.
(1) Except as provided under Regulation 48, e f f l u e n tinternational quality standards for mining and metallurgic
operations are as follows :
48 49
Effluent and
Emission
Standards.
Application
of standards
Prohibition.
Ambient
water quality.
Effluent
Standards.
PARAMET ER UNIT OF LIMIT AT ANNUAL
MEASURE ANY MOMENT AVERAGE
LIMIT
P h S.U 6- 9 6- 9
Total Suspended Solids mg/l 50 2 5
Oil and Grease mg/l 1 0 1 6
Total Cyanide mg/l 1 8
Total Arsenic mg/l 0.1 0.08
Total Cadmium mg/l 0.05 0.04
Hexavalent Chrome mg/l 0.1 0.08
Total Copper mg/l 0.6 0.4
Iron (dissolved) mg/l 2.0 1.6
Total Lead mg/l 0.2 0.16
Total Mercury mg/l 0.002 0.0016
Total Zinc mg/l 1.5 1.2
(*) Unfiltered sample.
(2) The results from effluents sample analysis shall not
exceed the value established in the column: “limit at any moment”.
(3) Annual concentration for each parameter shall not
exceed the values established in the column: “annual average limit”
The holder of a mineral right shall not dilute effluents withfresh or saline water or mix industrial and domestic effluents.
(1) Air quality standards for mining and metallurgicoperations shall be as follows:
50 51
Effluent
dilution and
mixing
prohibited.
Air quality
Standards
Parameter Unit Measure Limit at any Moment
Arsenic mg/m3 5
Carbon monoxide mg/m3 29
Copper mg/m3 1
Free silica mg/m3 5.0
Hydrogen cyanide mg/m3 11
Hydrogen sulfide mg/m3 14
Lead, dusts & fumes as Pb mg/m3 0.15
Nitrogen dioxide mg/m3 6
Particulate
(interior nuisance dusts) mg/m3 10
(2) Quality standards for sulphur dioxide emissions
SULPHUR INPUTTons/day SO2 EMISSION LIMIT Tons/day
<10 20
11-15 25
16-20 30
21-30 40
31-40 50
41-50 60
51-70 66
71-90 72
91-120 81
121-150 90
151-180 99
181-210 108
211-240 117
241-270 126
271-300 135
301-400 155
401-500 175
501-600 195
601-900 201
1201-1500 213
> 1500 0.142 (S)*.
*(S) = Total sulphur input into the process
(1) The Board shall establish standards for other effluentand emission parameters as it may deem necessary and shall review
such standards annually to incorporate any new effluents, emissions
or measurement criteria.
(2) The holder of a mineral right shall technically
demonstrate to the Executive Chairman or Authorised Officer that
effluent discharges and emissions from operations for parameters
not yet regulated by these Regulations, do not cause negative effects
to public health, safety and the environment.
(EIA, ESIA and EMP) shall indicate-
(a) proposed control checkpoints for every
effluent and emission generated from the
operations;
(b) effluent and emission monitoring stations to
be installed in each control checkpoint;
(c) the number and technical characteristics of
monitoring equipment to be installed in each
monitoring station;
(d) the frequency with which sampling shall be
carried out at each monitoring station.
(2) For the purposes of these Regulations, effluent and
emission samples shall be taken from every control checkpoint
established in the EIA, ESIA and EMP.
(3) No change in the location of any checkpoint or
monitoring station shall be made unless with prior approval by the
Executive Chairman or Authorised Officer.
(1)The holder of an environmental licence shall measurethe concentration of each regulated parameter on a quarterly basis in
order to determine pollutants concentration as well as the volume of
effluent and emission discharges.
52 53
Regulation of
other
parameters.
Control and
Monitoring
stations.
Monitoring of
effluents and
emissions by
licence holder
(2) The holder of an environmental licence for a Category
A or B project shall present a quarterly report to the Executive Chairman
or Authorised Officer containing the effluents and emissions
monitoring results for the last three months and an analysis and
interpretation of these results.
(3) The holder of an environmental licence for a Category
C project shall monitor its effluents and emissions and keep the
information readily available for review by the Board or Authorised
Officer
(4) The Board or the Authorised Officer may, at any time,
request from the holder of a Category C Project environmental licence
the monitoring information referred to in sub-regulation (3) for the
purposes of review and control.
(5) Every holder of an environmental licence shall keep
monitoring information for a period of five years.
(1) Effluent and emission sample collection and analysisshall be carried out according to the official monitoring guidelines
approved by the Board.
(2) The Board shall by statutory instrument, prescribe
the guidelines referred to in sub-regulation (1).
(1) The Board shall impose on the holder of a mineralright the penalties prescribed in these Regulations in the following
cases-
(a) effluents and, or emissions exceeding legal
limits; and/or
(b) dilution or mixing of effluents.
PART VIII -– MONITORING AND INSPECTION
55 (1) The Executive Chairman or Authorised Officer shall
conduct both routine and random inspection and supervisory actions
of the environmental performance of mining operations of all
environmental licence holders.
(2) The Executive Chairman or Authorised Officer shall
supervise mining operations in accordance with the Code of Practice
specified in the Eighth Schedule and enforce compliance with these
Regulations.
(3) Control and supervisory actions comprise project
monitoring, routine and random inspection visits at site, and
environmental auditing.
(1) The Executive Chairman or Authorised Officer shallestablish a routine inspection schedule for every mining activity
covered by an environmental licence.
(2) Notwithstanding sub-regulation (1), Category A
projects shall be inspected at least three times each year, category B
projects shall be inspected twice a year and category C projects shall
be inspected once a year.
(3) For all routine inspections the Executive Chairman or
Authorized Officer shall give the environmental licence holder five
days’ notice of the planned inspection in advance to the holder of
the mineral right, informing him of the scheduled inspection visit,
indicating -
(a) the name(s) and identification number of
the officer(s) appointed for site visiting;
(b) time schedule indicating date of visit and
number of days of presence at site if
applicable; and
(c) logistic requirements as applicable.
54 55
Sampling
protocol
Penalties
Imposed by
Board
Control and
supervision.
Site visits.
(4) The notice referred to in sub-regulation (3) shall be
delivered by hand or email to the holder of the mineral right, provided
that any notification by email shall be deemed to be delivered upon
receipt of email confirmation by the Executive Chairman or Authorised
Officer.
(5) The holder of the mineral right shall include in his
application for an environmental licence, current address and email
contact details and undertake to promptly notify the Executive
Chairman or Authorised Officer of any change of address or email
address.
(6) Failure by the holder of the mineral right to comply
with sub-regulation (5), shall not prevent the Board, Executive
Chairman or Authorised Officer, from performing an inspection under
this Regulation.
Chairman or Authorised Officer shall, from time to time conduct random
inspection of any project in respect of which an environmental licence
has been issued in order to assess their effect on the environment
and the community and ascertain compliance with the Act and these
Regulations.
(2) For the effective exercise of these powers, the
Executive Chairman or Authorized Officer may-
(a) enter at any time, without warrant, any
premises or facility where mining activities
are being undertaken and inspect the project
at any time, subject only to full compliance
with radiation and mine health and safety
standards;
(b) request from the holder of a mineral right any
environmental information or documentation
pertaining to the mining activities, including
any licence issued under the Act and these
Regulations, project records, or any other
document he deems relevant;
(c) take samples of emissions, effluents, soil,
wastes or any other substances or residues
from the operations;
(d) perform tests in-situ; and
(e) perform any other tests, take samples and
request information or documentation
pertaining to the mining activities that he may
deem necessary.
(3) The Executive Chairman or its Authorized Officer may
request the support of the police for the performance of its functions
under these Regulations
(1) Category A and Category B environmental licenceholders may arrange for environmental and social audits to be
conducted on their own operations from time to time, by fully qualified
environmental and social auditors in order to inform the content of
their environmental and social reports.
(2) Auditors for Category A and B audits shall be of
accredited international environmental and social audit standards.
(3) A copy of every independent audit undertaken by
Category A and B environmental licence holders shall be submitted
to the Executive Chairman or Authorised Officer together with the
annual environmental and social report.
(4) The Executive Chairman shall recognise and accept
copies of duly certified and audited independent environmental audits
produced by the mineral right holder for its financiers to ensure
compliance with the Equator Principles.
(1) The Executive Officer or Authorised Officer mayarrange for random auditing to be carried out on any environmental
licence holder’s operations in order to ensure consistency and
transparency in environmental and social monitoring.
56 57
Random
inspection.
Voluntary
Audit.
Compulsory
audit.
(2) The frequency of random audit shall vary with the
scale and significance of the project and the level of performance
identified through routine sampling, inspection and monitoring by
the licence holder as follows -
(a) Category A and B project environmental
licence holders at a frequency of 3 per year.
(b) Category C project environmental licence
holders at any time if a routine inspection by
the Executive Chairman or Authorised Officer
indicates that there are serious omissions in
environmental or social performance.
(3) The Board shall be responsible for the selection of
auditors and such selection shall be in accordance with the standards
set out in Regulation 60 and the principles contained in the Eighteenth
Schedule.
(1) The Board shall conduct a competitive and opentender, in accordance with the Public Procurement Act, 2004 (Act
No. 14 of 2004), for a rooster of competent environmental auditors
who, upon selection by the Board, shall become part of a standing
pool of environmental auditors which may be called upon by the
Board or the Executive Chairman at any time within a 3 year period
for the purposes of conducting routine or specific environmental
audits.
(2) Bidding information to be requested by the Board
shall include -
(a) clear requirements of an anticipated
programme of work;
(b) the required technical competencies;
(c) any other specific requirements of the Board
relating to the anticipated environmental
audit;.
(d) schedule of costs for the tendered framework
plan,
(e) previous experience of similar work advertised
by the Board; and
(f) a list of available technical consultants and
their detailed resumes.
(3) Where the costs of an environmental audit remains
unresolved, the environmental licence holder may appeal to the Board,
whose decision on any disputed costs shall be final and binding.
(4) Whenever the Board requires the services of an
environmental auditor for the purposes of these Regulations, it shall
promptly notify those auditors chosen from an existing pool of
environmental auditors in order to determine their availability to
commence work.
(5) The terms of reference for any specified audit shall be
developed and agreed with the environmental licence holder.
(6) Auditors shall be selected by the Board based on the
responses from the standing pool of approved environmental auditors
relating to price, expert qualifications and ability to mobilise:
provided that those companies or individuals who have
been involved or contracted by the environmental licence holder to
undertake any work related to environmental or social issues within
the previous 12 months shall be excluded from undertaking any
auditing work, and any selected environmental auditor shall be
prohibited from providing services related to the environmental or
social issues to the environmental licence holder for six months after
the completion and submission of the audit.
58 59
Appointment
of Auditors
and cost.
PART IX ENFORCEMENT
(1) The holder of a mineral right shall submit to the localcommunities, a formal grievance mechanism in accordance with the
following principles-
(a) legitimacy;
(b) accessibility;
(c) predictability;
(d) equitability;
(e) transparency;
(f) ensuring that communities’ rights under these
Regulations and other laws are respected;
(g) dialogue and engagement; and
(h) encouraging an environment of continuous
improvement of processes and dialogue.
(2) The holder of a mineral right shall designate a
grievance officer early in the project cycle to-
(a) inform the local community and the Primary
Host Community and raise awareness of the
grievance mechanism.
(b) manage grievances and ensure full documentation of grievance processes; and
(c) meet members of the community to resolve
informal complaints.
(3) Where grievances are unresolved by the holder of a mineral
right, an arbitrator shall be jointly appointed by the Executive Chairman
or Authorised Officer and the representative of the local community.
(4) The local community shall identify an appropriate
person to represent the community in all arbitration matters and the
representative shall be an internationally accredited negotiator or
mediator with experience in mining related grievances.
(5) The costs of any arbitration and shall be borne by the
holder of a mineral right.
The enforcement measures in these Regulations are inaddition to the enforcement measures of the Board in sections 53,
54, 55 and 56 of the Act.
(1) Pursuant to subsection (3) of section 37 of the Act,where the Executive Chairman or Authorized Officer has reasonable
grounds to believe that an offence has been committed or is about to
be committed in violation of the Act or these Regulations, he may
without a warrant, enter, conduct inspections in or search any mining
site, premises, facilities, vehicles or other buildings, sites or facilities
associated with the mining activity, in which he has reasonable
grounds to believe an offense has been, is about to be or is being
committed.
(2) The Executive Chairman or Authorized Officer may
seize any document, item or substance which he has reasonable
grounds to believe has been used in the commission of such offence
or in respect of which an offence has been committed.
(3) A receipt shall be given for anything seized under
this regulation which states the grounds for such seizure.
(4) The Executive Chairman or Authorized Officer may
require the police to arrest any person who he suspects to have
committed an offence.
Every person shall have a standing before the Board toraise any matter of concern regarding violations of social and
environmental obligations.
60 61
Grievance
mechanism
Enforcement
measures.
offences.
Standing.
(a) allow the Executive Chairman or Authorized
Officer to enter the project premises, and
conduct all or any of the actions in exercise
of the functions and powers conferred upon
him by the Act and these Regulations.
(b) provide assistance to the Executive Chairman
or Authorized Officer in exercise of the powers
conferred on him under the Act and these
Regulations.
(2) The holder of a mineral right or its corporate
environmental officer, shall report any environmental accident relating
to its mining activities to the Executive Chairman or Authorized Officer
within twenty-four hours of the accident and submit a detailed report
on the accident within ten working days of the date on which the
accident took place.
Where a holder of a mineral right is obligated to provide afinancial assurance under section 136 of the Mines and Minerals Act
2009 and fails to do so, the Director shall-
(a) cause to be served, on the holder of a mineral
right a notice of demand; and
(b) cause a note of the service of the notice to be
endorsed in the mining cadastre register, in
accordance with subsection (5) of section136
of the Mines and Minerals Act, 2009.
PART X – ADMINISTRATION OF ENVIRONMENTAL LICENCE
(1) An application for environmental licence undercategories EIA or ESIA shall be submitted to the Board in accordance
with section 24 of the Act.
(2) The Minerals Advisory Board shall not consider an
application for exploration, small scale or large scale mining right or
permit unless the applicant submits an enviromental licence granted
to it by the Board.
(3) An application for an environmental licence under
sub-regulation (1) shall–
(a) provide details of any significant adverse
effects that–
(i) a reconnaissance operations is likely to
have on the environment and on any
monument or relic in the proposed
reconnaissance area and an estimate of
the cost of combating such adverse
effects in accordance with paragraph (J)
of section 57 of the Mines and Minerals
(ii) an exploration operation is likely to have
on the environment and on any
monument or relic in the proposed
exploration licence area and an estimate
of the cost of combating such adverse
effects in accordance with paragraph (J)
of section 70 of the Mines and Minerals
(b) an environmental impact assessment licence
as prescribed under the Environment
Protection Act as a condition for granting a
small-scale mining licence or a large-scale
mining licence in accordance with subsection
(2) of section 131 of the Mines and Minerals
62 63
Duties of
mineral right
holder.
Financial
assurance.
Application
for environmental
licence.
(c) be accompanied by a statement on the
consequences of dredging including the
destruction of monuments and relics, sacred
places and burial grounds in accordance with
paragraph (a) of subsection (2) of section 228
of the Mines and Minerals Act, 2009.
(1) An environmental licence granted by the Board underthe Act shall entitle the licensee to initiate or continue with the
application process for a mining right or permit.
.
(2) Where an application for an environmental licence is
rejected by the Board, the mining right or permit application shall be
deemed to be incomplete and not compliant with mineral right
licensing requirements.
(1) An environmental licence shall be valid for twelvemonths from the date of issue or for such period as the Board may
determine and in accordance with paragraph (c) of section 30 of the
Act.
(2) The period specified in an environmental licence may
be renewed by the Board, upon application by the licensee, for such
further period as the Board shall determine and in accordance with
section 31 of the Act.
(1) The holder of an environmental licence who wishesto amend an EIA or ESIA shall submit an application to the Board for
that purpose.
(2) Subject to sub-regulation (1), an EIA or ESIA shall be
amended or modified in the following cases-
(a) for the implementation of mine development
at completion of the exploration phase, and
before the commencement of mining
activities;
(b) for increments of mineral production greater
than 50% of the production estimated in the
original EIA, in small-scale mining
operations;
(c) for increments of mineral production greater
than 30% of the production estimated in the
original EIA, in large-scale mining operations;
(d) for increments of mineral production in smallscale or large-scale mining operations having
new environmental impacts or involving
disturbance of new areas;
(e) for the construction and operation of new
beneficiation facilities not included in the
beneficiation plant original layout;
(f) for the modification of existing beneficiation
facilities due to introduction of new mineral
processes or increment of production
capacity greater than 50%;
(g) for the construction of tailing ponds, rock
deposits, furnaces, chimneys, leaching pads
or other facilities not included in the
beneficiation plant original layout;
(h) for the introduction of new equipment or
variations of technology in mining or
beneficiation facilities having new environmental impacts or affecting new areas.
(3) Subject to sub-regulation (2), the Board may determine
that amendments to an ESIA may result in re-categorization of the
project into a Category A or B project that shall require an EIA.
64 65
Legal effect
of licence.
Validity and
renewal.
Amendment
of EIA or
ESIA
(1) Pursuant to Section 34 of the Act, where t h eterms and conditions of a licence are not being complied with or have
been contravened, or there is a substantial change in or an adverse
effecton the environment as a result of the operations of the holder
of a mining licence, the Board may-
(a) cancel the licence;
(b) suspend the licence for such time as the
Board considers appropriate; or
(c) impose additional or modified conditions for
the licence:
Provided that the Board shall,
prior to any decision to cancel, suspend or
modify the licence conditions, consult with
the holder of the mineral right and give him
an opportunity to take corrective measures
to remedy or abate the offending events for
a period not exceeding 3 months.
(2) The Executive Chairman or Authorised Officer shall
notify the Director of Mines and the holder of an environmental
licence in writing of the cancellation, suspension or imposition of
additional conditions of a licence and of such additional conditions
that may have been imposed.
(3) The Board may, in addition to cancellation,
suspension or imposition of additional conditions, require the holder
of a mining permit to take measures to remedy or abate such adverse
effects on or remedy any damage to the environment where necessary.
(4) The Board may engage an appropriately skilled
independent consultant to produce a technical assessment report of
the offending events that may assist the Board to determine whether
to cancel, suspend or impose additional conditions on the holder of
the mining right or permit and the costs of such report shall be borne
by the holder of the mineral right or permit.
(5) The suspension or cancellation of the mining right or
permit to which the environmental licence applies shall be determined
in accordance with section 53 of the Mines and Minerals Act, 2009.
(1) An applicant who is dissatisfied with the decision ofthe Board not to grant or to reject an application for an environmental
licence or to cancel or suspend an existing environmental licence
may appeal to the High Court within thirty days of the Board’s
notification of its decision to the applicant.
(2) A member of the local community aggrieved by the
Board’s decision to grant an application for an environmental licence
may appeal to the High Court within thirty days of the Board’s
notification of its decision to the applicant to grant the application
for an environmental licence.
(3) The filing of the appeal shall under sub-regulation (2)
and (3) shall not suspend the effects of the Board’s decision and
shall remain in force until the High Court suspends or revokes the
decision of the Board.
(1) The Executive Chairman or Authorised Officer shallestablish and maintain a Register of Environmental Licences in which
shall be recorded all applications and licences granted including all
ancillary documents and materials.
(2) The Register of Environmental Licences referred to in
sub-regulation (1), shall be a public document and shall be available
for public inspection on payment of the prescribed fee.
(3) A copy of the Register of Environmental Licences
shall be deposited with the mining cadastre on a semi-annual basis.
The environmental licence approval process shall requirestakeholders’ participation and reaction and accordingly in order to
give the applicant an opportunity to plan in advance on how to
mitigate negative environmental impact and social impact before they
arise.
66 67
Cancellation,
suspension,
and ex officio
modification.
Appeal
Licence
register.
Stakeholders
participation.
PART XI– MISCELLANEOUS
(1) All environmental licences issued prior to the cominginto force of these Regulations shall be valid for the period of
the licence.
(2) The Board may review all environmental licences
issued prior to the coming into force of these Regulations in order to
assess whether the environmental and social impact assessments
and associated management plans have been completed to the
standards established in these Regulations.
(3) Subject to sub-paragraph (2), the Board may amend
any plan or document associated with any environmental licence
issued prior to the coming into force of these Regulations.
(4) All mineral right holders shall, not later than six
months after to the coming into force of these Regulations, ensure
that their operations are in compliance with the Environmental
Standards established in Part VII of these Regulations.
(5) Existing mineral right holders who do not have an
environmental licence shall apply for an environmental licence not
later than six months after the coming into force of these Regulations.
(1) Where the Board requires additional information tothat already provided by an applicant or licence holder, the Executive
Chairman or Authorised Officer shall submit a written request to the
applicant or licence holder specifying the information required and
stating the reason for requesting the information.
(2) If the applicant refuses to provide information
requested under sub-regulation (1) the Board may refuse a new
application, suspend or revoke an existing licence.
Reconnaissance and exploration operations undertaken forthe purpose of locating mineral deposits shall be developed under
an environmental management instrument, issued by the Board in
accordance with these Regulations.
(1) Where there is a transfer of a mineral right, thetransferee shall implement the EIA or ESIA, as applicable and MCP
approved by the Board in relation to the mineral right in accordance
with subsection (7) of section 83 and subsection (7) of section119 of
the Mines and Minerals Act, 2009.
(2) Sub-regulation (1) shall apply to all and any kind of
mineral right or permit acquisition.
(1) All small-scale and large-scale mining licence holdersshall provide, within such time as specified by these Regulations,
financial assurances for their own performance against all obligations
to which they are subject under an EMP or the terms of an
environmental licence and in accordance with subsection (2) of section
137 of the Mines and Minerals Act 2009.
(2) The form of financial assurance to be provided under
sub-regulation (1) shall be in such form as specified in subsection (4)
of section 136 of the Mines and Minerals Act, 2009.
(3) The holder of a mineral right shall provide only one
financial assurance against all environmental and social liabilities
resulting from his mining activities in a specific project and shall not
be required to provide two assurances in relation to its environmental
and social liabilities deriving from a specific project.
(1) The Act and these regulations shall not apply to anyland marked on the cadastral survey map in accordance with paragraph
(c) of subsection (1) of section 46 of the Mines and Minerals Act,
2009 and known to be closed to mining.
(2) In application of sub-regulation (1), the cadastral
survey map shall depict all national parks, natural reserves,
archaeological sites, and other protected areas established throughout
Sierra Leone in accordance with paragraph (d) of subsection (2) of
section 176 of the Mines and Minerals Act, 2009.
Executive Chairman shall suspend or cancel a mineral right if the
holder grossly violates health and safety regulations or causes
environmental harm in accordance with paragraph (c) of subsection
(1) of section 53 of the Mines and Minerals Act, 2009.
68 69
Existing
licences and
rights.
Information
disclosure.
managementinstrument.
Transfer
obligations.
Financial
assurance.
Cadastral
survey map.
Suspension.
(2) The Board shall order the holder of the mineral right
to immediately implement environmental rehabilitation as prescribed
under Section 136 of the Mines and Minerals Act 2009.
(1) Notwithstanding any penalties prescribed in the Actor the Mines and Minerals Act, any violation or infringement of the
provisions of these Regulations by the holder of a Category A or B
Environmental Licence shall be assessed and categorised as follows-
(a) administrative infringements with no
immediate environmental consequences
involving the submission of reports or
maintenance of records required under the
Act or these regulations shall be termed
category EP1A;
(b) operational infringements resulting in the
potential for harm to the environment or local
communities shall be termed category
EP2A;
(c) operational infringements resulting in actual
harm to the environment or local communities
shall be termed category EP3A; and
(d) operational infringements resulting in
substantial harm to the environment or local
communities, loss of life or Serious Injury or
illness shall be termed category EP4A.
(2) Notwithstanding any penalties prescribed in the
Act or the Mines and Minerals Act, any violation or infringement of
the provisions of these Regulations by the holder of a Category C or
D Environmental Licence shall be assessed and categorised as
follows-
(a) administrative infringements with no
immediate environmental consequences
involving the submission of reports required
under the Act or these regulations or
maintenance of records shall be termed
category EP1B;
(b) operational infringements resulting in the
potential for harm to the environment or local
communities shall be termed category EP2B;
(c) operational infringements resulting in
substantial harm to the environment or local
communities shall be termed category EP3B;
and
(d) operational infringements resulting in
substantial harm on the environment or local
communities, loss of life or Serious Injury or
illness shall be termed category
EP4B.
(1) The Executive Chairman or Authorised Officer shall,acting reasonably, determine whether an infringement is categorized
as EP1A, EP1B, EP2A or EP2B and shall promptly notify the Board of
the relevant categorization decision and reasons therefore.
(2) The Executive Chairman or Authorised Officer in
consultation with the Board shall determine whether an infringement
is categorized as EP3A, EP3B, EP4A or EP4B.
(1) A holder of an environmental licence who infringesany of the provisions of these Regulations commits an infringement
and shall be liable, subject to Regulation 85, to a penalty specified in
the Schedule of penalties.
(2) In relation to categories EP3A, EP4A, EP3B and EP4B
and potential benefits of non-compliance, the Environmental License
Holder shall be liable to an additional penalty from the first provable
day of infringement as follows:
70 71
Category of
penalties.
Infringement.
Penalty.
or cancellation of
mineral
rights.
(a) up to 1% of the additional daily penalty for
each day of the first 100 days of infringement;
(b) the additional daily penalty increases by up
to 1% after every 100-day period for the first
500 days of continuous infringement, so that
after 100 days the additional penalty
increases to 2%, after 200 days to 3%, after
300 days to 4%, after 400 days to 5%.
(3) An infringement shall be deemed to be continuous
until the company demonstrates compliance, unless the company
provides evidence to the satisfaction of the Executive Chairman and
Board that the violation was not continuous.
(1) In relation to a category EP1A, EP1B, EP2A and EP2Binfringement only, the Executive Chairman or Authorised Officer shall,
prior to imposing a penalty in accordance with this Part, issue a
written warning to the environmental licence holder informing him of
the relevant infringement and providing giving him a period not
exceeding 14 days within which to remedy the relevant infringement.
(2) Where the environmental licence holder fails to
remedy the infringement in accordance with sub-regulation (1), the
prescribed penalty for the relevant infringement category shall be
imposed.
(1) The Executive Chairman or Authorised Officer shallnotify the environmental licence holder in writing of the infringement
and the related penalty.
(2) The environmental licence holder shall pay the penalty
within 30 days of the notification referred to in sub-regulation (1) and
where the environmental licence holder fails to pay the penalty within
30 days the Executive Chairman or Authorised Officer may apply to
the High court for an order to enforce the penalty.
(3) An environmental licence holder who disputes any
penalty imposed by the Executive Chairman or Authorised Officer
shall be resolved, in the first instance, by arbitration.
(4) An internationally accredited negotiator or mediator
with experience in mining related grievances shall be jointly appointed
by the environmental licence holder and the Executive Chairman or
Authorised Officer as an arbitrator.
(5) The costs of the arbitration shall be paid by the
environmental licence holder.
(6) Either party may appeal to the High Court against the
decision of the arbitrator appointed under sub-regulation (4) within
10 days of receipt of the arbitral decision.
(7) The losing party shall pay all costs and fees
associated with the appeal.
(8) The decision of the High Court shall be final and
binding.
(1) An environmental licence holder shall be liable for anycivil or criminal action to which he may be subject at any time and the
penalty provisions contained herein shall not be interpreted as
excluding liability or providing compensation in relation to any such
criminal or civil liability.
(2) The penalty provisions contained in these
Regulations are in addition to and in no way limit or exclude the
obligation of an environmental licence holder’s responsibility to spend
funds and take any other remedial or restorative actions required to
clean up and rehabilitate all damages resulting from an infringement
and where practicable, restore damaged land or goods to their
condition prior to the occurrence of the offence.
(3) Any compensation or fines indicated in the Act shall
not reduce, preclude, compromise or replace any payment of penalties,
damages, indemnities or other economic consequences attributable
to an environmental licence holder under these Regulations.
(4) An environmental infringement shall not be liable to a
penalty under these Regulations and the Mines and Minerals Act,
2009 only one penalty shall apply.
72 73
Warnings.
Notification
and payment
of fines.
No exclusion
of liability.
SCHEDULE OFPENALTIES (REGULATION 84)
EP1A Category A or B environmental licence holder $10,000
EP2A Category A or B environmental licence holder $50,000
EP3A Category A or B environmental licence holder $250,000
EP4A Category A or B environmental licence holder $750,000
EP1B Category C or D environmental licence holder $5,000
EP2B Category C or D environmental licence holder $25,000
EP3B Category C or D environmental licence holder $125,000
EP4B Category C or D environmental licence holder $375,000
FIRST SCHEDULE - PUBLIC PARTICIPATION AND CONSULTATION
1. Requirement for public participation and consultation
Regulation 3 (h) places a mandatory obligation on all applicants for an
environmental licence to carry out consultation with stakeholders from
the earliest stages of a mining project throughout the mining operations
until closure is completed. This consultation shall be undertaken in
accordance with the principles for public participation and consultation
set out in Regulation 3 (h) and this Schedule.
2. Procedural requirements for each category of mining project
Applicants for mining projects under the following environmental licence
categories shall, as a minimum requirement, undertake the following level
of public participation and consultation.
Category D: There is no formal requirement for public participation and
consultation in relation to a Category D project, however the holder of a
mineral right shall recognize the legitimate interests of local communities
74 75
to be informed about any activities which involve the transport of equipment and personnel and the use of accommodation in association with
mineral reconnaissance and prospecting and shall provide relevant
information to such stakeholders.
Category C: Applicants for an environmental licence in relation to a Category C
project shall arrange a public meeting within the area likely to be affected by
exploration or small scale mining activities before any equipment is moved into the
area or physical activity takes place on site.
The purpose of the meeting will be to discuss with the community the nature of the
work and its likely impacts and to engage in dialogue with the community which
must include answering questions and addressing concerns.
Where activities are ongoing, the holder of an environmental licence shall hold
public meetings with local communities at regular intervals, which shall occur at
least every three months.
Category B: The requirements for public participation and consultation set out
for Category C projects above shall also apply to Category B projects.
In addition, where the area covered by a Category B project includes more than
one settlement and these settlements are more than 5 kilometers apart, the holder
of or applicant for an environmental licence shall organise public meetings in each
settlement.
In the case of Category B projects, the holder of or applicant for an environmental
licence shall develop and implement a communications plans to manage public
participation and consultation throughout the term of the mining licence or
environmental licence, as applicable.
The communications plan shall be included in the Environmental Management
Plan and Social Management Plan.
Category A: The requirements for public participation and consultation set out
for Category B projects shall also apply to Category A projects.
In addition, all arrangements for public participation and consultation contained
within the communications plan shall be discussed and agreed with the Community
Liaison Committee established under Regulation 7.
SECOND SCHEDULE - PROJECT SCREENING APPLICATION
(REGULATION 11(5))
TO DETERMINE THE CATEGORY OF PROJECT FOR AN
ENVIRONMENTAL LICENCE
1. Procedures
Applicants for an environmental licence required in connection with the following
categories of mineral rights licences shall submit a project screening application as
set out in Tables 1 through 3 below. This information will be used by the Agency
to determine which category of environmental impact assessment shall be
undertaken by the applicant to support its application for an environmental licence
relating to:
(a) A Reconnaissance Licence involving invasive activities under Section 64
of the Mines and Minerals Act 2009;
(b) An Exploration Licence under Part IX of the Mines and Minerals Act 2009;
(c) A small scale mining licence; and
(d) A large scale mining licence.
Table 1 Information on the Applicant and the nature of the planned
operation
1. Thefollowing information isin summary form (full details shall be
submitted as set out in theAct).
(a) Registered Name and place of incorporation of the company
………………………..……………………………………………………….
(b) Company profile and history of reconnaissance and exploration
operations in Sierra Leone and elsewhere
……………………………….............…………………………………………
(c) Name and qualifications of supervising officer
…………………………………………………………………………………
(d) Plan of the reconnaissance licence area
…………………………………………………………………………………
(e) Description of contiguous blocks
………………………....………………………………………………………
(f) Statement on technical and financial resources
…………………………….........………………………………………………
(g) Proposed programme of reconnaissance operations
……………………….............…………………………………………………
(h) Period for which the application applies
……………………….........................…………………………………………
(i) Details of any existing mineral rights
…………………….............……………………………………………………
76 77
Table 2 Description of Location and Nature of Operations
2. Information required under the First Schedule
Description Units Estimated cost of remediation
(i) Area of land covered Km2 or Ha
by the application
(ii) Number of boreholes
to be drilled Number
(iii) Quantity of specimens
and samples to be taken < 1 tonne
<1-10 tonnes
> 10 tonnes
(iv) Name and surface area of
woodland or forest within
which timber will be cut
(v) Name and location of river,
lake or other water body
from which water will be
extracted
(vi) Location of any temporary
buildings
(vii) Name and location of any
ancient monument, relic,
sacred grove or other artifacts
of historic and cultural
significance that lies within
or closer than 100 metres to
the boundary of any physical
works
Table 3 Applicant’s assessment of the likely effects of the mining activities on
the natural environment within the area of mining operations
Completion of this table shall satisfy the requirements of an applicant for a
reconnaissance licence under Section 57 (j) of the Mines and Minerals Act 2009.
3. Physical Environment (Mark the relevant sections with an X and give precise details of area,
depth or volume, where these exist.)
3.1 Land Surface
Description 1 2 3 4 5
Less than 1 1 to 10 10 hectares 1 to 100 km2 More than 100
hectare hectares to 1 km2 km2
Surface area of land affected by
surface disturbance with
machinery or excavations
Area of vegetation to be cleared
Area of farmland affected
3.2 Land Excavation
If the operations involve 1 2 3 4 5
excavation what quantity of Less than 10m3 to- 100m3 to 1 million to More than
material will be moved? 10 m3 100m3 1 million m3 100 million m3 100 million m3
What is likely to be the Less than 3 3 to 15 feet 15-30 feet 30 to 150 More than 150
maximum depth of excavation feet feet feet
from the existing surface level (1 metre) (1-5 metres) (5-10 metres) (10-50 (>50 metres)
metres)
Ratio of overburden to
mineral ore recovery 0:1 1:1 Between 1:1 Between 5:1 More than
and 5:1 and 20:1 20:1
3.3 Water
Description 1 2 3 4 5
Less than 100 to 1000 to 50,000 to Over 100,000
100 m3 1000m3 50,000m3 100,000m3 m3
Volume of water to be
abstracted by gravity or
pumping from a natural or
artificially constructed water
course or water body
(maximum over one month)
Volume of water to be stored
in tanks/ settling ponds or
other artificial storage areas
78 79
Volume of waste water
(including drilling mud) to be
produced (over a maximum
period of one month)
creating a dam or impoundment
on any watercourse or dredging
operations?
diverting an existing water course?
3.4 Wildlife and Nature Conservation
Does the application area include N o Yes
any officially protected area?
Has an ecological survey been Yes N o
undertaken by a qualified biologist?
Are any rare or endangered species N o Yes
of plants or animals found within
the application area as listed in
national or international registers?
In the applicant’s opinion, will the
operations affect wild life and nature
conservation in the application area? Not at Very Some Moderate Major
all slight minor adverse adverse
effects adverse impacts impacts
impacts which
which can be
can be mitigated
mitigated
3.5 Natural Resources
Will the operation require the use N o Yes
of local timber, stone, clay or other
building materials
3.6 Infrastructure
Do existing tracks and roads lie
within the application area? Footpaths Minor tracks Dirt/ Un-surfaced Regional
gravelled District and Paved
feeder roads Roads Roads
Will any tracks and roads be
used by mineral traffic? Footpaths Minor tracks Dirt/ Un-surfaced Regional
gravelled District and Paved
feeder roads Roads Roads
How many of truck Less than 3 3 to 10 10 to 20 20 to 50 More than
movements of over 3 tonnes 50
capacity will use public roads
in an average month?
diversion or construction of metres to 1 Km 10 kms 10 kms
new roads?
diversion or construction of metres to 1 Km 10 kms 10 kms
new railways?
Does the project involve the use
of existing ports or the
construction of new ports? N o Yes Yes
(existing ports) (new ports)
Does the project involve the use
of air transport from existing or
new airports? N o Yes Yes
(existing (new
airport) airports)
3.7 Energy
Will the applicant provide all
energy requirements from the
company’s own resources? N o Yes
What is the estimated annual Less than 5000 - 50,000 to 100,000 kw More than 1
electricity requirement of the 5000kw 50,000 kw 100,000 kw to 1 mw mw
operations?
What is the estimated annual Less than 50,000 to 100,000 to 500,000 to More than 1
requirement of the operations 50,000 litres 100,000 500,000 1 million million
in terms of diesel oil or other litres litres litres litres
petroleum products?
80 81
3.8 Buildings, Structures and Processing Plant
Will the operations include Temporary Permanent Permanent Permanent Permanent
the erection of buildings and buildings buildings/ buildings/ buildings/ buildings/
structures/plant? and structures structures structures structures
structures covering covering covering covering
erected for less than 100m2 to 500m2 to more than
<5 years 100m2 500m2 1000m2 1000m2
3.9 Emissions
Will the operations generate N o Yes
solid waste requiring disposal
through land fill?
Will the operations involve N o Yes
processes giving rise to
gaseous emissions
potential to generate dust
which would impact on local
inhabitants?
potential to generate noise
which could adversely affect
local inhabitants?
Will the operations require the N o Yes
use of chemicals and reagents
in on-site processes?
Will the operations pose any N o Yes
form of risk to humans from
potential accidents and the
creation of hazards
(e.g. deep bodies of water/rock falls?)
Will the operations create unsightly N o Yes
visual impacts affecting the setting
of villages or towns?
If the answers to any of the above questions relating to “Emissions” in Part 3.9 of Table 3 are “Yes”, provide
summary details on the scale and nature of the potential effects.
Table 4Applicant’s assessment of the scale and likely effects of the operations on the local economy and
social conditions within the area of mining operations.
4.1 Resettlement Impact
Will the operations require the N o Yes
resettlement of people?
Description/Impact
Will the operations affect existing Not at all Very Some Moderate Major
settlements either directly or slight minor adverse adverse
indirectly? effects adverse impacts impacts
impacts which can
which can be mitigated
be mitigated
with more than 500 houses?
with 100-500 houses?
with 50 -100 houses?
with 25-50 houses?
With fewer than 25 houses?
Where the answer to the above questions on settlements and properties is “Yes” provide details on the estimated
number of properties and individuals involved
4.2 Effect on current land use activity
Will the operations displace or Not at all Very Some Moderate Major
reduce the viability of existing slight minor adverse adverse
land uses for: effects adverse impacts impacts
impacts which can
which can be mitigated
be mitigated
Agriculture?
Forestry?
Rural livelihoods (collecting roots/
fruits/honey etc.)?
Tourism?
Will the operations affect:
Monuments/archaeological sites:
Sacred groves?
Burial areas?
82 83
THIRD SCHEDULE - PROJECT SCREENING CRITERIA
(Regulations 11 (6) and 12 (2) )
1. Procedures
(1) The Agency shall base its decision on the information submitted as part
of the project screening application, supported by information on
environmentally sensitive areas in Sierra Leone and criteria relating to
social and local economic conditions as set out in Table 1.
(2) Any application which falls within the criteria listed in Table 1 will
automatically require a Category A or B environmental Assessment and
the equivalent social assessment.
(3) Applications falling outside the environmentally sensitive localities listed
in Table 1 will also require environmental and social assessment where
the class of assessment will be determined by the nature and scale of the
planned operations.
(4) In all cases, the class of environmental and social assessment will be
determined by the Agency in accordance with criteria set out in Table 2.
Table 1 Criteria Determining a Mandatory Need for Environmental Assessment
Criteria relating to Environmental Sensitive localities
(a) Areas and ecosystems meriting special protection under national and
international law including coral reefs, mangroves, native forest, small
islands, areas at risk from erosion including sand dunes and beaches, areas
exposed to desertification, marshland, wetlands and areas with flora, fauna
or ecosystems on the verge of extinction.
(b) Fish spawning areas and areas containing important natural resources such
as medicinal plants
(c) Important water sources including springs, headwater catchments of rivers,
and watercourses or water bodies providing public water supplies.
Criteria relating to Socially or Economically significant localities
(d) Populated areas where more than 50 properties or 500 people might be directly
or indirectly affected in terms of livelihoods.
(e) Populated areas where it might be necessary to resettle any individual
inhabitants involuntarily.
(f) Populated areas where more than 50 properties or 500 people live in close
proximity to the area of potential operations and could be affected adversely
by noise, dust or other pollutants.
(g) Areas within which there are already conflicts in terms of ownership, use and
distribution of natural resources.
(h) Areas containing sensitive receptors including proximity to hospitals and
health centres
(i) Applications in areas adjacent to ports and airports where development
activities could adversely affect operation of these facilities.
(j) Areas within or adjacent to important tourism resorts or tourism assets
Table 2 EPA Determination of the Class of EIA required based on the nature
and scale of planned operations
The class of assessment is guided by the aggregate score generated by the
Agency’s review of the applicant’s screening application. A total score for an
application is established by summing individual scores from tables 3 and 4 in the
Second Schedule.
Agency staff will be guided by the applicant’s own assessment of the severity of
any potential Impact but may alter the weight / score at their discretion where they
have reason to believe that the effects of the project may be more or less significant.
Any alteration in the score allocated to individual topics shall be highlighted on a
copy of the screening application and forwarded to the applicant with the EPAs
screening decision.
84 85
The Agency shall exercise its discretion in terms of the categorisation of
applications and is not bound by the absolute scores set out in the table below
which provide guidance only.
Category Physical Social and Economic Type of Assessment
Environment Score Score Likely to be required
A Over 150 Over 20 EIA and SIA
B 130-150 5-20 EIA (including SIA)
C 50-130 Under 5 ESHIA
D Under 50 0 Code of Practice
Table 3
Indication of the application of scores to broad categories of assessment
3. Physical Environment (Mark the relevant sections with an X)
3.1 Land Surface
Description 1 2 3 4 5
Less than 1 to 10 10 hectares 1 to 100 More than
1 hectare hectares to 1 km2 km2 100 km2
Surface area of land
affected by surface
disturbance with
machinery or excavations
Area of vegetation to be cleared
Area of farmland affected
3.2 Land Excavation
If the operations involve Less than 10m3 to- 100m3 to 1 million to More than
excavation what quantity 10 m3 100m3 1 million m3 100 million m3 100 million
of material will be moved? m3
What is likely to be the Less than 3 to 15 feet 15-30 feet 30 to 150 feet More than
maximum depth of 3 feet (1-5 metres) (5-10 metres) (10-50 metres) 150 feet
excavation from (1 metre) (>50 metres)
existing surface
level
Ratio of overburden to 0:1 1:1 Between 1:1 Between 5:1 More than
mineral ore recovery and 5:1 and 20:1 20:1
3.3 Water
Description
Less than 100 to 1000 to 50,000 to Over
100 m3 1000m3 50,000m3 100,000m3 100,000 m3
Volume of water to be
abstracted by gravity or
pumping from a natural or
artificially constructed
water course or water body
(maximum over one month)
Volume of water to be stored
in tanks/settling ponds or
other artificial storage areas
Volume of waste water
(including drilling mud)
to be produced
(maximum over one month)
creating a dam or impoundment
on any watercourse, or
dredging operations?
diverting an existing water
course?
86 87
3.4 Wildlife and Nature Conservation
Does the application area N o Yes
include any official protected
area?
Has an ecological survey been Yes N o
undertaken by a qualified
biologist?
Are any rare or endangered N o Yes
species of plants or animals
found within the application
area as listed in national or
international registers?
In the applicants’ opinion Not at all Very slight Some minor Moderate Major
will the operations affect wild effects adverse adverse adverse
life and nature conservation impacts impacts impacts
in the application area? which can which can
be mitigated be mitigated
3.5 Natural Resources
Will the operation require N o Yes
the use of local timber, stone,
clay or other building materials
3.6 Infrastructure
Do existing tracks and roads footpaths Minor Dirt/ Un-surfaced Regional
lie within the application tracks graveled District Roads and Paved
area? feeder roads Roads
Will any tracks and roads footpaths Minor Dirt/ Un-surfaced Regional
be used by mineral traffic? tracks gravelled District Roads and Paved
feeder roads Roads
How many truck movements Less than 3 3 to 10 10 to 20 20 to 50 More than 50
of over 3 tonnes capacity
will use public roads in an
average month?
diversion or construction metres to 1 Km 10 kms 10 kms
of new roads?
diversion or construction of metres to 1 Km 10 kms 10 kms
new railways?
Does the project involve the N o Yes Yes
use of existing ports or the (existing ports) (new ports)
construction of new ports?
Does the project involve the
use of air transport from
existing or new airports? N o Yes Yes
(existing airports) (new airport)
3.7 Energy
Will the proponent provide Yes N o
all energy requirements from
the company’s own resources?
What is the estimated annual Less than 5000 - 50,000 to 100,000 kw More than
electricity requirement of the 5000 kw 50,000 kw 100,000 kw to 1 mw 1 mw
operations?
What is the estimated annual Less than 50,000 to 100,000 to 500,000 to More than
requirement of the operations 50,000 litres 100,000 litres 500,000 litres 1 million litres 1 million
with respect to diesel oil and litres
other petroleum products?
3.8 Buildings, Structures and Processing Plant
Will the operations include Temporary Permanent Permanent Permanent Permanent
erection of buildings and buildings buildings/ buildings/ buildings/ buildings/
structures/plant? and structures structures structures structures structures
erected for covering covering covering covering
<5 years less than 100m2 to 500m2 to more than
100m2 500m2 1000m2 1000m2
88 89
.
3.9 Emissions & Waste
Will the operations generate N o Yes
solid waste requiring
disposal through land fill?
Will the operations involve N o Yes
processes giving rise to
gaseous emissions
potential to generate dust
which would impact on
local inhabitants?
potential to generate noise
which could adversely affect
local inhabitants?
Will the operations require the N o Yes
use of chemicals and reagents
in on-site processes
Will the operations pose any form N o Yes
of risk to humans from potential
accidents and the creation of
hazards (e.g. deep bodies of
water/rock falls)
Will the operations create N o Yes
unsightly visual impacts
affecting the setting of villages
or towns?
If the answers to any of the above questions on emissions are “Yes”, provide summary details on the scale and
nature of the potential effects.
Table 4Review of the Applicant’s Assessment of the scale and likely effects of
the mining activities on the local economy and social conditions within the area of
mining operations
4.1 Resettlement
Will the operations N o Yes
require resettlement
of people?
If the answer to the question above is YES then score the assessment of effects as shown
below:-
Description /Impact Not at all Very slight Some minor Moderate Major
Will the operations affect effects adverse adverse adverse
directly or indirectly existing impacts impacts impacts
settlement(s): which can which can
be mitigated be mitigated
Complete only one of
the following
with more than 500 houses? 0 25 30 35 40
with 100-500 houses? 20 25 30 35
with 50 -100 houses? 15 20 25 30
with 25 50 houses? 10 15 20 25
With fewer than 25 houses? 5 10 15 20
Where the answer to the above questions on settlements and properties is “Yes” provide details on the estimated
number of properties and individuals involved
90 91
4.2 Effects on current land use activities
Will the operations displace Not at all Very slight Some minor Moderate Major
or reduce the viability effects adverse adverse adverse
of existing land uses for: impacts impacts impacts
which can which can
be mitigated be mitigated
Agriculture
Forestry
Rural livelihoods
(collecting roots/
fruits/ honey etc.)
Tourism
Will the operations affect:
Monuments/archaeological sites
Sacred groves
Burial areas
FOURTH SCHEDULE - PREPARATION OF A SCOPING REPORT
(REGULATION 14 (1) )
1. Content of the Scoping Report
In accordance with Regulation 15, the applicant for an environmental licence shall
prepare and submit a Scoping Report to the Agency before commencing detailed
investigations as part of an environmental impact assessment for a Category A or
B Project.
The Scoping Report will typically consist of a document, 20 to 60 pages in length
and will cover the following information:
CONTEXT
1.1 Name of the project
1.2 Particulars of the applicant for an Environmental Licence
1.3 Information on the environmental firm engaged to work
on the EIA
Including where relevant, information on individual experts who are
engaged to work on specific aspects of the assessment
1.4 A Description of the Project Proposals
(a) Site Area
(b) Nature of the project (exploration, pre-feasibility study,
feasibility study, small-scale mining, large scale mining)
(c) Timescale of operations
1.5 Environmental Baseline Conditions
This shall include the following:
(1) Topography and relief
(2) Climatic conditions,
92 93
(3) Air quality
(4) Water and drainage
(5) Geology and soils
(6) Flora and fauna
(7) Landscape character and quality
(8) Human settlement
(9) Land use
1.6 Potential Areas of Environmental Impact
A one paragraph description of the potential areas of environmental impact that
could arise during each phase of the planned activity in relation to each of the
environmental topics described in the baseline.
1.7 Scope for Avoiding, Mitigating or Compensating for Potential Adverse
Environmental Impacts
A one paragraph statement on the scope for minimizing significant environmental
impacts in relation to each of the environmental topics described in the environmental
baseline.
1.8 Programme of Work
This shall contain a summary of investigations to be undertaken in relation to each
area of potential environmental impact.
FIFTH SCHEDULE–EIAT STANDARDS FOR CATEGORYA AND B
PROJECTS (REGULATION 15 (1) (e))
These standards provide generic Terms of Reference (ToRs) for the preparation of
EIAs for Category A and B mining activities.
Applicants for Environmental Licences shall adapt the ToRs to meet the specific
characteristics of their development project and the environmental and social
conditions in the project area.
1. General Provisions for an Environmental Impact Assessment Report
The Environmental Impact Assessment report records the findings of exhaustive
studies undertaken as part of the assessment process. The principal findings shall
be included in the main report, supported by a stand-alone Non-Technical Summary.
Background information, detailed maps and statistical data may be added as
appendices or set out in separate volumes.
(1) Applicants shall ensure that all aspects of the bio-physical environment are
addressed when applying for an exploratory, small scale or large scale mining
project.
(2) The EIA shall contain a section on methodology and give a clear statement
about the processes of public consultation that has been employed.
(3) The EIA shall contain a chapter outlining the characteristics of the planned
activity and the physical development of infrastructure and these features
shall be clearly shown on a map of appropriate scale.
(4) A description of the current baseline conditions and likely trends in the
absence of the planned development shall be provided.
(5) Potential environmental impacts shall be identified in relation to topography,
geology, soils, land use, flora and fauna, water, drainage, climate, air, human
beings (unless covered in a separate Social Impact Assessment), and the
interactions between these topics.
94 95
(6) Impacts shall be described in terms of potential scale, magnitude,
significance, for example, major, minor and likely duration, for example, short
term, medium term, long term and reversibility or irreversibility.
(7) Any economic or physical alternatives to the proposed form of development.
(8) A Non-Technical Summary written in plain English such that a layman would
be able to understand.
2. Content of the EIA Report
The Environmental Impact Assessment report shall include the following:
I CONTEXT
1.1 Name of the project
1.2 Particulars of the applicant for an Environmental Licence
1.3 Information on the environmental firm that produced the EIA
Identity document/registration details:
II TABLE OF CONTENTS
This section shall contain an index of the EIA.
III EXECUTIVE SUMMARY
The executive summary shall be written in plain English and in a form that is
accessible to all potentially affected parties. It shall include summarized information
on the following:
(1) Project description
(2) Environmental impacts of the project
(3) Environmental management plan, monitoring plan and closure plan
(4) Public participation plan
IV INTRODUCTION
(1) Brief history of the project
(2) Other mining projects under the applicant’s control that are planned or in
progress in the same area
(3) Other associated projects
(4) Previous environmental management instruments
(5) Benefits of the project (locally and regionally)
(6) Legal framework
(7) Methodology adopted for the environmental assessments (to be
expanded, as necessary, in technical appendices for individual specialist
topics; e.g. measuring air pollution).
V DESCRIPTION OF THE PROJECT
The description of the project shall contain the following information as applicable:
5.1 General information on the project
(1) Type of mining activity (exploration, artisanal mining, small scale mining,
large scale mining, dredging mining, radioactive substances mining and
sand miningetc.)
(2) Project location (district, chiefdom, village, section)
(3) Blocks that comprise the project area, indicating UTM coordinates
96 97
(4) The extent of the project area in hectares
(5) Minerals to be explored or produced
(6) Proven and probable mineral reserves
(7) Estimated production
(8) Estimated productive life of the mine
(9) Phases of the project and chronogram
(10) Duration of the project
(11) Estimated date for the beginning of operations
(12) Workforce (permanent and temporary workers)
(13) Total investment and financial sources
5.2 Works and logistics
(1) Earthwork (volume of soil to be moved)
(2) Volume of water required and water sources (for mining purposes and
domestic and human consumption)
(3) Water and wastewater treatment plants
(4) Natural resources demand (timber, flora and fauna, etc.)
(5) Waste rock deposits
(6) Electricity requirements and sources
(7) Power plants
(8) Fuel supply and storage
(9) Mineral transportation system
(10) Buildings, camps, other facilities
(11) Equipment and machinery
(12) Roads to be constructed in kilometres
(13) Port facilities
5.2.1 Specific information for exploration projects
(1) Exploration plan and method
(2) Exploratory boreholes and drilling techniques
5.2.2 Specific information for mining projects
(1) Mining plan and method
(2) Excavation, open pit, underground mining, placer
(3) Mine development
(4) Type of explosives to be used
5.2.3 Specific information for beneficiation projects
(1) Mineral processing and metallurgy methods
(2) Beneficiation plants and associated facilities (crusher, grinder, mill,
concentrator, leaching pads, smelter, refinery, conveyors, cable cars,
pipelines, tailings dam, reservoirs, etc.)
(3) Ore and concentrates storing facilities
5.3 Permits
(1) Permits required (i.e. water use, effluent treatment)
(2) Permits obtained
(3) Private agreements (i.e. easements, land leasing)
5.4 Maps
(1) Location map (1/25,000) depicting the following:
(a) Project area and area of influence
(b) Topography and relief
(c) Access roads
(d) Urban areas and areas of urban expansion
98 99
(e) Populated rural areas
(f) Agriculture areas, cultivated areas, and areas with agricultural potential
(g) Protected areas
(h) Water bodies, wetlands, forests
(2) Land use map (1/500 or 1/1000) depicting the following:
(a) Water supply and sewerage network
(b) Electric power supply network
(c) Site facilities layout (comprises any construction or works that modifies
the preoperational landscape such as tunnels, open pits, plants, buildings, camps,
roads, waste rock dumps, tailing channels, tailing dams, slag deposits, mineral
transportation, etc.)
(d) Land owned by the applicant
(e) Land owned by third parties
(3) Geology mapand geology report
VI BASELINE
This Section describes the characteristics of the environment in the project area
and area of influence before the implementation of the proposed project.
6.1 Physical environment
(1) Climate and meteorology (atmospheric conditions, temperature, humidity,
rainfall, winds, storms, barometric pressure, etc.)
(2) Topography, geology, geomorphology, stratigraphy, geochemistry
(3) Hydrography, hydrology, hydrogeology, hydraulic balance
(4) Land use capacity
(5) Air, soil, water and ground quality
6.2 Biological environment
(1) Biological diversity
(2) Flora and fauna (terrestrial and aquatic) distribution, conservation status,
endemic species, and endangered species
(3) Fragile ecosystems (deserts, mountains, wetlands, forests, other.)
(4) Protected areas and buffering zones
(5) Scenic beauties
6.3 Social environment
(1) Demographic indicators
(2) Population distribution
(3) Social organization
(4) Ethnic groups
(5) Public health
(6) Economy and labour
(7) Goods and services
(8) Residential location
(9) Land ownership and use
(10) Use of natural resources
(11) Recreation
(12) Utilities and services
(13) Transportation services
(14) Quality of life indicators
(15) Cultural heritage
(16) Areas of historical, cultural or scientific interest
(17) Vulnerability
100 101
6.4 Areas already disturbed
(1) Areas already disturbed by previous mining activities
(2) Areas already disturbed by other previous activities
(3) Current third party’s activities disturbing the area
(4) Other elements that represent a menace to the conservation of natural
habitats and ecosystems
VII ENVIRONMENTAL IMPACT
In this Section the applicant shall describe possible significant environmental
impacts of the project if implemented. The description shall refer to each phase of
the project (exploration, construction, operation, closure and post-closure) and
shall indicate the affected environmental element and the action that caused the
impact.
Significant impacts shall be determined based on the analysis of the impact’s
characteristics: nature, extent, timing, probability, reversibility, duration and
magnitude.
7.1 Exploration
7.2 Construction phase
7.3 Operational phase
and 6.3above.
7.4 Closure phase
Describe remaining impacts after implementing the environmental management
plan.
7.5 Post-closure phase
Describe potential impacts from a closed operation. These impacts may comprise
amongst others, acid drainage, long-term stability of ground or closed tailing dams.
VIII ENVIRONMENTAL MANAGEMENT PLAN
This Section summarises the measures and actions to be taken by the applicant
during each phase of the project to avoid, mitigate or compensate each significant
environmental impact identified in Section VI of this document. This information is
included in the stand-alone Environmental Management Plan (EMP) and includes
a budget for all works. Further guidance on the preparation of the Environmental
Management Plan is given in the Tenth Schedule.
The set of measures which are proposed for control of environmental impacts
during each phase of the project (preventive measures, mitigation and
compensation) shall be summarized in a table as illustrated below.
Phase Environmental Preventive Mitigation Compensation
impact
Construction Oil spill into a river Immediate clean
up measures:
application of
oil dispersant and
oil capture
Operation Ground water Installation of
pollution from geomembrane
tailings pond. underneath soil liner
Closure Environmental Construction of
alteration due to artificial lagoon
open pit not suitable by filling the pit
for restoration to with water, in benefit
original topography of migratory birds
and recreational
activities for the
community
IX ENVIRONMENTAL CONTINGENCY PLAN
This Section shall contain an Environmental Risk Assessment (ERA) and an
Environmental Contingency Plan (ECP).
102 103
The ERA analyses the probability of an extreme accidental or natural event causing
significant adverse effects on the environment and human health within the project
area and/or in the project’s area of influence. The ERA shall determine the likelihood
of the event and the magnitude of the consequences.
The ECP shall establish control measures to be applied in case of the occurrence of
emergency situations detailed in an ERA.
X MONITORING PLAN
This Section describes the proposed plan for assessing the effectiveness of
environmental control measures (preventive measures, mitigation and
compensation) set forth in the EMP. It shall refer to environmental standards
approved by law or, if such laws are not provided, to internationally acceptable
standards.
The Monitoring Plan shall indicate the following;
(1) Environmental aspects to be monitored
(2) Monitoring and inspection methodology
(3) Inspection frequency
(4) Location of monitoring stations
(5) Reporting schedules
(6) Equipment and supplies
(7) Administration
(8) Technical team
XI CLOSURE PLAN
This Section describes the closure plan for mining operations at a conceptual
level. The Conceptual Closure Plan will form the basis for developing a
comprehensive Closure Plan as required in Section 47 of these Regulations and the
standards in the Ninth Schedule.
The Closure Plan shall comprise decommissioning and rehabilitation of all
components of the mining operations (exploration roads, boreholes, mine pits,
waste dumps, plant sites, etc.), during each phase of the project, including
progressive or concurrent reclamation, closure and post-closure measures.
The Closure Plan shall describe the intended plans for the post-mining sustainable
use of the project area.
XII COMMUNICATION AND PUBLIC PARTICIPATION PLAN
A communications plan shall be developed to manage public participation and the
participation of stakeholders in the process of project planning, identification of
environmental and social impacts, follow-up and monitoring. It shall indicate how
public consultation is to be conducted (public hearings, workshops, media, etc.),
how the community’s principal concerns about the project will be identified and
how these will be managed by the applicant.
XIII ANALYSIS OF ALTERNATIVES TO THE PROPOSED PROJECT
This Section describes other alternatives to the project (such as different location,
alternative mining methodologies, substitutes to target minerals, etc.) and explains
why the project design is the best in terms of environmental protection and social
development.
SIXTH SCHEDULE - SIA STANDARDS (REGULATION 15 (1) (b))
1. SIA General Principles
The Social Impact Assessment shall be carried out in accordance with the following
principles -
(1) the mineral right holder shall ensure compliance with all human rights treaties
to which Sierra Leone is a party at any time;
(2) the diversity of interests and cultures of the many different social actors
involved in, and affected by, mining and mining related activities shall be
duly acknowledged and respected;
(3) every effort shall be made to protect local cultures and traditions;
104 105
(4) assessment of the social dimension of mining and mining shall be designed
to help identify the best project options and alternatives, to minimise
negative social impacts and to identify sustainable development
opportunities;
(5) strong emphasis shall be placed on engaging local knowledge and
experience; these resources combined with expert judgment, are fundamental
inputs for enhancing project planning and decision-making processes;
(6) the mining project shall recognize that development of social and human
capital is of primary importance when engaging communities in sustainable
development projects and knowledge transfer from skilled to un-skilled
workers shall play a major role in company employment policies;
(7) every effort shall be made by the applicant to recruit workers and retain the
services of local enterprises from the local community and/or the Primary
Host Community,
(8) materials, food and other resources shall be sourced from the local
communities,
(9) the holder of a mineral right shall engage social and economic experts
periodically throughout the mine life cycle to monitor compliance with its
social and environmental obligations; and
(10) if, under the best scientific advice and feasible mitigation measures it is
concluded that a planned intervention poses considerable threats to the
health or survival of a community that intervention shall not proceed.
2. General Provisions on Social Impact Assessment
Applicants shall apply the same principles on Social Impact Assessment to all
levels of assessment from exploratory and small scale mining to large scale mining.
(1) The SIA shall contain a section on methodology and give a clear statement
about the processes of public consultation and public participation that
have been employed.
(2) The SIA shall contain a socio-economic and cultural overview of the locality
(3) The SIA shall include a baseline description and identify and assess potential
social impacts on land, property, labour requirements, the work force and
other social aspects of the proposals.
(4) The SIA shall contain a map identifying all human settlements, including
villages and towns within their respective chiefdom jurisdictions.
(5) The SIA shall include a chapter setting out a Social Impact Management
Plan (SIMP) with measures designed to prevent, mitigate or compensate for
social impacts. Furthermore, monitoring activities, timeframes and estimated
costs shall be included in the SIMP.
3. Scoping Study and Report
(1) Following confirmation from the Agency that a Social Impact Assessment
is required for a Category A or B Mining Project, the applicant will undertake
a scoping study and prepare a scoping report.
(2) The scoping study will examine:
(a) The basic social characteristics of the proposed licence area and
its surroundings;
(b) Any specific local language requirements to ensure that all public
participation and public consultation processes reach affected
communities;
(c) The main economic activities, in addition to mining, that is taking
place or are being promoted within the region.
(d) The main requirements of the project for skilled and unskilled
labour, materials and services that could be provided from the
local communities.
(e) A preliminary assessment of the likely range of adverse and
beneficial social impacts.
106 107
(f) Requirements for negotiations over land and other natural
resources.
(3) The findings of the scoping study will be written up in a report not exceeding
60 A4 sides of paper.
(4) The Scoping Report will be submitted to the Agency and any
recommendations from the Agency will be carefully considered and
incorporated as appropriate in a final document.
(5) The Final Scoping Report shall be published on the Company’s website
(where this exists) and copies shall be provided to the District Authorities
and Chiefdoms’ administrative offices for public display and access.
4. Non-Technical Project Brief
The applicant for an environmental licence shall prepare a Non-Technical Project
Brief which summarises the essential characteristics of the planned project in terms
of the likely area of land required, the nature of the mine site in terms of area and
depth, the type of extraction process envisaged, options for disposing of rock,
sand and tailings waste, the type of buildings and structures to be erected, and the
quantities of materials and means of transportation for transferring mine products
for further processing or to ultimate markets.
The non-technical project brief shall be published and copies provided to the
District Authorities and Chiefdoms’ administrative offices for public display and
access.
5. Formation of Community Liaison Committee
A community liaison committee shall be formed in accordance with Section 5 of
these Regulations as soon as it becomes apparent to the applicant that the project
is likely to involve negotiations with the local community and Primary Host
Community over any aspect of social cultural and local economic activities. This
need is certain to arise with large scale mining and will also apply to most small
scale mining projects.
6. Public Participation and Consultation
The applicant shall arrange for full public disclosure of the Scoping Report and
Non-Technical Project Brief. In addition a communications plan shall be prepared
and followed in accordance with the First Schedule.
7. Stakeholder participation
When undertaking the analysis of social and local economic issues the applicant
shall actively engage local stakeholders including village communities, individuals
and local enterprises such as agricultural cooperatives, education, gender and
youth empowerment groups, market traders and educational, health and social
workers. A full list of stakeholders’ names, positions and contact details shall be
kept by the applicant and published in the draft SIA report.
8. Undertaking the Social Impact Assessment
The process of undertaking the Social Impact Assessment shall include:
(1) identifying, analyzing, managing, and monitoring the negative and
positive, intended and unintended consequences of reconnaissance,
exploration, small-scale, and large-scale mining operations, and any kind
of social and cultural change that these interventions may generate;
(2) a public consultation process through which to identify, analyse, manage,
and monitor potential social impacts;
(3) a participatory processes with the aim of strengthening the role of women,
youth, and marginalized segments of society in development planning,
bringing about higher levels of social inclusion and a more equitable
distribution of benefits.
(4) a strategy identifying how the applicant plans to obtain the community’s
support for the project and strengthen ties with it throughout the entire
life of the project, including preparing the community for closure and
post-closure phases.
9. Draft SIA report
The results of the social and local economic analysis shall be written up in a draft
108 109
Social Impact Assessment and submitted for comment to the Agency. The draft
findings shall also be presented to the stakeholders identified in (7) above.
10. Review by the Environment Protection Agency
Following review by the Agency and, where appropriate, by the Resettlement
Committee, the applicant shall revise the draft SIA report to take account of these
views.
11. Publication of the Social Impact Assessment Report
The Company shall make the findings of the SIA public by making them available
for the public to review through a variety of medium which may include periodic
radio broadcasts, publication at local town halls, community halls and/or public
notice boards, adjourning meetings with local communities and dissemination
amongst local civil society groups, as appropriate.
12. Components of SIA Report
A Social Impact Assessment Report shall include the following:
(1) Social baseline description
(2) Potential impacts and analysing alternatives
(3) Maximising development opportunities and mitigation of negative
impacts
(4) Benefit and Impact plan
(5) Monitoring Plan
(6) Evaluation Plan
13. Content of the SIA Report
The Social Impact Assessment Report shall include the following:
I CONTEXT
1.1 Name of the project
1.2 Particulars of the applicant for an Environmental Licence
1.3 Information on the Social Impact assessors and company that produced
the EIA
II PREAMBLE AND TABLE OF CONTENTS
The preamble shall provide:
(1) Acknowledgements: identifying the principal contributors and
stakeholders who have rendered assistance to the assessment team.
(2) Key sources of information
(3) Definitions and abbreviations. Defines all words, expressions and
abbreviations that a layperson cannot be expected to know.
110 111
The contents list shall contain an index of the SIA.
III EXECUTIVE SUMMARY
Discusses significant findings and recommended actions in a non-technical
language (layperson’s language). It shall include summarized information on the
following:
(1) Project description
(2) Social and local economic impacts of the project
(3) Social impact management plan, social monitoring plan and social
components of the mine closure plan
(4) Public participation plan
IV INTRODUCTION
(1) Brief history of the project
(2) Other mining projects under the applicant’s control that are planned or in
progress in the same area
(3) Other associated projects
(4) Previous environmental management instruments
(5) Benefits of the project (locally and regionally)
(6) Legal framework
(7) Methodology adopted for the social impact assessments (to be expanded,
as necessary in technical appendices for individual specialist topics).
V POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK
This chapter discusses the policy, legal and administrative framework within which
the SIA is carried out, including relevant international agreements to which Sierra
Leone is a party.
VI DESCRIPTION OF THE PROJECT
This chapter summarises the proposed project and its geographical, social and
temporal context, including any off-site developments that may be required (e.g.
access roads, power plants, water supply, housing, storage facilities). Relevant
maps are to be included showing the project site and area of influence.
The description of the project shall contain the following information as applicable:
6.1 General information on the project
(1) Type of mining activity (exploration, artisanal mining, small scale mining,
large scale mining, dredging mining, radioactive substances mining)
(2) Project location (district, chiefdom, village, section)
(3) Blocks that comprise the project area, indicating UTM coordinates
(4) The extent of the project area (hectares)
(5) Minerals to be explored or produced
(6) Proven and probable mineral reserves
(7) Estimated production
(8) Estimated productive life of the mine
(9) Phases of the project and chronogram
(10) Duration of the project
(11) Estimated date for the beginning of operations
(12) Workforce (permanent and temporary workers)
(13) Total investment and financial sources
112 113
6.2 Permits
(1) Permits required (i.e. water use, effluent treatment)
(2) Permits obtained
(3) Private agreements (i.e. easements, land leasing)
6.3 Maps
(1) Location map (1/25,000) depicting the following:
(a) Area and area of influence
(b) Topography and relief
(c) Access roads
(d) Urban areas and areas of urban expansion
(e) Populated rural areas
(f) Agriculture areas, cultivated areas, and areas with agricultural
potential
(g) Protected areas
(h) Water bodies, wetlands, forests
(1) Land use map (1/25000) depicting the following:
(a) Water supply and sewerage network
(b) Electric power supply network
(c) Site facilities layout
(d) Land owned by the applicant
(e) Land owned by third parties
VII SOCIAL BASELINE
This Section describes relevant social and economic conditions in local communities,
the region and Sierra Leone at large, including any changes anticipated before the
project commences. Quantitative parameters are provided where possible.
7.1 Demographic Indicators
(1) Population number, density and distribution
(2) Population age profile
(3) Male/Female ratios
(4) Children under 18
(5) Average life expectancy
(6) Population growth
(7) Migration
(8) Fertility rates
7.2 Community and Social Organisation
(1) Role of Chiefdoms
(2) Local authority structure, powers, capabilities
(3) Informal administration structures
(4) Cultural diversity, ethnic groupings and religion
(5) Local customs and taboos
(6) Vulnerable and disadvantaged groups
114 115
7.3 Housing
(1) Housing stock
(2) Housing condition
(3) Housing demand
7.4 Education
(1) Child Education
(2) Youth education and training
(3) Adult education and training
7.5 Public Health
(1) Mortality rates
(2) Morbidity rates
(3) Maternal welfare (pre/post natal)
(4) Infectious diseases
(5) Nutrition levels
(6) HIV/AIDs
7.6 Economy and Livelihoods
(1) Economic structure
(2) Livelihoods
(3) Business Enterprises
(4) Employment
(5) Unemployment
(6) Goods and services
(7) Market trading
7.7 Land ownership and use
7.8 Use of natural resources
7.9 Utilities and services
7.10 Intangible Assets
(1) Quality of life indicators
(2) Cultural heritage
(3) Areas of historical, cultural or scientific interest
VIII SOCIAL AND LOCAL ECONOMIC IMPACT
In this Section the applicant shall describe possible significant socio-economic
impacts of the project if implemented. The description shall refer to each phase of
the project (exploration, construction, operation, closure and post-closure),
indicating the affected socio-economic element and the action that caused the
impact. The assessment of socio-economic impacts shall take into account relevant
local, regional or national development plans.
Significant impacts shall be determined based on the analysis of the impact’s
characteristics: nature, extent, timing, probability, reversibility, duration and
magnitude.
8.1 Exploration
8.2 Construction phase
8.3 Operational phase
116 117
8.4 Closure phase
Describe remaining impacts after implementing the environmental management
plan.
8.5 Post-closure phase
Describe potential impacts from a closed operation. These impacts may comprise
acid drainage, long-term stability of ground or closed tailing dams, among others.
IX SOCIAL IMPACT MANAGEMENT PLAN
This Section describes the set of measures and actions to be taken by the proponent
during each phase of the project to avoid, mitigate or compensate each significant
socio-economic impact identified in Part VII of this Schedule. The Social Impact
Management Plan (SMP) shall include a budget. Further guidance on the preparation
of a social impact management plan is given in the Eleventh Schedule.
The set of proposed measures to control environmental impacts for each phase of
the project (preventive measures, mitigation and compensation) shall be summarized
in the table below (see example in Italics
Phase Socio-Economic Preventive Mitigation Compensation
impact
Construction
Operation
Closure
X COMMUNITY DEVELOPMENT PLAN
The Social Impact Assessment shall include a chapter which summarises the state
of negotiations between the applicant for an environmental licence and the Primary
Host Community being undertaken in accordance with Section 140 of the Mines
and Minerals Act 2009. An outline of the content and main proposals of the
Community Development Plan shall be included together with the programme for
finalizing this document and, where appropriate, arrangements for entering into a
Community Development Agreement.
XI SOCIO-ECONOMIC CONTINGENCY PLAN
This Section shall contain a Social and Economic Risk Assessment (SERA) and a
Socio-Economic Contingency Plan (SECP).
The SERA analyses the possibility of an extreme accidental or natural event causing
significant adverse effects on the social fabric and human health within the project
area and/or in the project’s area of influence. The SERA shall determine the event
likelihood and the magnitude of the consequences.
The SECP shall establish control measures to be applied in case of emergency
situations described in the SERA.
XII SOCIO-ECONOMIC AND HEALTH MONITORING PLAN
This Section describes the proposed plan for assessing the effectiveness of socioeconomic and health control measures (preventive measures, mitigation and
compensation) set forth in the SIMP. It shall refer to socio-economic and health
standards and standards approved by law or, in the absence of such laws, to
internationally acceptable standards.
The Monitoring Plan shall indicate the following;
(1) Socio-economic and health aspects to be monitored
(2) Monitoring and inspection methodology
(3) Inspection frequency
(4) Location of monitoring stations
(5) Reporting schedules
(6) Equipment and supplies
(7) Administration
(8) Technical team
118 119
The Evaluation of monitoring results will form a key output from the socio-economic
and health monitoring plan. The results shall be carefully considered by the
environmental licence holder and acted upon in implementing the social impact
management plan.
XIII SOCIAL AND ECONOMIC COMPONENTS OF THE CLOSURE
PLAN
This Section describes the mine closure plan for mining operations at a conceptual
level. The Conceptual Closure Plan will form the basis for developing a
comprehensive Mine Closure Plan as required in Section 47 of these Regulations
and described in more detail in the Ninth Schedule.
The Mine Closure Plan shall comprise decommissioning and rehabilitation of all
components of the mining operations (exploration roads, boreholes, mine pits,
waste dumps, plant sites, etc.), during each phase of the project, including
progressive or concurrent reclamation, closure and post-closure measures.
The Mine Closure Plan shall describe the intended post-mining sustainable use of
the project area.
XIV COMMUNICATIONS AND PUBLIC PARTICIPATION PLAN
The Communications and Public Participation Plan shall describe the participation
of stakeholders in the process of project planning, identification of environmental
and social impacts, follow-up and monitoring. It shall indicate what are the means
for public consultation to be used (public hearings, workshops, media, etc.), what
the community’s principal concerns about the project are and how these plan to be
managed by the proponent.
XV ANALYSIS OF ALTERNATIVES TO THE PROPOSED PROJECT
This Section describes other alternatives to the project (such as different location,
alternative mining methodologies, substitutes to target minerals, etc.) and indicates
how the community and surrounding district would possibly develop if the project
is not realized, for example, in terms of potential social impacts; and reasons why
these alternatives have not been chosen.
SEVENTH SCHEDULE–ESIA STANDARDS (REGULATION 15 (1) (C))
1. Environmental and Social Impact Assessment (ESIA) Procedures
These standards set out the procedures for conducting a simplified form of
environmental, social and health impact assessment for those Category C projects
identified in Regulation 13 that do not require a comprehensive Environmental
Impact Assessment or Social Impact Assessment.
The Regulations and these standards recognise that there are some forms of
exploration and small-scale mining activity that are unlikely to have major
environmental, social or health impacts. These operations may typically involve:
(1) extraction of small quantities of ore for bulk sampling during mineral
exploration
(2) small quarries used for the extraction of building stone
(3) small scale sand and gravel pits
Very occasionally, other small scale mining operations may qualify for the simplified
form of assessment if the type of mineral extraction allows for rapid restoration of
worked out areas and there are no important or sensitive environmental habitats or
social issues on the mine site or the surrounding area.
For the avoidance of doubt no large scale mining operations will qualify for simplified
assessment using ESIA.
2. Conduct of an Environmental and Social Impact Assessment
Applicants for a Category C Project Environmental Licence shall undertake a
combined assessment on environmental, social and health issues relating to the
project and prepare a report of not more than 100 pages including appendices.
The work shall be undertaken by assessors who are qualified and competent to
undertake the three core areas of assessment.
3. Content of the EIA Report
The Environmental Impact Assessment Report shall include the following:
120 121
I CONTEXT
1.1 Name of the project
1.2 Particulars of the applicant for an Environmental Licence
1.3 Information on the Environmental firm that produced the EIA
II TABLE OF CONTENTS
This section shall contain an index of the EIA.
III EXECUTIVESUMMARY
The executive summary shall be written in plain English and in a form that is
accessible to all potentially affected parties. It shall include summarized information
on the following:
(1) Project description
(2) Environmental, social and health impacts of the project
(3) Combined environmental, social and health management plan, monitoring
plan and closure plan
(4) Statement on public participation procedures
IV INTRODUCTION
The introduction shall contain the following:
(1) Description of the project
(2) Relationship to other developments under the applicant’s control or
ownership
(3) Benefits of the project
(4) Methodology adopted for the environmental assessments
V DESCRIPTION OF THE PROJECT
The description of the project shall contain the following information as applicable:
5.1 General information on the project
(1) Type of mining activity (exploration, artisanal mining, small scale mining,
large scale mining, dredging mining, radioactive substances mining)
(2) Project location (district, chiefdom, village, section)
(3) Blocks that comprise the project area, indicating UTM coordinates
(4) The extent of the project area (hectares)
(5) Minerals to be explored or produced
(6) Proven and probable mineral reserves
(7) Estimated production
(8) Estimated productive life of the mine
(9) Phases of the project and chronogram
(10) Duration of the project
(11) Estimated date for the beginning of operations
(12) Workforce (permanent and temporary workers)
(13) Total investment and financial sources
122 123
5.2 Works and logistics
(1) Earthwork (volume of soil to be moved)
(2) Volume of water required and water sources (for process, domestic and
human consumption)
(3) Water and wastewater treatment plants
(4) Natural resources demand (timber, flora and fauna, etc.)
(5) Waste rock deposits
(6) Electricity requirements and sources
(7) Power plants
(8) Fuel supply and storage
(9) Mineral transportation system
(10) Buildings, camps, other facilities
(11) Equipment and machinery
(12) Roads to be constructed in kilometres
(13) Port facilities
5.3 Specific information for exploration projects
(1) Exploration plan and method
(2) Exploratory boreholes, drilling techniques
5.4 Specific information for exploration projects
(1) Mining plan and method
(2) Excavation, open pit, underground mining, placer
(3) Mine development
(4) Type of explosives to be used
5.5 Specific information for beneficiation projects
(1) Mineral processing and metallurgy methods
(2) Beneficiation plants and associated facilities (crusher, grinder, mill,
concentrator, leaching pads, smelter, refinery, conveyors, cable cars,
pipelines, tailings dam, reservoirs, etc.)
(3) Ore and concentrates storing facilities
5.6 Permits
(1) Permits required (i.e. water use, effluent treatment)
(2) Permits obtained
(3) Private agreements (i.e. easements, land leasing)
5.7 Maps
Location map (1/25,000) depicting the following:
(1) Project area and area of influence
(2) Topography and relief
(3) Access roads
(4) Urban areas and areas of urban expansion
(5) Populated rural areas
(6) Agriculture areas, cultivated areas, and areas with agricultural potential
(7) Protected areas
(8) Water bodies, wetlands, forests
5.8 Land use map (1/500 or 1/1000) depicting the following:
(1) Water supply and sewerage network
(2) Electric power supply network
124 125
(3) Site facilities layout (comprises any construction or works that modifies
the preoperational landscape such as tunnels, open pits, plants,buildings,
camps, roads, waste rock dumps, tailing channels, tailing dams, slag
deposits, mineral transportation, etc.)
(4) Land owned by the applicant
(5) Land owned by third parties
5.9 Geology map and geology report
VI ENVIRONMENTAL, SOCIAL AND HEALTH BASELINE
This Section describes the characteristics of the environment in the project area
and area of influence under existing conditions (i.e. prior to the project development)
6.1 Physical environment
6.2 Biological environment
6.3 Social, local economic, health and environment
6.4 Areas already disturbed
The content of these sections shall draw on the fuller description of topics to be
covered under an EIA or SIA baseline, where these are relevant to the assessment.
VII POTENTIAL IMPACTS
In this Section the applicant shall describe possible significant environmental,
social and where relevant health impacts of the project if implemented. The
description shall be referred to each phase of the project (exploration, construction,
operation, and closure), indicating the affected environmental element and the
action that caused the impact.
Significant impacts shall be determined based on the analysis of the impact’s
characteristics: nature, extent, timing, probability, reversibility, duration and
magnitude.
VIII INTEGRATED ENVIRONMENTAL AND SOCIAL MANAGEMENT
PLAN
This Section describes the set of measures and actions to be taken by the applicant
during each phase of the project to avoid, mitigate or compensate the environmental
and/or social impacts identified in Section VII. The integrated environmental and
social management plan shall include an indicative budget for all works.
IX ENVIRONMENTAL AND SOCIAL RISKS
A chapter shall be included indicating any potential environmental or social risks
and the measures that will be taken to control such risks.
X INSPECTION AND MONITORING PLAN
A chapter shall be included setting out the measures that are proposed for
monitoring potential sources of environmental pollution and control measures to
avoid, mitigate or compensate for any adverse environmental or social impacts
XI CLOSURE PLAN
A chapter shall be included outlining the steps that will be taken to decommission
the mine and rehabilitate the site on completion of works.
The Mine Closure Plan shall describe the intended post-mining sustainable use of
the project area.
XII STATEMENT ON PUBLIC PARTICIPATION
A section shall be included in the report indicating the steps that have been taken
to consult the local community and the Primary Host Community and the measures
that will be followed to keep stakeholders informed throughout the mine life cycle.
XIII ANALYSIS OF ALTERNATIVES TO THE PROPOSED PROJECT
This Section shall describe other alternatives to the project (such as different
location, alternative mining methodologies, substitutes to target minerals, etc.)
and explain why the project design is the best in terms of environmental protection
and social development.
126 127
EIGHTH SCHEDULE - ENVIRONMENTAL CODE OF PRACTICE
(REGULATIONS 15 (1) (D) AND 55 (2) )
1. Application of the code of practice
This code of practice will be applied by all holders of mineral rights to their operations
in circumstances where:
(1) a declaration has been signed under oath that there will be no adverse
environmental, social or local economic impacts arising from the operations; and
(2) the Agency has issued a decision that an environmental licence is not
required and the code of practice shall apply.
2. Content of The Code of Practice
I. Land Surface
(1) The site(s) of operations shall be protected at all times by fencing or by
constant inspection to ensure that they pose no risk to the local
community and Primary Host Community and in particular children or
other vulnerable groups.
(2) All areas of land affected by the operations shall be reinstated to their
original condition following completion of the operations and such
reinstatement shall include the replacement of soil and reseeding or
replanting of vegetation, or in the case of productive land, re-cultivation
of the land to leave it in a state suitable for the growing of crops.
II. Land Excavation
Any excavation created as part of the operations shall be backfilled with inert
material or regarded to leave smooth free-draining contours with no depressions
or pits that could fill with water.
III. Water
(1) The holder of a mineral right shall ensure that no water supplies are
adversely affected or access to water is impaired by the operations for
any other users in the locality.
(2) In the event that the operations accidently cause a temporary break in
service or supply to any other users in the locality, the mineral right
holder shall provide alternative supplies and meet the full costs of
compensation for disruption of supply.
(3) In the absence of any agreement under (4) below, all pipes, tanks and
other receptacles used for water storage shall be removed on completion
of the operations.
(4) Pipes, tanks and other water storage receptacles may be retained on site
for use by the landowner or local community if this action is authorised
by the Agency following a written request from the holder of a mineral
right.
IV. Wildlife and Nature Conservation
The holder of a mineral right shall ensure that minimum disturbance is caused to
local habitats by the operations.
V. Natural Resources
(1) With the exception of the clearance of vegetation to permit activities to
proceed in accordance with the signed declaration, the operator
undertakes not to fell trees or cut timber or remove any other natural
resources from the site.
(2) The rights of local communities to collect roots, fruits, honey, medicinal
plants, fire wood and any other natural resources in the area shall be
respected.
128 129
VI. Infrastructure & Access
(1) Where any form of mineral traffic, including movement of plant takes
place on public access roads or tracks and the roadways are subject to
wear and tear from this traffic, the operator undertakes to maintain such
roads in a state which is as good as, if not better than it was prior to the
commencement of operations.
(2) Following closure of the operations the operator shall leave all access
roads used by mineral traffic in a condition which is as good as, if not
better than those at the start of operations.
VII. Energy & Fuel
(1) All equipment used for the transport or storage of diesel, oil and other
fuels will be maintained in safe and fully serviceable condition throughout
the life of the operations and shall be removed on completion of the
works.
(2) Areas used for the storage or transfer of diesel, oil and other fuels shall
be protected against accidental spillage with an impermeable membrane
(plastic or equivalent) laid beneath an absorbent surface.
VIII. Buildings, Structures and Processing Plant
(1) All buildings, structures and processing plant shall be maintained in a
safe and secure condition during the operations and will be removed on
completion of the operations, except under condition (2).
(2) Following completion of the operations, buildings may be retained on
site for use by the landowner or local community if this action is
authorised by the Agency following a written request from the holder of
a mineral right.
IX. Emissions & Waste
(1) The holder of a mineral right shall ensure that at all times throughout the
operations, any emissions to air, water or land are kept to an absolute
minimum and at levels that pose no risk whatsoever to the health of
workers, local inhabitants or wildlife.
(2) Drilling mud and all other reagents used in lubricating drill rods and
drilling equipment shall be contained in sealed circulatory systems and
recycled without discharge to the environment.
X. Social Conditions
(1) The holder of a mineral right shall ensure that all aspects of the operations
are controlled to the highest standards and do not give rise to any
disturbance or annoyance to persons living or working in the vicinity of
the operations.
(2) The holder of a mineral right shall be liable for any accidents caused to
members of the local community and/or the Primary Host Community
and in particular children or other vulnerable groups arising within the
area of the operations and shall be obliged to pay full compensation in
the event of injury or death or any individual.
XI. Land use
The holder of a mineral right shall ensure that the operations are conducted in
harmony with all surrounding land uses and shall undertake restitution with full
compensation in the event that any aspect of the operations leads to accidental
damage to neighbouring land uses.
130 131
NINTH SCHEDULE - MINE CLOSURE PLAN STANDARDS
(REGULATIONS 16(A), 33 (7) )
1. Objectives
The aim of these standards is to ensure that for every mining operation in Sierra
Leone a planning process is in place that ensures the mine can be closed,
decommissioned and rehabilitated in an ecologically and socially sustainable
manner consistent with the terms of the environmental licence.
The responsibility for opening, operating and closing a mine rests on the
environmental licence holder and mineral right holder and must be exercised without
unacceptable liability to the state.
Planning for mine closure should be an integral part of mine development and
operations planning. Consequently the level of information required should
correspond to the stage in the mine lifespan.
2. Principles and Approaches towards Mine Closure Planning
At all stages from project approval and licencing onwards, the Mine Closure Plan
should demonstrate that ecologically sustainable approaches can be followed.
Mine closure plans shall be site-specific. “Off the shelf” or generic proposals will
not be permitted.
Closure planning should take account of detailed materials characterization, data
on local environmental conditions and climatic conditions.
Consultation should take place between the mine manager and local communities.
3. Public availability of documents
The applicant shall ensure that all Mine Closure Plans are made public in the Local
Community and the Primary Host Community and shall use a variety of medium
which may include periodic radio broadcasts, publication at local town halls,
community halls and/or public notice boards, adjourning meetings with local
communities and/or dissemination amongst local civil society groups, as
appropriate.
4. Level of Detail required in a Mine Closure Plan
The level of detail provided with each category of project will vary according to the
complexity of the mineral deposit and the expected longevity of the mining
operations. The level of detail required in a Mine Closure Plan for small scale
mining operations will be significantly less than is required for large scale mines.
Table 1 below provides an indication of the information required.
Anticipated Post-mining Identification and Level of Status of Mine
Life of Mine land use Management of Key information Closure Plan
Environmental Issues
Long term in Provisional All high risk Indicative Provisional
excess of 25 targets components
years established identified
Medium term Clear proposals Full risk Well informed Full Plan
(10-25 years) set out assessment presented
provided
Short term up Full definition Full risk Full and Plan and
to 10 years of future uses assessment accurate details detailed
required provided proposals
presented
Small scale Full definition Full risk Full and Plan and
mining of future assessment accurate details detailed
operations uses required provided proposals
presented
Existing Assessed on Assessed on Assessed on Assessed on
operations case-by-case case-by-case case-by-case case-by-case
basis basis basis basis
132 133
5. Details required in a Mine Closure Plan
A Mine Closure Plan must be accompanied by professionally surveyed site plans,
aerial photographs and three dimensional drawings and diagrams.
The suggested content of a MCP is detailed below:
CONTENT
Cover Page:
(1) Title of project
(2) Document title
(3) Document ID number and version number
(4) Date of submission
(5) Environmental Licence number (or application number)
(6) Mineral Rights Licence number (or application number)
(7) Company name
(8) Full contact details
Table of Contents
Section 1 Scope and Purpose of the Mine Closure Plan
Section 2 Project Summary
Covering: land ownership, location of the operations, overview of
the mining operations, comprehensive site plan
Section 3 Identification of closure obligations and commitments
Section 4 Collection and analysis of closure data
Covering environmental data, other closure data and an analysis of
data
Section 5 Results of Stakeholder consultation
Section 6 Post-mining land use and closure objectives
Section 7 Presentation of final land forms in map and graphic (3-D) formats
Section 8 Identification and Management of closure issues
For example:
- Hazardous materials
- Hazardous and unsafe facilities
- Contaminated sites
- Acid and metallic-ferrous drainage
- Radioactivity
- Fibrous materials (asbestos)
- Non-target metals and residues in mine wastes
- Management of mine pit lakes
- Adverse impacts on surface and ground water quality
- Dispersive materials
- Design and maintenance of permanent drainage systems
- Dust emissions
- Rehabilitation of flora and fauna
- Visual amenity
- Heritage issues
Section 9 Completion Criteria, Performance indicators and targets
Section 10 Financial provisions
To cover:
- Earthmoving and landscape forming operations
- Management of hazardous or unstable materials
134 135
- Management of surface water drainage post closure
- Research and trials
- Decommissioning and removal of infrastructure
- Remediation of contaminated areas
- Progressive and final restoration
- Post-closure maintenance and monitoring
- Continuing stakeholder consultations
- Closure project management (administration, specialist consultancy,
legal fees)
- Provision for unexpected closures
- Provision for potential delays and extreme events.
Section 11 Closure Implementation
- Management structure and staffing
- Work plan and programme
- Sources of materials for remedial works
- Pilot processes
Section 12 Closure Monitoring and maintenance
Section 13 Management of date and permanent mine records depository
6. Risk Assessment
In the interests of reducing the risks of failure in achieving full rehabilitation of
worked out mines, the applicant shall carry out a risk assessment and include the
findings in the Mine Closure Plan. The purpose of the risk assessment is to:
- Ensure early identification of potential risks;
- Develop acceptable and realistic criteria to measure performance;
136 137
- Ensure orderly, timely and cost-effective closure outcomes;
- Reduce uncertainty in terms of the scale of closure costs; and
- Ensure application of continual improvements in remedial technology,
the enhancement of the final design and management of drainage, erosion and
seepage controls.
7. Minimum requirements for a Mine Closure Plan
A Mine Closure Plan will be judged incomplete if the answer to any of the following
questions is NO;-
(1) Has the closure plan been prepared specifically for this site?
(2) Is stakeholder consultation fully documented in the plan?
(3) Does the plan clearly indicate how stakeholders’ concerns have been
taken into account?
(4) Has a full environmental and social assessment been undertaken of the
issues involved in closing and rehabilitating the mine?
5) Are workable management measures identified and formally proposed
as part of the mine closure plan for dealing with the issues highlighted in
(4) above,
(6) Is there evidence that experience from other similar sites in Sierra Leone,
or other countries has been taken into account with the lessons learnt
being applied to the mine closure plan?
(7) Does the mine closure plan contain firm proposals for further research
and field trials to support closure proposals?
(8) Is the scope for progressive restoration or rehabilitation fully examined
in the mine closure plan?
(9) If scope exists for progressive restoration or rehabilitation are the
necessary technical and financial provisions made in the plan?
(10) Does the mine closure plan contain a section setting out measures for
dealing with closure and the possibility of temporary closure on a care
and maintenance basis?
138 139
8. Changes to approved Mining Proposals
Any substantial change to an approved mining operations and a mine plan is likely
to result in increases in environmental and social impact. This in turn will necessitate
review of the mine closure plan.
9. Unexpected and Temporary Closure
Mining operations can run into unexpected issues, like the influx of water into the
mine area, or change in economic circumstances that necessitate temporary closure
of the mining operations. If temporary closure becomes necessary this will trigger
requirements for adoption of a Care and Maintenance Plan as set out in the
Seventeenth Schedule of these Regulations. In the case of a temporary closure the
mineral right holder is required carry out all environmental obligations without
interruptions.
10. Existing Mine Operations
Under the Regulations and this Schedule the mine closure plans for all existing
mining operations will need to be reviewed every 2 years
TENTH SCHEDULE - ENVIRONMENTAL MANAGEMENT PLAN
STANDARDS (REGULATION 16(1)(B))
1. Preparation of an Environmental Management Plan
A mineral right holder which is obliged to prepare an EIA shall prepare an
Environmental Management Plan in accordance with Section 110(2)(d) of the Mines
and Minerals Act, 2009.
The Environmental Management Plan must incorporate all of the recommendations
and commitments to environmental protection in terms of avoidance, minimisation
and compensation that are contained in the Environmental Impact Assessment,
together with any additional conditions that are attached to the Environment Licence.
The Environmental Management Plan must include a programme of environmental
works, including timescale, targets and indicative costs.
2. Objectives of the Environmental Management Plan
An environmental management plan sets out the measures and steps that will be
taken by the holder of an environmental licence to avoid, minimise, mitigate or
compensate for adverse environmental effects arising from the mining operation
that are identified in the environmental impact assessment studies and report.
The level of detail will vary according to the stage of mining operation that is being
covered in the environmental license (i.e. exploration, detailed feasibility study or
full scale mining) and the scale of operations (small scale or large scale mining
operations).
An EMP will describe critical environmental values and/or sensitive sites that are
to be protected during the life, closure and post-closure stages of the operations,
in addition to those environmental features that are likely to be directly influenced
or affected.
Specific commitments must be entered into in the plan based on the site assessments
and international best practice in environmental care and proven research. Provisions
for monitoring must be included that are technical and financially achievable and
these shall cover environmental protection objectives, standards, measurable
indicators and control strategies.
Applicants for an environmental licence are strongly advised to consult the Agency
while preparing environmental protection commitments and responses to the
findings of the EIA.
3. Recommended contents of an Environmental Management Plan
Environmental Management Plan for an Environmental Licence for Exploration
CONTENTS
Section 1 Mining project status
Section 2 Description of mining activities
Section 3 Description of environmental values and potential impacts
Section 4 Management measures for each of the following environmental
values, as applicable
140 141
- Air : micro-climate, dust, odours, point source contaminants
- Water: natural watercourses, stream sediments, water quality,
groundwater, dams and containments, sewage effluent quality and
control,
- Noise and vibration
- Wastes: liquids and solids
- Land, landforms, rehabilitation criteria, landform design, gradients relating
to end-uses
- Dams containing hazardous waste
- Infrastructure: roads, power lines, generators
- Vegetation: flora
- Biodiversity: fauna
- Heritage and cultural conservation features
ELEVENTH SCHEDULE - SOCIAL MANAGEMENT PLAN STANDARDS
(REGULATION 16 (C))
1. Status of a social management plan
A social management plan is prepared from the material contained in a social
impact assessment (SIA) environmental and social impact assessment (ESIA) and
contains the measures to prevent, mitigate or compensate for negative social
impacts resulting from mining activities as well as measures to enhance and maximise
development opportunities.
The social management plan sets out the steps and measures that will be taken by
the mineral right holder to deliver all of the social and local economic obligations
that stem from these Regulations in relation to the construction, implementation,
operation and closure of mining activities and operations.
Social obligations covered in the social management plan are separate and distinct
from any wider commitments arising pursuant to negotiations with the host
community in relation to a Community Development Agreement or community
development plan or resulting from a Company’s corporate and social responsibility
policies.
2. Preparing a Social Management Plan
All Category A project applicants are required to prepare a social management
plan. Where it is deemed appropriate, an authorised officer of the Agency or the
Director of Mines may also direct that a Social Management Plan be prepared for a
Category B project.
In accordance with these Regulations, a social management plan must be revised
annually throughout the construction, implementation, operations and closure
stages of a mineral operation. The annually updated SMP shall be submitted to the
Agency within one month of the date of its adoption.
3. Objectives of a social management plan
A social management plan sets out the measures and steps that will be taken by the
holder of an environmental licence to avoid, minimises, mitigate or compensate for
adverse social effects arising from the mining operation that are identified in the
social impact assessment studies and report (or the environmental and social impact
assessment study and report in the case of a Category C Project).
The level of detail will vary according to the stage of mining operation that is being
covered in the environmental license (i.e. exploration, detailed feasibility study or
full scale mining) and the scale of operations (small scale or large scale).
A SMP will describe critical social values and/or sensitive sites that are to be
protected during the life, closure and post-closure stages of the mining operations
in addition to those social and local economic features that are likely to be directly
influenced or affected.
Specific and tailored commitments must be entered into in the plan based on site
assessments, international best practice in social care and proven research. All
monitoring provisions must be technically and financially achievable and must
cover social protection objectives, standards, measurable indicators and control
strategies.
142 143
Applicants for an environmental licence are strongly advised to consult the Agency
while preparing their social protection commitments and responses to the findings
of the SIA or ESIA.
4. Contents of a social management plan
The social management plan will contain, as a minimum, the following criteria:
CONTENTS
Section 1 Mining project status
Section 2 Description of mining activities
Section 3 Description of social and local economic values and any sensitive
sites and potential impacts
Section 4 Management measures for each social and local economic value.
In addition, the social management plan shall include sections detailing the
following:-
(a) references and links to a public consultation and participation
plan;
(b) a grievance or conflict management plan;
(c) timescales and estimated costs for the work; and
(d) provisions for monitoring and evaluating the results, and where
necessary, taking extra measures.
TWELFTH SCHEDULE - COMMUNITY DEVELOPMENT AGREEMENT
AND PLAN STANDARDS (REGULATION 16 (c) (iii))
1. Community development agreement
The holder of a small scale or large scale mining license is required to have and
implement a community development agreement with the host community in
accordance with Section 139(1) of the Mines and Minerals Act 2009.
2. Community development plan
The Community development agreement shall be based on the contents of a
community development plan which in turn sets out how the holder of an
environment licence will implement the findings and recommendations of a social
impact assessment (SIA) or environmental and social impact assessment (ESIA).
The Community Development Plan (CDP) will include;
(1) a participatory framework;
(2) a statement on the company’s policy, procedures and institutional
arrangements necessary to implement sustainable development
opportunities in the Host Community in the social impact assessment or
environmental and social impact assessment and in the social management
plan.
(3) a local employment and procurement strategy that commits the applicant;-
(a) to a policy of utilizing local employment wherever practical during
all stages of mine development; and
(b) to purchasing local materials and products wherever practical.
(4) a gender strategy outlining actions for improving the condition of women
and children within the Host Community who are likely to be affected by
the planned operations.
(5) a community development programme which shall include at least the
following:
(a) objectives,
(b) milestones;
(c) implementation timetable;
(d) schedule of anticipated expenditures;
(e) metrics by which to measure progress;
144 145
(f) periodic reporting including actual expenditures;
(g) how the plan works in coordination with government plans,
services, infrastructure and activities provided to or affecting
the community;
(h) how the provision of any service provided by the mining right
holder to the community will be terminated or transferred to the
community, government or other entity;
(i) how and when the plan will be periodically updated;
(j) how the plan and amendments to the plan will be ratified by the
community; and
(k) such other content as may be mutually agreed by the community
and the mining right holder;
Pursuant of Section 140(1) (c) (iii) of the Mines and Minerals Act 2009,
the Community Development Plan shall also serve to prepare the community for
mine closure with the Mine Closure Plan (MCP) also containing relevant consultation
and participation methodologies to meet that end.
3. Form of the Community Development Agreement
The community development agreement shall be structured around the following
contents list.
CONTENTS LIST
1. Objectives
2. Mining right holder’s obligation to assist in development of communities
3. Capacity to negotiate
4. Recommended content of community development agreement
5. Community development agreements should complement other
agreements and development plans
6. Recommended minimum expenditure
7. Transparency through reporting
8. CDAs and annual reports available to the public
9. Transfer
10. Pre-existing mining rights
4. Objectives of the Standards
The objectives of these standards are:
(1) to enhance the sustainable social, cultural and economic well-being of
communities impacted by mining operations;
(2) to define when community development agreements may be useful and
to provide a suggested framework for such agreements;
(3) to promote accountability and transparency in mining related community
development.
5. Obligations of the Mining Rights Holder
In accordance with Section 138 of the Mines and Minerals Act a mining right
holder is required to assist in the development of communities affected by its
operations to promote sustainable development, enhance the general welfare and
the quality of life of the inhabitants, and recognize and respect the rights, customs,
traditions and religion of local communities.
6. Conduct of negotiations
Where a qualified community lacks the capacity to effectively negotiate a community
development agreement, the mining right holder is obliged to assist to build that
capacity including the provision of such funds to the community for capacitybuilding and preparation as are reasonable in the circumstances.
7. Content of the Community Development Agreement
A mining right holder is required to negotiate a ratified community development
agreement with each host community affected by the planned mining development,
and each such agreement shall include as a minimum the following provisions:
146 147
(1) the person, persons, board, committee, foundation, trust, forum, body or
other entity which shall manage the agreement;
(2) the person or body that represents the partner community for the
purposes of the agreement;
(3) the means by which a registry of persons comprising the community will
be developed, maintained and updated;
(4) the means by which members of a partner community will participate in
the community’s agreement related decision-making processes;
(5) the means by which the interests of women, youth and sub-communities
of the partner community will be represented in the community’s
agreement related decision-making processes and implementation;
(6) the goals and objectives of the community development agreement;
(7) a community development programme (see Section 2v. above)
(8) the roles and obligations of the holder of the mining right to the partner
community, which may or may not be part of the development programme
plan, including but not necessarily limited to:
(a) undertakings with respect to the social and economic
contributions that the project will make to the sustainability of
the community;
(b) assistance in creating self-sustaining, income-generating
activities, such as but not limited to, production of goods and
services needed by the mine and the community;
(c) consultation with the community in the planning of mine closure
and post-closure measures that seeks to prepare the community
for the eventual closure of the mining operations;
(9) the roles and obligations of the partner community to the holder of the
mining right;
(10) the roles and obligations of the District Council, if it is a party to the
community development agreement or otherwise so chooses to be
obligated;
(11) the means by which the community development agreement shall be
reviewed by the holder of the mining right and partner community every
five (5) calendar years, and the commitment to be bound by the current
agreement in the event that any modifications to the agreement sought
by one party cannot be mutually agreed with the other party;
(12) the consultative and monitoring frameworks between the holder of the
mining right and the partner community, and the means by which the
community may participate in the planning, implementation, management,
measurement (including indicators) and monitoring of activities carried
out under the agreement;
(13) the language(s) to be used in the preparation of reports, plans, and other
written matters required under the agreement;
(14) the means by which any funds made available under the agreement are to
be disbursed, for what purposes they may be disbursed, what accounts
must be kept and by whom, and reporting and auditing requirements;
(15) the mechanisms whereby the partner community, and sub-communities
and members of the partner community may lodge a grievance with the
mining right holder;
(16) the mechanisms whereby the mining right holder may lodge a grievance
with the partner community;
(17) the process by which the agreement may be modified;
(18) a statement to the effect that both the holder of the mining right and
partner community agree that any dispute regarding the agreement shall
in the first instance be resolved by consultation between the holder and
the partner community representative(s);
(19) the dispute resolution mechanism to be used when consultation between
the holder and the partner community representative(s) fails;
(20) severability of articles;
(21) the applicable law, which shall be the law of Sierra Leone;
(22) reasons and procedure for declaring force majeure;
(23) duration of the agreement;
148 149
(24) suspension / termination of the agreement;
(25) assignment of the agreement or any right or obligation there under;
(26) transfer of all community development agreement rights and obligations
to any party to whom the mining right holder transfers its mining right;
(27) how notifications to respective parties shall be done;
(28) in order to prevent any overlap of resources and wastage of funds, a
provision requiring the mining right holder to co-ordinate with the
relevant local or central planning authorities which are responsible for
providing schools, medical centres, hospitals and other social
infrastructure to local communities;
(29) location where the agreement may be accessed by members of the
community; and
(30) the agreement signatories, which may for the partner community be the
representatives of the community, representatives of sub-communities
comprising the community, community members or any combination
thereof, non-governmental organizations, and others as the need requires.
8. Other Issues to be considered
In addition to the subject matter listed in (7) above, it is recommended that a
community development agreement take into account the unique circumstances of
the mining right holder and partner community, and the issues to be addressed in
the agreement and development program plan might address all or some or none of
the following issues:-
(1) role of local and other levels of government;
(2) educational scholarship, apprenticeship, technical training and
employment opportunities for the people of the community;
(3) employment quota or percentage allocation for sub-communities;
(4) financial or other forms of contributory support for infrastructural
development and maintenance such as education, health or other
community services, roads, water and power (in consultation with relevant
government authorities);
(5) assistance with the creation, development and support to small-scale
and micro enterprises;
(6) special programs which benefit women;
(7) special programs which benefit youth;
(8) special programs which benefit sub-communities within the partner
community;
(9) agricultural product marketing;
(10 ) protection of natural resources;
(11) support for cultural heritage and sports;
(12) treatment of cultural and sacred sites;
(13) treatment of ecological systems, including restoration and enhancement,
for traditional activities such as hunting and gathering;
(14) language training to further employment prospects;
(15) how cultural values will be respected;
(16) cross-cultural training requirements;
(17) malaria, AIDs and drug dependency prevention and intervention;
(18) land access;
(19) the assumption of specified obligations of the mining right holder by the
partner community, sub-communities and/or government authorities on
an evolving basis and/or upon termination of the agreement;
(20) methods and procedures of environment and socio-economic
management, and local governance enhancement;
(21) coordination with local and national government development plans
affecting the community;
(22) requirements with regard to third parties such as the mining right holder’s
contractors and suppliers;
(23) the involvement of non-governmental organizations; and
150 151
(24) other matters as may be agreed.
9. Goals and Objectives of the Community Development Plan
It is recommended that goals, objectives, obligations and activities specified in a
community development agreement aim to achieve sustained community
development which-
(1) lasts from generation to generation;
(2) is based on the actual needs of the community;
(3) is maintainable within available income;
(4) is well planned, monitored and evaluated;
(5) has long term benefits;
(6) prepares the community for closure of the mine;
(7) compliments but does not replace government-led development and
services;
(8) is in accord and compliments local and regional government development
plans; and
(9) recognizes and incorporates traditional knowledge.
10. The Role of the Local Authority
A mineral right holder and partner community shall consider what role the District
Council should have in regard to a community development agreement, whether
that role should be described in such agreement, and whether it would be
appropriate for the District Council to be a party to such agreement.
11. Provisions to be excluded from Community Development Agreements
A community development agreement shall not address any of the following
matters:-
(1) the provision of any passenger car, small truck, or four by-four vehicle to
any individual or single family unit of the partner community or to the
partner community, other than a specialized purpose vehicle such as an
ambulance, fire engine, water truck, or bus; or
(2) the provision of any monetary amount, service, good, or facility for the
sole benefit of an individual or single family unit.
12. Other Matters
(1) It is recommended that a community development agreement be in English
but where a substantial proportion of the community members are not
fluent in English the mining right holder party to such agreement should
consider making available to representatives of the partner community
translated copies in the local language or dialect.
(2) It is recommended that a mining right holder that enters into a community
development agreement with a partner community take into
consideration;-
(a) any community development agreements it has with other partner
communities so that such agreements complement one another
to achieve synergistic development across the communities.
(b) any existing community development agreements entered into
by that partner community with other holders of mining rights so
that its community development agreement compliments such
existing agreements, and whether the mining right holder might
become a party to any such existing agreements.
(c) any governmental community, local or regional development
plans or schemes so that the agreement is in harmony with and
compliments such plans or schemes.
(3) It is recommended that the holder of a mining right who has entered into
one or more community development agreements expend no less than
one tenth of one percent (0.1%) of the gross revenue amount earned
pursuant to that right from mineral sales in the previous calendar year to
implement all its agreement(s) or otherwise promote community
development.
152 153
(4) Where a mining right holder makes expenditures pursuant to a community
development agreement, it is recommended that such expenditures be
done in a transparent, predictable and sustained manner over the life of
the mine.
(5) The value of community development related work might include (whether
incurred directly by the mining right holder or indirectly through payments
by the mining right holder to a contractor, community trust, community
foundation or other legal entity):
(a) work or funds irrevocably committed to fulfil any obligation of
the mining right holder specified in a community development
agreement;
(b) salaries and benefits of any person responsible for managing
the implementation of one or more community development
agreements where such responsibilities comprise over fifty
percent(50%) of that person’s time;
(c) social baseline studies (the gathering and compilation of baseline
data that describes the state of the ecological, social and
economic environment and characteristics of the populations
living in the area);
(d) social impact and opportunities assessment work (assessment
of the potential ecological, social and economic impacts of the
project upon communities and measures to offset potential
negative impacts and maximize positive impacts);
(e) competencies assessment (measuring and recording the skills in
a community);
(f) participatory planning (the preparation of development program
plans where community members participate in the planning
effort);
(g) community and mining operation mapping (maps depicting what
the community perceives as its community space, where mining
operations will take place and when, where access is open,
restricted, or closed);
(h) institutional analysis processes (processes for identifying and
discussing what institutions are present in and around a
community);
(i) problem census taking (processes by which community members
articulate the problems they consider need addressing in their
community);
(j) implementation of District Council regional and community
development plans;
(k) training programs for members of a partner community;
(l) consultation processes between the mining right holder and a
partner community or members of a partner community and or
local government which are related to the creation or
implementation of a community development agreement;
(m) community development agreement monitoring;
(n) conflict management activities (the implementation of a grievance
process, other than Court actions, as stipulated in a community
development agreement); and
(o) such other expenditures as may be appropriate in the
circumstances.
(6) It is recommended that the holder of a mining right provide annually to
the Mining Cadastre Office, Minerals Advisory Board for every
community development agreement to which it is a party -
(a) a Community Development Agreement Annual Report no later
than January 31st, describing objectives, activities, milestones
and results for January through December during the prior
calendar year, and
(b) a Community Development Annual Expenditure Report not later
than February 15th detailing its community development
expenditures and total expenditure for January through December
during the prior calendar year.
(7) All community development agreements, community development
agreement reports and community development annual expenditure
reports (including all required attachments) submitted by past and present
holders of a mining right in furtherance of these standards shall be open
to free inspection by members of the public at the Mining Cadastre
Office during normal Government office hours.
154 155
(8) It is recommended that a community development agreement, community
development agreement reports and community development annual
expenditure reports (including all required attachments) submitted by
the holder of a mining right in furtherance of these standards also be
open to free inspection by any member of the partner community at the
office of the mining right holder located closest to that community during
normal office hours.
(9) It is recommended that when a mining right is transferred to another
party, the transferee should assume all rights and obligations of the
transferor under any community development agreement relating to the
mining right.
(10) The holder of a mining right which came into force prior to the publication
date of these guidelines should strive to have community development
agreements with all partner communities within two years from the
publication date of these Regulations.
THIRTEENTH SCHEDULE - CONSENT FOR THE USE OF LAND FOR
MINING PURPOSES (REGULATION 17(1))
1. The nature of consent
Before the initiation of any mining activity regulated under the Mines and Minerals
Act 2009 and these Regulations, the applicant for a mining right must obtain consent
to use the surface land on licence area for exploration or mining purposes. Consent
must be obtained from the Chiefdom Mining Allocation Committee or its rightful
occupiers or owners, and must be supported by documentary evidence.
2. Conditions for granting an Environmental Licence
Before granting an environmental licence for exploration, small scale mining, large
scale mining or any other mineral activities authorized under these Regulations,
the Agency will require proof that a legally binding agreement is in place to cover
use of land for mining purpose and that any other permits or permissions under
other legislation have been secured by the applicant.
Exceptionally, the Board of the Agency may grant an environmental licence for
complex projects involving a multiplicity of surface right ownerships if evidence is
presented to show that negotiations are at an advanced stage and there are no
substantive areas of disagreement between all the parties. The issue of a licence
under conditions where agreements remain to be concluded will be entirely at the
discretion of the Board of the Agency with no grounds for appeal in the event that
a licence is withheld.
3. Standard form on the status of consent for the use of land for mining
purposes
Registration Details
Name ofApplicant ……………………………........……………………………………
Document Identity /registration no.……………………............................……………
Registration with the Agency …………………………………………………………..
Legal representative…………………………………………………………………….
Address……………………...…………………………………………………………..
Telephone number………………………………………………………………………
E-mail address……………………………………………………………………………..
Details of the Land owner(s)
Provide the name, address and contact details for each independent land owner
Details of the Chiefdom Mining Allocation Committee
Mining District …………………………………………………..…………….……..
Name ofChiefdom……………………………………………………………..………
Name of Representative
Address ………………………………………………………………………….……..
Telephone number ……………………………………………………………………
Email……………………………………………………………………………..……..
156 157
Details of the Land owner(s)
Provide the name, address and contact details for each independent land owner
Name……………………………...……………………………………………………..
Address …………………………………………..……………………………………..
Telephone number …………………………….………………………………………
Email ………………………………………………....…………………………………..
Status of negotiations for consent to use land for exploration purposes
Answer each question by ticking the relevant box Yes No
A full legal agreement has been signed between the
applicant for the environmental licence and mineral
rights and the land owner(s) identified above, for the
use of land covered by this application for mining
exploration purposes.
A draft legal agreement has been exchanged between
rights and the land owner(s) identified above, for the
use of land covered by this application for mining
exploration purposes. The draft agreement covers
all heads of agreement and there is no dispute between
any of the parties which would prevent full agreement
being reached.
A full legal agreement has been entered into between
rights and the land owner(s) identified above,
covering the terms of compensation for any disturbance to
the land owners’ rights during the mining operations.
Attempts to reach a voluntary agreement between the
and the land owner(s) identified above, for the use of
land covered by this application for mining exploration
purposes have been unsuccessful and an application
has been made to the Minister under the Mines and
Minerals Act, 2009
Status of negotiations for consent to use land for small scale mining
Answer each question by ticking the relevant box Yes No
A full legal agreement has been signed between
the applicant for the environmental licence and
mineral rights and the land owner(s) identified above,
for the use of land covered by this application for small
scale mining operations.
A draft legal agreement has been exchanged between
rights and the land owner(s) identified above, for the use
of land covered by this application for small scale mining
operations. The draft agreement covers all heads of
agreement and there is no dispute between any of the
parties which would prevent full agreement being reached.
A full legal agreement has been entered into between the
and the land owner(s) identified above, covering the terms
of compensation for any disturbance to the land owners’
rights during the mining operations.
Attempts to reach a voluntary agreement between the
and the land owner(s) identified above, for the use of
land covered by this application for mining exploration
purposes have been unsuccessful and an application
has been made to the Minister under the Mines and
Minerals Act, 2009
158 159
Status of negotiations for consent to use land for large scale mining
Answer each question by ticking the relevant box Yes No
A full legal agreement has been signed between
the applicant for the environmental licence and
mineral rights and the land owner(s) identified
above, for the use of land covered by this application
for large scale mining operations.
A draft legal agreement has been exchanged between
rights and the land owner(s) identified above, for the use
of land covered by this application for large scale mining
operations. The draft agreement covers all heads of
agreement and there is no dispute between any of the
parties which would prevent full agreement being reached.
A full legal agreement has been entered into between the
and the land owner(s) identified above, covering the terms
of compensation for any disturbance to the land owners’
rights during the mining operations.
Attempts to reach a voluntary agreement between the
and the land owner(s) identified above, for the use of
land covered by this application for large scale mining have
been unsuccessful and an application has been made to the
Minister under the Mines and Minerals Act, 2009 for the
land covered by this application to be compulsorily
purchased, subject to the provisions for compensation
contained in the above act.
FOURTEENTH SCHEDULE - CONFIRMATION OF LOCAL COMMUNITY
PARTICIPATION IN SUSTAINABLE DEVELOPMENT (REGULATION 18(c))
1. Basic requirements
The applicant for an Environmental Licence is obliged under the principles and
obligations set out in Regulation 3 to;-
(1) engage the local community at the earliest opportunity;
(2) ensure that the programme of participation:
(i) identifies all relevant issues that could have harmful effects on
the local community; and
(ii) guides the identification of development priorities, joint planning,
implementation, management and monitoring of sustainable
development projects.
2. Form confirming participation of the local community
Applicants’ Details
Name ofApplicant ………………………………………………………...........………
Identity document/registration…………………………………………………...……
Registration with the Agency ………………………………………………………..
Legal representative……………………………………………………………........….
Address……………………………………………………………………………………..
Telephone number…………………………………………………………........………
E-mail address……………………………………………………………..........………..
160 161
Local Community Details (A separate entry should be made for each local
community involved)
Name ofCommunity: ……………………………………………………………………
Location (Name of District): ………………………………………......………………
Official representative of the Community: …………………………...........…………
Chiefdom(s) within the local community area: ………………………………………..
Details of any Community Liaison Committee(s) (CLC) Established
Name of CLC: …………………………………….................................................……..
Name of CLC Representative: ………………….....................………………………..
Contact Details for CLC Representative: ……………………………………...……..
Date of formation and incorporation of the CLC: ……………………………………..
Number of meetings of the CLC: ………………………………………………………..
Dates when meetings of the CLC were held ………………………………….....……
Record of Public Consultation
(Provide a list of all public consultation meetings and describe the location,
venue, purpose, type of meeting, number of participants, outcomes and
recommendations with copies of minutes)
1.
2.
3.
Note: Add rows as necessary
Record of Publications, Advertisements and Media Events (Video, Film, TV and
Radio Broadcasts)
1.
2.
3.
Note: Add rows as necessary
FIFTEENTH SCHEDULE -APPLICATION FORM FOR ENVIRONMENTAL
LICENCE (REGULATIONS 17 (3), 18 (3) and 19)
This application dated ………....………..has been:
(1) Hand-delivered to the Registration Office of the Environment Protection
Agency at 3rd Floor West Wing Youyi Building, Freetown.
(2) Submitted to the Registration Office of the Environment Protection
Agency at 3rd Floor West Wing Youyi Building, Freetown by Courier
service.
(3) Hand-delivered to a regional office of the Environment Protection
Agency.
(strike out whichever of the above categories do not apply).
Signed and dated by individual authorised to submit the application
……………………………………………
Counter signature and date by receiving officer……………………………….
Official Date Stamp of the Environment Protection Agency:
The period specified for determination of the environmental licence by the
Environment Protection Agency will run from the day following receipt of the
completed application if delivered at the headquarters in Freetown, or 5 working
days after registration at a regional office to allow for the transfer of relevant
documents.
162 163
An application shall not be complete until it comprises the requisite number of all
of the documents specified in Regulation 20.
Confirmation by the Environment Protection Agency’s reception staff of the type
and number of documents handed over does not in itself constitute a formal
acceptance of a completed application. This will be provided by letter signed by a
duly authorised officer once the applications details have been checked and verified.
Registration Details
Name ofApplicant ………...........................……………………………………………
Identity document/registration……………...............…………………………………
Registration with the Agency………………..........……………………………………..
Legal representative …………………………………………………………………….
Address………………………………………………………………………………………..
Telephone number………………………………………………………………………
E-mail address………............................................................................…………………
I confirm, as the authorised officer or agent for the applicant, that the following
details are correct and that the requisite number of documents (identified by a tick
in the appropriate boxes) has been submitted with this application form:
Signature of applicant’s agent or Authorised Officer:…………………..……………
Date:……………………….
History of Application
Project Screening Application submitted: Date :
Environment Protection Agency Decision on Project Category issued: Date
Environment Protection Agency Application Reference Number:
Project Category:
Application documents submitted To be EPA
with this form completed confirmation
by applicant
No. of No. of
Copies Copies
CATEGORY D PROJECT
Environmental Code of Practice
CATEGORY C PROJECT
Environmental and Social Impact Assessment
Mine Closure Plan
CATEGORY B PROJECT
Mine Closure Plan
Environmental Management Plan
Social Management Plan
Draft Community Development Agreement
(where required)
CATEGORYA PROJECT
Mine Closure Plan
Environmental Management Plan
Social Management Plan
Draft Community Development Agreement
(supported by a community development plan)
Resettlement Management Plan
164 165
SIXTEENTH SCHEDULE - FINANCIAL ASSURANCE MECHANISM
STANDARDS (REGULATIONS 28 (1) AND 29 (1) AND (2))
The financial assurance mechanism utilised for a specific project shall be comply
with the standards defined in this Schedule.
1. Early scoping of financial feasibility
The mining right holder must ensure that the costs associated with mine closure
and post closure activities, including post closure care, are included in business
feasibility analyses during the planning and design stages. Minimum considerations
should include the availability of all necessary funds by appropriate financial
instruments to cover the cost of closure at any stage in the mine life, including
provision for early or temporary closure. Funds must be set aside early on in the
project development to finance the social and economic aspects of mine closure.
2. Level of financial assurance
The required level of financial surety will be established by the Agency taking due
regard of the following end goals and rehabilitation standards and in all cases, to
enable full reclamation and cover all costs relating to the physical closure of the
site. Reclamation shall comprise but is not limited to (i) removal of all plant,
equipment, and, where it is no longer needed, infrastructure; (ii) removal of all
hazardous materials; (iii) sealing of adits; (iv) stabilization of all surfaces; (v) revegetation of all surfaces; (vi) restoration of surface and groundwater flows; (vii)
prevention of long-term pollution and (viii) the adverse effects of closure of social
assets in the local community, the closure of which can have severe economic
consequences.
In addition, reclamation includes amounts to cover activities provided for in future
care, maintenance, reconstruction and emergency response action plans.
The social elements that should be taken in to consideration include redundancy
payments, retraining schemes, support for dependent (spin-off) businesses, utilities
(electricity, water, communications etc.), social facilities (health, education, justice
etc.), infrastructure (roads, airstrips, ports, wharves etc.), food security and the
financial system.
In most cases, the amount that is required for the financial surety is based on the
specific itemized costs of all components included in the closure or rehabilitation
plan. The amount of financial surety shall be established by the applicant and
reviewed by the Agency.
3. Timing
The financial surety must be in place before work is allowed to start on site. It does
not have to be lodged until after the mining title is granted.
4. Types of funding
Acceptable funding instruments include a cash accrual system, bank guarantee or
letter of credit, offshore trust fund, insurance policy or surety bond.The two
acceptable cash accrual systems are fully funded escrow accounts (including
government managed arrangements) or sinking funds.
5. Accessibility of financial assurance
Financial assurances should be readily accessible, dedicated, and only released
with the specific consent of the Agency. Forms of financial assurance should be
payable to the Agency under its control or in a trust for their benefit and earmarked
for reclamation and closure.
6. Funding provider
An acceptable form of financial guarantee must be provided by a reputable financial
institution.
Where a guarantee is provided, in order to assure that guarantors have the financial
capacity to assume an operator’s risk of not performing its reclamation obligations,
the Agency must carefully screen a guarantors’ financial health before accepting
any form of assurance. Any risk-sharing pools should also be operated on an
actuarially sound basis. The Agency should require periodic certification of these
criteria by independent third parties.
7. Review of financial assurance
The level of financial surety may be reviewed and revised at any time by the
Environment Protection Agency.
166 167
8. Release of financial assurance
Following the successful total rehabilitation of the site and consultation with the
relevant local community, all of the financial surety is returned to the proponent.
The financial surety funds are not available to the mining permit holder for ongoing
rehabilitation.
The funds may be partially released where progressive rehabilitation has been
successful and at the time of periodic review. Staged reductions in the level of
financial surety can help to promote progressive rehabilitation and good practices.
Before any money is returned to the mining permit holder, the Agency should
establish that the program has been successful and no further work is required on
the site. A commonly used method of evaluating the release of the financial surety
is the success of the re-vegetation program. It is also possible to use other testing
criteria, such as the surface stability, water quality, or a combination of all three.
Depending on the post closure monitoring requirements, as specified in the mine
closure plan, the mining title may not be relinquished for a significant period of
time during which period, the proponent is responsible for any additional
rehabilitation work for residual environmental impacts and social impacts and long
term care and maintenance issues. Financial surety is required to support these
obligations, either through the original security or by provision of a specific fund.
It is released when the Agency has issued a closure certificate, but a portion may
be retained to cover latent or residual environmental impacts and social impacts.
9. Public Involvement
Since the public runs the risk of bearing the environmental and social costs not
covered by an inadequate or prematurely released security, they must be accorded
an essential role in advising authorities on the setting and releasing of such security.
Therefore, the Environment Protection Agency must give the public notice and an
opportunity to comment both before the setting of the financial level of the security
and before any decision on whether to release the same.
10. No Substitute
Any type of financial assurance should not be regarded as a surrogate for a mining
permit holder’s legal liability for cleanup or for the Agency applying the strictest
scrutiny and standards to proposed mining plans and operations. Rather, a financial
assurance is only intended to provide the public with a buffer against having to
shoulder costs for which the mining permit holder is liable.
11. Primary Agency
The Agency shall act as primary government agency in all mine closure matters.
This assures the business community that one agency will take the lead on its
problems and that it will not have to answer to many differing opinions on how the
success of operation, reclamation, and closure will be measured.
SEVENTEENTH SCHEDULE - CARE AND MAINTENANCE PROGRAMME
STANDARDS (REGULATION 31 (2))
1. Context
A mine may need to be closed either permanently due to unexpected circumstances,
including but not limited to, a marked change in the geological conditions, or
temporarily due to changes in mineral demand and/or market prices which make it
uneconomic to continue production in the prevailing economic climate.
Whenever a mine needs to be closed it is a fundamental requirement of the
Regulations that one of the following two actions is taken:
(1) the mining operations are brought to an end in accordance with the
Mine Closure Plan; or
(2) the mining operations are put into temporary suspension and a care
and maintenance plan is enacted to ensure that there are no adverse
environmental or social impacts arising during the period in which
the mine is dormant.
2. Preparation of the care and maintenance plan
A care and maintenance plan must be prepared as part of the environmental
management plan and social management plan so that the necessary actions can
be taken as soon as the need for temporary closure arises. It is acknowledged that
some elements of the care and maintenance plan will cover protection of plant and
equipment and that these elements are covered in the Operational Regulations for
the Minerals Sector, 2011. This guidance relates only to environmental and social
aspects of the care and maintenance plan.
168 169
3. Activating a care and maintenance plan
Any decision taken by the environmental licence holder to place a mine under care
and maintenance must be immediately notified to the Agency. Concurrently with
this notification the environmental licence holder must undertake an environmental
and social audit of the site and its surrounding area.
4. Audit requirements
The environmental audit will establish the precise condition of all open excavations,
waste tips, minerals dumps, watercourses, chemical storage tanks, treatment plants,
tailings dams and lagoons and assess their vulnerability to erosion, subsidence,
corrosion, rupture or any other form of failure in the absence of on-going mining
activities.
The social audit will establish the likely impact of closure for employees and their
dependents and for the local and host community as well as the consequences this
will have for obligations and commitments entered into by the environmental licence
holder in relation to any Community Development Agreement.
5. Care and maintenance inspections
Under the terms of the care and maintenance plan the environmental licence holder
will be obliged to continue carrying out inspection and monitoring activities in
accordance with a schedule agreed with the Agency. Where the Agency concludes
that additional surveys and inspections or remote monitoring is required this shall
be provided by the environmental licence holder at its own expense.
6. Emergency response action plan
It shall be a condition of acceptance of the care and maintenance plan by the
Agency that the environmental licence holder formulates an emergency response
action plan along with all relevant implementation tools.
7. Financial assurance and compensation
The costs of the care and maintenance plan and the emergency response action
plan shall be covered by the financial assurance scheme.
Under the terms of the care and maintenance plan, the environmental licence holder
shall make compensatory payments to the local community and host community to
cover the loss of any payments over the period of temporary closure which would
fall due in accordance with any Community Development Agreement.
SCHEDULE EIGHTEENTH - ROSTER OF INDEPENDENT AUDITORS
(REGULATION 59 (3) )
1. Creation of a roster of independent environmental auditors
The Agency will establish and maintain a roster of environmental and social
consultants with the necessary credentials, skills and experience to undertake the
full range of environmental and social audits in the mining and minerals sector.
The roster will comprise between four and six international consultancy companies
that can be called upon to provide the full range of auditing services over a three
year period of service on the roster.
Competitive tendering for the auditor positions will be undertaken at three yearly
intervals.
2. Selection of auditors for the roster
Advertisements will be placed in international mining journals, the newsletter for
the International Association of Impact Assessors (IAIA) and other international
press outlets inviting environmental and social consultants with capabilities in
impact assessment, management, and auditing in the field of mining and mineral
development to apply for a three year post on the auditing roster.
Terms of Reference will be provided which set out the requirements for the
submission of parallel technical and financial bids. All proposals will be evaluated
in terms of the technical competence of the auditing consultancies and their staff.
Applications from those consultancy companies scoring a minimum of 70 points
under the technical assessment will go forward to a second stage review based on
its financial proposal.
The selection of environmental auditors for the roster will be based on an evaluation
of the best performing applicants on technical merit combined with lowest financial
cost using the following ratio:
170 171
Technical assessment score x 70% + financial assessment score x 30%
Technical assessment will be based on submissions outlining:
Organisation, skills and capacity Score
1. Company structure and organisation 10
2. Number and specialisms of senior managers
and project managers 10
3. A list of in-house staff (names, disciplines,
qualifications, seniority, years of work experience), 10
4. A list of recruited external consultants (names,
disciplines, qualifications, seniority, years of work
experience). 10
5. Access to laboratories and description of in-house
monitoring and auditing equipment 10
6. A method statement for handling different types of
audit with examples of related work 20
7. A detailed description of similar auditing work and
experience in the mining and related development
sectors, including client references, timescale and costs. 30
Total Score 100
Financial Proposals will provide the following information:
Information Required Score
1. Scale of charges in bands relating to skills and experience 60
Project Director
Principal Auditors
Senior Auditors
Middle Rank Auditors
Support Staff
2. Fully costed financial proposals for undertaking 3 levels
of audit according to the detailed brief provided in the
Terms of Reference for appointment. 40
Total Score 100
MADE this 15th day of May, 2013.
HADDIJATOU JALLOW (MRS.),
EXECUTIVE CHAIRPERSON
Environment Protection Agency
PRINTED AND PUBLISHED BY THE GOVERNMENT PRINTING DEPARTMENT, SIERRA LEONE.
GAZETTE NO. 31 OF 4TH JULY, 2013.
Check the current official version before relying on this text. MiLAWYER shares legal information, not legal advice.