Law library · Sierra Leone · 62 of the Environmental Protection Act, 2008, the Board hereby makes
Section 51, 62 of the Environmental Protection Act, 2008, the Board hereby makes
Status not yet checked62 of the Environmental Protection Act, 2008, the Board hereby makes, Sierra Leone
(1) The relevant environmental assessment instrument (EIA, ESIA and EMP) shall indicate-
(a) proposed control checkpoints for every
effluent and emission generated from the
operations;
(b) effluent and emission monitoring stations to
be installed in each control checkpoint;
(c) the number and technical characteristics of
monitoring equipment to be installed in each
monitoring station;
(d) the frequency with which sampling shall be
carried out at each monitoring station.
(2) For the purposes of these Regulations, effluent and
emission samples shall be taken from every control checkpoint
established in the EIA, ESIA and EMP.
(3) No change in the location of any checkpoint or
monitoring station shall be made unless with prior approval by the
Executive Chairman or Authorised Officer.
Read the whole lawDownload PDFAsk Tima what this means
Check the current official version before relying on this text. MiLAWYER shares legal information, not legal advice.