(1) An application to operate a mine or mill shall include- (b) a general description of the proposed
activities and their schedule;
(c) the results of a process-hazard analysis or
safety analysis;
(d) the proposed policies, methods and programs
for operating and maintaining the mine or
mill;
(e) a radiation protection plan that meets the
requirements of the Board;
(f) an environmental management plan that
meets the requirements of environmental
management plan in regulation 3,
(g) a waste management plan that meets the
requirements of waste management plan
in regulation 3;
(h) a strategic management plan that meets the
requirements of regulation 3;
(i) a community engagement plan that meets the
requirements of regulation 3,
(j) updates of the proposed decommissioning
plan, including commitments to ongoing
progressive rehabilitation;
(k) a financial guarantee of an amount to be
determined by the Board;
10 11
Underground
mines
In situ
recovery
mining.
Operation of
mine or mill.
(l) the ventilation, air quality management and
ground control plans;
(m) proposed reporting of the extent and
movement of mine fluids and groundwater
including monitoring and modeling;
(n) proposed reporting of impacts of mining
operations on groundwater, and
(o) location and depth of the installed injection,
recovery, monitoring and waste disposal
wells.
(9) An application to decommission a mine or mill shall include-
(b) a decommissioning plan that includes-
(i) the scope of the proposed decommissioning including land,
buildings, structures, components,
systems, equipment, waste materials,
radioactive materials and hazardous
substances that will be affected.
(ii) the scope of the currently authorized
mine or mill that will not be subject to
decommissioning;
(c) the term of the proposed authorization to
include the periods of active decommissioning work and ongoing institutional
control;
(d) the methods and programmes for carrying out
the decommissioning;
(e) schedules including proposals to
progressively apply for authorization to
release parts of the authorized mine or mill
from regulatory control;
(f) a radiation protection plan, environmental
management plan, a waste management plan
and a strategic management plan that meets
the requirement of regulation 3;
(g) a community engagement plan that meets the
requirement of regulation 3;
(h) a financial guarantee of an amount
determined by the Board;
(i) a safety case including an environmental
assessment to support the implementation
of the final decommissioning plan;
(j) the objectives and end-state status of the
authorized mine or mill on completion of
works;
(k) radiological and environmental criteria;
(l) performance measures and monitoring
programs that will demonstrate that the endstate criteria have been achieved;
(m) details of ongoing institutional controls
including access restriction and longterm
care and maintenance activities such as water
treatment;
(n) justification for any institutional controls;
(o) monitoring programs to demonstrate that
decommissioning objectives continue to be
achieved after the decommissioning phase
is completed;
(p) the content of records to be provided to the
Board at the conclusion of the term of the
authorization and location form and
accessibility of these records; and
12 13
Decommissioning.
(q) contingency measures to be taken if
decommissioning objectives do not continue
to be achieved,
(10) The application to release a mine or mill from regulatory
control shall include-
(b) the scope of the authorized site where
release from regulatory control is being
sought;
(c) a general description of the site and its
location, and any remaining buildings,
structures and equipment;
(d) results of decommissioning activities
including-
(i) radiation surveys;
(ii) environmental monitoring
(e) an assessment of the effectiveness of
rehabilitation works;
(f) structural assessment of engineered barriers;
(g) evidence that ongoing institutional controls
including access restrictions and long-term
case and maintenance activities such as water
treatment are in place and operating;
(h) location, form and accessibility of records
that have been retained;
(i) the updated safety case based on results of
decommisssioning activities;
(j) the proposed timing of release; and
(k) a community engagement plan that meets the
requirements of regulation 3.