APPLICATION FORM FOR CAPTIVE ELECTRICITY
GENERATION PERMIT
Rule 4(a)
IMPORTANT NOTE: Your application is not complete unless all
requirements herein are received and all questions are answered.
1.0 PARTICULARS OF APPLICANT
1.1 Applicant Information
Full Name: __________________________________________
Physical address: __________________________________________
Postal address: __________________________________________
Tel: __________________________________________
Fax: __________________________________________
Mobile Phone: __________________________________________
E- mail: __________________________________________
Website Address: __________________________________________
1.2 Contact Person Information
Full Name: __________________________________________
Physical address: __________________________________________
Postal address: __________________________________________
Tel: __________________________________________
Fax: __________________________________________
Mobile Phone: __________________________________________
E- mail: __________________________________________
2.0 LEGAL STATUS OF APPLICANT
2.1 Indicate legal status of Applicant (Tick relevant option)
Individual Sole proprietorship Partnership
Public Limited Private Limited Cooperative
Liability Company Liability Company Society
Other (please specify): ____________________________________________
(Attach Business registration certificates)
2.2 List and Particulars of Directors:
Full Name Address Nationality
3.0 NATURE OF PERMIT
3.1 State whether application is a new application or renewal
3.2 State whether applicant has an existing permit issued by the
Commission.
3.3 Has the Applicant ever been denied a permit or had its permit
suspended or revoked by the Commission?
3.4 If so, give details of the denial, suspension or revocation
4.0 MAIN BUSINESS ACTIVITIES OF APPLICANT
Please indicate the main business activities the applicant is
currently engaged in.
__________________________________________________
(Please attach a valid Tax Clearance Certificate)
5.0 TECHNICAL CAPACITY
Please provide a detailed statement of applicant's technical competence
to operate the Power Plant. (Attach CVs of key technical personnel
responsible for the operation and maintenance of the plant).
6.0 DESCRIPTION OF POWER PLANT
6.1 State Plant type
6.2 State total capacity of Power Plant
6.3 Location of the Power Plant
(Please attach a detailed Schedule of Plant sizes and locations if
applying for more than one location)
6.4 Is the Power Plant new? If not, please state number of years the
plant has been in operation
6.5 Is the purpose of electricity generation for main supply or standby?
(Please note that SLEWRC verify the accuracy of this
information)
7.0 TECHNICAL DATA
7.1 Name Plate information and other relevant details:
No. of Units and Capacity of each Unit __________________________
Installed Capacity ___________________________________________
Fuel Type _________________________________________________
Rated Power Factor __________________________________________
Plant Load Factor ____________________________________________
Reactive Power Capability ____________________________________
Noise Level (State distance from Power Plant) ___________________
Output Voltage _____________________________________________
Heat Rate _________________________________________________
No. of Phases ______________________________________________
Unit Frequency ____________________________________________
Unit Efficiency ____________________________________________
Date of Installation of Generator _______________________________
Make and Serial Number of Generator __________________________
Date of Manufacture of Generator _____________________________
Technical specification of other equipment ______________________
7.2 Please provide the following: (For plant size over 1 MW)
i. Site-map indicating location
ii. Technical details of Generating Set(s) including schematic
diagram and brief description of earthing system, protection
scheme, etc.
iii. Single line diagram of the Power Plant showing the cable sizes
and protective devices
iv. Environmental Impact Assessment Approval. Where EIA is not
applicable, give detailed information on effluents and discharges
and how they will be managed.
v. Any other details (considered necessary by the applicant)
Dated this ________________ day of ________________ 20_________.
____________________________________________________
(Name of Applicant)