Law library · Sierra Leone · Acts of Parliament
Sierra Leone Electricity and Water Regulatory Commission Act 2011,
Status not yet checkedEnergy and utilitiesAct of Parliament · 19 provisions
Sign in to download the PDFAsk Tima about this lawCases on this law
Contents
- Preamble
- Section 1 — In these Rules, unless the context otherwise requires-
- Section 2 — (1) These Rules shall apply to –
- Section 3
- Section 4 — An applicant shall-
- Section 5 — (1) The Commission shall -
- Section 6
- Section 7
- Section 8 — A permit holder shall pay the annual fees as determined by the
- Section 9
- Section 10
- Section 11 — (1) The permit holder shall ensure that the generation plant
- Section 12
- Section 13
- Section 14 — The Commission shall-
- Section 15 — A person who –
- Section 16
- Schedule 1
- Schedule 2
STATUTORY INSTRUMENT
Supplement to the Sierra Leone Vol. CXLX, No. 91
dated 13th December, 2019
Extraordinary Gazette
CAPTIVE ELECTRICITY GENERATION PERMIT
RULES 2019
In exercise of the powers conferred upon it by section 66 of the
Sierra Leone Electricity and Water Regulatory Commission Act 2011,
the Commission makes the following rules-
“Act” means the Sierra Leone Electricity and Water
Regulatory Commission Act, No. 13 of 2011;
“authorised representative” means any person authorised
by an applicant to represent the applicant in matters
before the Commission;
PART I-PRELIMINARY
Short title.
Interpretation.
“captive power generation” means generation of
electricity exceeding 10KVA for the purpose of
consumption by the permit holder and which is consumed
by the permit holder itself, and not sold to a third-party;
“captive power plant” means a power plant of over 10
KVA in capacity set-up by the applicant or licencee for
own use;
“Commission” means the Sierra Leone Electricity and
Water Regulatory Commission established under section
3 of the Act;
“consortium based captive power plant” means a power
plant owned by a group of industries for their own use,
except when the plant is not available;
“officer” means a staff or authorised representative of the
Commission;
“permit” means a permit granted by the Commission
under these Rules;
“permit holder” means any person issued a permit by the
Commission pursuant to these Rules;
“person” includes an individual, a company, partnership
or any association of individuals, whether incorporated or
not.
(a) a captive generator that produces electricity
from a generation unit with a rated output of
10KVA and above for the generator's own use
and not for resale to a third party;
(b) a captive power generator for commercial and
industrial purposes.
(2) For the purposes of these rules an electricity generator
plant established as a cooperative to supply power solely to the members
shall be deemed to be a captive generator.
A person shall not install or operate an electricitygeneration unit of a rated output of 10KVA and above unless that person
holds a captive generation permit issued by the Commission.
(a) fill out the application form set out in Schedule
1;
(b) a t t a c h t o t h e a p p l i c a t i o n f o r m a n
environmental impact assessment certificate
issued by the Environmental Protection
Agency, in the case of a person applying to
install or operate a generation plant with a
capacity of 500KVA or more;
(c) deliver the application at the Commission's
principal place or any other place as determined
by the Commission;
PART II - APPLICATION FOR A PERMIT
Application.
Requirement
for a permit.
Application
for a permit.
(d) on submission of the application pay an
application fee as determined by the
Commission and published in the Gazette.
(a) acknowledger receipt of the application made
under rule 4 within 10 days of receiving the
application;
(b) inform the applicant in writing of its decision
within 30 days of receiving the application.
(2) The Commission shall issue a permit subject to the
applicant meeting the technical and operational requirements set out in
the Act or statutory instruments made under the Act
(3) Where the Commission refuses the application it shall
communicate its decision to the applicant within 30 days stating the
reasons for the refusal.
The applicant whose application is successful shall pay thepermit fee as determined by the Commission and published in the
Gazette.
(1) A permit issued under these rules shall be valid for aperiod of 5 years.
(2) A permit may be renewed at the end of its term subject to
the holder complying to the terms and conditions of the permit.
Commission and published in the Gazette.
Issuance of
Permit.
Permit Fee.
Duration of
Permit.
Annual fee.
PART III - TRANSFER OF PERMIT AND OTHER RELATED
PROVISIONS
(1) A permit holder shall not transfer the permit toanother person unless he submits to the Commission a written
application in the form as set out in Schedule 2 requesting authorisation
to transfer the permit .
(2) The Commission shall not unduly withhold its authority
to grant the authorization to transfer the permit.
(3) Where the Commission does not grant the application it
shall state the reasons for not granting the authorization to transfer the
permit .
(1) The Commission may suspend or cancel a permit whereit is satisfied that -
(a) the permit holder has contravened a term or
condition of the permit;
(b) the permit holder has given information to the
Commission which is false or misleading ;
(c) it is in the public's interest to do so.
(2) Where the Commission has grounds for the suspension
or cancellation of a permit it shall notify the permit holder of its intention
and shall give the permit holder an opportunity to show cause why the
permit should not be suspended or cancelled.
(3) Where the permit holder is unable to persuade the
Commission or fails to respond to the notice referred to in sub-rule 2, the
Commission shall proceed to suspend or cancel the permit in accordance
with section 35 of the Act.
Transfer of
Permit.
Suspension or
cancellation of
permit.
(4) The Commission shall restore the permit when the
holder remedies the defect that gave rise to the suspension or cancellation.
–
(a) meets the standards relating to specification
and design;
(b) is installed and operated by a qualified person
and in accordance with good practice;
(c) is installed at an appropriate location;
(d) complies with environmental requirements.
(2) An operator of a captive generation plant shall ensure
that –
(a) the generation plant and its associated facilities
–
(i) are operated and maintained in
accordance with the manufacturer's
manual;
(ii) do not pose a danger to the public;
and
(b) the highest level of safety is observed.
(3) Where the facilities are connected to an electricity
network, the permit holder shall ensure that the generation plant and
facilities are operated-
Conditions
of permit.
(a) in accordance with the distribution or grid
code; and
(b) in a manner that prevents interference with the
network.
(1) A licensee whose network is connected to the permitholder's facilities shall ensure that the captive generation plant and
associated facilities are compatible with the licensee's network.
(2) For the purposes of this rule a licensee means a person
issued with a licence by the Commission to undertake an activity
specified under the Act or statutory instruments made under the Act.
T h e C o m m i s s i o n s h a l l a p p o i n t i n s p e c t o r s t oinspect plants and facilities at such times as the Commission may
determine.
(a) maintain a register of permit holders; and
(b) publish the list of permit holders in the Gazette
and on its website.
(a) operates a generation plant, installation or
facility without the requisite qualification or
permit;
(b) allows unqualified persons to operate the
generation plant;
PART IV - MISCELLANEOUS
Network
connected
to facilities.
Inspection.
Register.
Offences.
(c) obstructs or interferes with a member of the
Commission carrying out functions under the
Act or statutory instruments made under the
Act;
(d) fails to comply with other provisions in these
rules
commits an offence punishable under section 65 of the Act.
Any person operating a captive generation plant prior to thecoming into effect of these rules and intends to continue operating the
plant shall apply for a permit within 3 months from the coming into effect
of these rules or cease operation after 6 months if the permit is not
obtained.
Transitional
Provision.
APPLICATION FORM FOR CAPTIVE ELECTRICITY
GENERATION PERMIT
Rule 4(a)
IMPORTANT NOTE: Your application is not complete unless all
requirements herein are received and all questions are answered.
1.0 PARTICULARS OF APPLICANT
1.1 Applicant Information
Full Name: __________________________________________
Physical address: __________________________________________
Postal address: __________________________________________
Tel: __________________________________________
Fax: __________________________________________
Mobile Phone: __________________________________________
E- mail: __________________________________________
Website Address: __________________________________________
1.2 Contact Person Information
Full Name: __________________________________________
Physical address: __________________________________________
Postal address: __________________________________________
Tel: __________________________________________
Fax: __________________________________________
Mobile Phone: __________________________________________
E- mail: __________________________________________
2.0 LEGAL STATUS OF APPLICANT
2.1 Indicate legal status of Applicant (Tick relevant option)
Individual Sole proprietorship Partnership
Public Limited Private Limited Cooperative
Liability Company Liability Company Society
Other (please specify): ____________________________________________
(Attach Business registration certificates)
2.2 List and Particulars of Directors:
Full Name Address Nationality
3.0 NATURE OF PERMIT
3.1 State whether application is a new application or renewal
3.2 State whether applicant has an existing permit issued by the
Commission.
3.3 Has the Applicant ever been denied a permit or had its permit
suspended or revoked by the Commission?
3.4 If so, give details of the denial, suspension or revocation
4.0 MAIN BUSINESS ACTIVITIES OF APPLICANT
Please indicate the main business activities the applicant is
currently engaged in.
__________________________________________________
(Please attach a valid Tax Clearance Certificate)
5.0 TECHNICAL CAPACITY
Please provide a detailed statement of applicant's technical competence
to operate the Power Plant. (Attach CVs of key technical personnel
responsible for the operation and maintenance of the plant).
6.0 DESCRIPTION OF POWER PLANT
6.1 State Plant type
6.2 State total capacity of Power Plant
6.3 Location of the Power Plant
(Please attach a detailed Schedule of Plant sizes and locations if
applying for more than one location)
6.4 Is the Power Plant new? If not, please state number of years the
plant has been in operation
6.5 Is the purpose of electricity generation for main supply or standby?
(Please note that SLEWRC verify the accuracy of this
information)
7.0 TECHNICAL DATA
7.1 Name Plate information and other relevant details:
No. of Units and Capacity of each Unit __________________________
Installed Capacity ___________________________________________
Fuel Type _________________________________________________
Rated Power Factor __________________________________________
Plant Load Factor ____________________________________________
Reactive Power Capability ____________________________________
Noise Level (State distance from Power Plant) ___________________
Output Voltage _____________________________________________
Heat Rate _________________________________________________
No. of Phases ______________________________________________
Unit Frequency ____________________________________________
Unit Efficiency ____________________________________________
Date of Installation of Generator _______________________________
Make and Serial Number of Generator __________________________
Date of Manufacture of Generator _____________________________
Technical specification of other equipment ______________________
7.2 Please provide the following: (For plant size over 1 MW)
i. Site-map indicating location
ii. Technical details of Generating Set(s) including schematic
diagram and brief description of earthing system, protection
scheme, etc.
iii. Single line diagram of the Power Plant showing the cable sizes
and protective devices
iv. Environmental Impact Assessment Approval. Where EIA is not
applicable, give detailed information on effluents and discharges
and how they will be managed.
v. Any other details (considered necessary by the applicant)
Dated this ________________ day of ________________ 20_________.
____________________________________________________
(Name of Applicant)
TRANSFER OF PERMIT
Rule 9(1)
IMPORTANT NOTE: Your application is not complete unless all
requirements herein are received and all questions are answered.
1.0 PARTICULARS OF APPLICANT
1.1 Applicant Information (Transferor)
Name:_____________________________________________________
Location Address:___________________________________________
___________________________________________
Mobile Phone Number(s):_____________________________________
Email:_____________________________________________________
1.2 Contact Person Information
Name:_____________________________________________________
Contact Address:____________________________________________
___________________________________________
Mobile Phone Number:______________________________________
Email:____________________________________________________
1.3 Applicant Information (Transferee)
Name:____________________________________________________
Location Address:___________________________________________
__________________________________________________
Mobile Phone Number(s):____________________________________
Email:____________________________________________________
1.4 Contact Person Information
Name:_____________________________________________________
Contact Address: ____________________________________________
____________________________________________
Mobile Phone Number:_______________________________________
Email:____________________________________________________
2.0 LEGAL STATUS OF TRANSFEREE
2.1 Indicate legal status of Transferee (Tick relevant option)
? Individual ? Sole proprietorship ? Partnership
? Public Limited Liability Company ? Private Limited Liability
Company
? Cooperative Society
? Other (please specify): ______________________________________
(Attach Business registration certificates)
2.2 List and Particulars of Directors of the Transferee:
Full Name Address Nationality
3.0 NATURE OF CURRENT PERMIT
3.1 Current Permit:
(a) Permit Number
(a) Expiration date of the permit
(b) Has the transferee ever been denied a permit or had its permit
suspended or revoked by the Commission?
If yes, state the case number
3.2 Previous Application(s)
(a) Have you applied previously for a Transfer of your Permit?
(b) Has the applicant ever been refused an Application to transfer
the permit?
If yes, state the case number
3.3 Term of Proposed Transfer
4.0 MAIN BUSINESS ACTIVITIES OF TRANSFEREE
Please indicate the main business activities the applicant is currently
engaged in.
(Please attach a valid Tax Clearance Certificate)
5.0 TECHNICAL CAPACITY
Please provide a detailed statement of transferee's technical
competence to operate the Power Plant. (Attach CVs of key technical
personnel responsible for the operation and maintenance of the plant).
6.0 DECLARATION BY THE APPLICANT(Transferor):
I/we hereby declare that the details stated above are, to the best of
my/our knowledge, true and correct.
Dated this ______ day of _______________ 20_________.
Has hereunto been affixed in the presence of:
Name:_____________________ Sign:__________________
POSITION if corporate person
7.0 DECLARATION BY THE APPLICANT(Transferee):
I/we hereby declare that the details stated above are, to the best of
my/our knowledge, true and correct.
Dated this ______ day of _______________ 20_________.
Has hereunto been affixed in the presence of:
Name:_____________________ Sign:__________________
POSITION if corporate person
Sworn to this ________ day of _________ 20________ at ________
BEFORE ME
______________________________________________________
NOTARY PUBLIC/COMMISSIONER OF OATHS
MADE this th day of , 2019.
MOHAMED D. B. SESAY,
Chairman
PRINTED AND PUBLISHED BY THE GOVERNMENT PRINTING DEPARTMENT, SIERRA LEONE
EXTRAORDINARY GAZETTE NO. 91OF 13TH DECEMBER , 2019.
EXPLANATORY MEMORANDUM
(This explanatory memorandum is not part of these
rules but is intended to indicate its general purport)
The statutory instrument is made pursuant to section 66 of the
Sierra Leone Electricity and Water Regulatory Commission
Act 2011.This instrument is divided into 4 parts.
Part 1 covers the interpretation and application provisions. The
interpretation provision defines words and expressions used
throughout the instrument. The application provision
stipulates that the instrument applies to –
(a) A captive generator that produces electricity
from a generation unit with a rated output of
10 KVA and above for the generator's own
use and not for resale to a third party;
(b) A captive power generator for commercial
and industrial purposes.
Part II covers provisions on application for a permit. The
instrument provides that no person should install or operate
an electricity generation unit of a rated output of 10KVA and
above unless that person holds a captive generation permit
issued by the Commission for that purpose.
Part III covers provisions on transfer of permit and other
related provisions.
Part IV contains miscellaneous provisions. The instrument
criminalises among other things the operation of a generation
plant, installation or facility without a permit.