Law library · Sierra Leone · Subsidiary legislation
Providers Rules 2019
Status not yet checkedSubsidiary legislation · 21 provisions
Sign in to download the PDFAsk Tima about this lawCases on this law
Contents
- Preamble
- Section 1
- Section 2 — (1) These rules shall apply to a manufacturer, assembler
- Section 3
- Section 4
- Section 5
- Section 6
- Section 7
- Section 8 — The applicant shall submit the application with a nonrefundable fee as determined by the Commission and published in the
- Section 9
- Section 10
- Section 11
- Section 12
- Section 13
- Section 14
- Section 15
- Section 16 — (1) A holder of a certificate shall ensure that -
- Section 17
- Section 18
- Section 19 — A person who -
- Section 20
STATUTORY INSTRUMENT
Supplement to the Sierra Leone Extraordinary Gazette Vol. CXLX, No. 91
dated 13th December, 2019
PROVIDERS RULES 2019
In exercise of the powers conferred upon it by section 66 of the
Sierra Leone Electricity and Water Regulatory Commission Act 2011, the
Commission hereby makes the following rules.
PART I-PRELIMINARY
In these Rules unless the context otherwiserequires–
“Act” means the Sierra Leone Electricity and Water
Regulatory Commission Act, 2011;
“certificate” means the authorization issued by the
Commission pursuant to an application for certification
under these Rules;
“EIA” environmental impact assessment;
“ESI” means the electricity supply industry of Sierra
Leone;
“meter” means a device that measures and registers the
integral active energy or reactive energy over a certain
interval and may include data recorder but excludes
instrument transformers;
Short title.
Interpretation.
“metering system” means a meter and the associated
current transformers, voltage transformers, metering
protection equipment, including alarms, low voltage
electrical circuitry, associated data collectors, data
transmitters, related to the measurement, recording and
transmission to the data collection system, the active
energy or reactive energy or both;
“meter test station” means a certified test laboratory
which has the technical and infrastructural capability to
perform accuracy tests for meters and metering systems;
“Electricity Act” means the National Electricity Act,
2011 ;
,importer or installer of energy metering systems.
(2) These rules shall not apply to a licensee who undertakes
metering activities itself.
PART II-APPLICATION FOR CERTIFICATES AND OTHER
RELATED PROVISIONS
No person shall manufacture, assemble, import or installelectric meters or metering systems unless that person holds a certificate
issued by the Commission for that purpose.
An applicant who wishes to undertake more then one activityunder these rules shall apply for a multiple Certificate.
The types of certificates to be issued by the Commission shallbe as follows-
(a) the manufacturer or assembler's certificate;
(b) the importer's certificate;
(c) the installer's certificate
Application
of rules.
Requirement for a
certificate .
Multiple
Certificate
Types of
Certificate
(1) The Commission shall categorise installers ofsystems into the following categories–
(a) Class A
(b) Class B
(c) Class C
(2)The level of installation works and qualification required
for each category referred to in sub-rules (1) shall be as follows–
(a) Class A certificate holder may undertake any
type of metering installation and shall satisfy
the conditions specified in Schedule 2A;
(b) a Class B certificate holder is authorized to
undertake any metering works within the
distribution network and shall satisfy the
conditions specified in Schedule 2B;
(c) a Class C certificate holder is authorized to
undertake metering works only for voltages of
415V and lower and shall satisfy the conditions
specified in Schedule 2C
(1) A person who wishes to undertake any activity underthese rules shall make a written application in the prescribed form to the
Commission.
(2) A person applying for–
(a) manufacturer or assembler's certificate shall fill
out the form set out in Schedule 1A;
(b) importer's certificate shall fill out the form set
out in Schedule 1B
metering Installers
Mode of
Application.
(c) installer certificate shall fill out the form set out
in Schedule 1C
(3) An application for a certificate shall be accompanied
with all the supporting documents relevant to the certificate applied for.
(4)An application shall be signed by the applicant, addressed
to the Commission and delivered by post or email.
Gazette.
The Commission shall within 10 days of receiving anapplication issue a letter to the applicant acknowledging receipt of the
application.
(1) The Commission shall within 30 days from the date ofreceipt of the application make a decision and notify the applicant of the
decision in writing .
(2) An application shall be granted by the Commission
unless the applicant fails to meet the technical, financial and managerial
capability criteria under the Act and statutory instruments pursuant to the
Act.
(3) If the Commission refuses the application, it shall in
communicating the decision to the applicant state the reasons for the
refusal.
PART III-DURATION OF CERTIFICATES AND
RELATED PROVISIONS
(1) The holder of a certificate shall pay the annual feeas determined by the Commission and publish in the Gazette.
(2) The annual fee shall be paid on or before each
anniversary of the date of first issuance.
Application
fees.
Decision of
Commission.
Receipt of
application.
Annual
Fees.
(1) A holder of a certificate shall not transfer the certificateto another person unless he makes an application to the Commission
requesting approval to transfer the certificate.
(2) Subject to these rules the Commission shall not unduly
withhold its approval of transfer.
(1) A certificate shall be valid for a period of 5 yearssubject to these rules .
(2) Subject to these rules the certificate may be renewed by
the Commission at the end of its term.
(1) The Commission may suspend or cancel a certificatewhere it is satisfied that -
(a) the holder has
(i) contravened a term or condition of
the certificate;
(ii) has given information to the
Commission which is false or
misleading;
(b) it is in the public interest to do so.
(2) When the Commission has grounds for the cancellation
of a certificate, it shall give notice to the holder to show cause why the
certificate should not be withdrawn.
(3) If the holder of the certificate is unable to persuade the
Commission or fails to respond to the notice, the Commission shall
proceed to cancel the certificate in accordance with section 35 of the Act.
(4) The Commission shall restore the certificate when the
holder remedies the matter that gave rise to the suspension or
cancellation.
Transfer of
Certificate.
Duration
and
Renewal
of Certificate.
Suspension
or cancellation.
(1) The Commission shall maintain a register of holders ofcertificate and the type of services they are qualified to
(2) The Commission shall publish the list of holders of
certificate in the Gazette and on its website.
(a) the metering systems the person manufactures,
deals in or installs are fit for the purpose and
conform to the Sierra Leone standard as well as
satisfy the requirements of statutory
instruments relating to grid, distribution and
wiring respectively;
(b) the requisite level of facilities and equipment
are deployed for undertaking the activities;
(c) it employs persons with the requisite training,
knowledge and competence to undertake the
activities authorized.
(2) A holder of a certificate shall provide service that is
adequate and non-discriminatory to persons who apply for their services
and satisfy the conditions relating to the service.
(1) A holder of a certificate shall submit an annual report tothe Commission on meters, metering systems or knocked down parts
supplied or installed in each calendar year for each type of activity
undertaken.
(2) The report shall be submitted on or before the end of the
first quarter in the following year.
A certified installer of metering system shall draft aprocedure for resolving disputes with its customers and shall submit the
draft procedure for the approval of the Commission before
implementation.
Register
perform.
Conditions
of certification.
Annual
Report.
Resolution
of dispute.
PART IV- MISCELLANEOUS PROVISIONS
(a) manufactures, assembles, imports or installs
electric meters or metering systems without a
certificate;
(b) employs or allows to be employed persons not
qualified to work in the provision of metering
services; or
(c) obstructs or interferes with a member of the
Commission, officer or a person employed by
the Commission in the exercise of powers
commits an offence punishable under section
65 of the Act.
A person prior to the coming into effect of these rules who wasengaged in an activity requiring a certificate under these rules shall apply
for the relevant certificate within 3 months of the coming into effect of
these rules.
Offences
and
penalties.
Transitional
Provision.
SIERRA LEONE ELECTRICITY AND WATER REGULATORY
COMMISSION
PROVIDERS RULES, 2018
SCHEDULE 1A: APPLICATION FORM
FOR THE CERTIFICATION OF A MANUFACTURER OR
ASSEMBLER OF METERING SYSTEMS
Rule 7(2)(a)
Section A
Indicate type of Manufacturer Assembler
certificate
1. Full Name of Applicant
2. ID/Social Security No
3. Business name:
4. Address
5. Contact person
(if different from
applicant)
6. Telephone number
7. Email
8. Indicate whether new
application or renewal.
If renewal state current
Certificate Number.
9. List of key personnel
10. Qualification and
experience of key
personnel
11. List of relevant
documents attached
as required under
12. Description of electric
energy meter
a) Make:
b) Type: whether single
or three phase
13. Annual production capacity
14. Technical data
a)Nominal voltage;
b) Operating voltage;
c) Accuracy class
d) Current rating
e) Frequency;
d) Operating temperature;
e) Storage temperature;
f) Lifespan;
15. Purpose of manufacturing
or assembling
It is mandatory to provide the following information:
1. Business registration certificate
2. NRA Certificate
3. EIA Certificate
4. Type Test Certificate report
5. Meter Test Station Test report
6. Proof of existence or access to facilities
7. Others.
Name: Signature: Date:
SIERRA LEONE ELECTRICITY AND WATER REGULATORY
COMMISSION
PROVIDERS RULES, 2018
SCHEDULE 1B: APPLICATION FORM
FOR THE CERTIFICATION OF AN IMPORTER
IN METERING SYSTEMS
Rule7(2)(b)
Section A
1. Full Name of Applicant
2. ID/Social Security No.
3. Business name:
4. Address
5. Contact person (if different
from applicant)
6. Telephone number
7. Email
8. Indicate whether new
application or renewal.
If renewal state current
certificate number.
9. Names and particulars of
directors of company
10. List of relevant documents
attached as required under
11. Description of electric energy meter
a) Make:
b) Type: whether single or three phase
12. Estimated annual imports
13. Technical data
a)Nominal voltage;
b) Operating voltage;
c) Accuracy class;
d) Current rating;
e) Frequency;
d) Operating temperature;
e) Storage temperature;
f) Lifespan;
15. Purpose of importing/ main customers
It is mandatory to provide the following information:
1. Business registration certificate
2. NRA Certificate
3. Type test certificate report
4. Meter test station test report
5. Proof of existence or access to facilities
6. Others.
Name: Signature: Date:
SIERRA LEONE ELECTRICITY AND WATER REGULATORY
COMMISSION
PROVIDERS RULES, 2018
SCHEDULE 2A-QUALIFICATIONS
SCHEDULE 2A: QUALIFICATIONS OF INSTALLER OF
METERING SYSTEMS –CLASS A
Rule 6(2)(a)
Qualifications of Installer of Metering System Class “A” Certificate
No of Education Competency
Employee
2 (1) MSc Engineering Experience in installation,
(5 years) BSc maintenance and accuracy
Engineering checks of grid meters
(7 years) HND (above 33 KV)
(15 years)
3 (2) MSc Engineering – 1. Experience and
3years demonstrable ability to
BSc Engineering – recognize and effectively
5years deal with hazards related
HND – 10 years to grid metering panels
2. Competence in grid
metering systems
installation, maintenance,
calibration, trouble
shooting and repairs
3. Ability to calculate
meter constraints,
multipliers and summation scheme values
4. Enhanced safety skills
at grid level
4 (2) BSc Engineering–
3 years HND –
7 years Master
Electrician -15 years
Technician – 20 years
SCHEDULE 2B-QUALIFICATIONS OF INSTALLER OF
METERING SYSTEMS -CLASS B
Rule 6(2)(b)
Qualifications of Installer of Metering System Class "B" Certificate
1 MSc Engineering (3 years) Experience in installation,
BSc Engineering (5 years)
HND(10 years) maintenance and accuracy
checks of distribution network
meters (33 KV or below)
No of Education Competency
Employee
SCHEDULE 2C-QUALIFICATIONS OF INSTALLER OF
METERING SYSTEMS CLASS C
Rule 6(2)©
Qualifications of Installer of Metering System Class “C” Certificate
No of Education Competency
Employee
1 BSc Engineering (5 years) Experience in installation,
HND (10 years) maintenance and accuracy
checks of low voltage energy
meters of not more than 415V
1 BSc Engineering – 2 years 1. Experience and demonstra-
HND – 5 years ble ability to recognize and
Master Electrician – effectively deal with hazards
7 years related to low voltage wiring
Technician – 10 years 2. Competence in metering
systems installation, maintenance, calibration, trouble
shooting and repairs
2 MSc Engineering - 1years
BSc Engineering - 3years strable ability to recognize
HND - 7years and effectively deal with
hazards related to distribution
network metering panels
2. Competence in grid
metering systems installation,
maintenance, calibration,
trouble shooting and repairs
3. Ability to calculate meter
constraints, multipliers and
summation scheme values
4. Enhanced safety skills at
the distribution network level
3 BSc Engineering- 2 years
HND - 5 years
Master Electrician -10 years
Technician - 15 years
1. Experience and demon-
MADE this th day of , 2019.
MOHAMED D. B. SESAY,
Chairman
PRINTED AND PUBLISHED BY THE GOVERNMENT PRINTING DEPARTMENT, SIERRA LEONE
EXTRAORDINARY GAZETTE NO. 91 OF 13TH DECEMBER , 2019.
EXPLANATORY MEMORANDUM
(This explanatory memorandum is not part of these rules but is
intended to indicate its general purport)
The statutory instrument is made pursuant to section 66 of the Sierra
Leone Electricity and Water Regulatory Commission Act 2011.This
instrument is divided into 4 parts .
Part 1 covers the interpretation and application provisions. The
interpretation provision defines words and expressions used throughout
the instrument .The application provision stipulates that the instrument
applies to manufacturers, assemblers, importers and installers of energy
metering systems but does not apply to a licensee who undertakes
metering activities itself.
Part II covers provisions on application for certificate. The instrument
provides that no person should manufacture , assemble, import or install
electric meters or metering systems unless that person holds a certificate
issued by the Commission for that purpose.
Part III covers provisions on duration of certificates and other related
provisions
Part IV contains miscellaneous provisions.
3. Ability to calculate meter
constraints, multipliers and
summation scheme values
4. Safety skills at within a low
voltage wiring system
3 Technician – 7 years
Electrician – 5 years