Law library · Sierra Leone · Providers Rules 2019
Section 20, Providers Rules 2019
Status not yet checkedProviders Rules 2019, Sierra Leone
A person prior to the coming into effect of these rules who wasengaged in an activity requiring a certificate under these rules shall apply
for the relevant certificate within 3 months of the coming into effect of
these rules.
Offences
and
penalties.
Transitional
Provision.
SIERRA LEONE ELECTRICITY AND WATER REGULATORY
COMMISSION
PROVIDERS RULES, 2018
SCHEDULE 1A: APPLICATION FORM
FOR THE CERTIFICATION OF A MANUFACTURER OR
ASSEMBLER OF METERING SYSTEMS
Rule 7(2)(a)
Section A
Indicate type of Manufacturer Assembler
certificate
1. Full Name of Applicant
2. ID/Social Security No
3. Business name:
4. Address
5. Contact person
(if different from
applicant)
6. Telephone number
7. Email
8. Indicate whether new
application or renewal.
If renewal state current
Certificate Number.
9. List of key personnel
10. Qualification and
experience of key
personnel
11. List of relevant
documents attached
as required under
12. Description of electric
energy meter
a) Make:
b) Type: whether single
or three phase
13. Annual production capacity
14. Technical data
a)Nominal voltage;
b) Operating voltage;
c) Accuracy class
d) Current rating
e) Frequency;
d) Operating temperature;
e) Storage temperature;
f) Lifespan;
15. Purpose of manufacturing
or assembling
It is mandatory to provide the following information:
1. Business registration certificate
2. NRA Certificate
3. EIA Certificate
4. Type Test Certificate report
5. Meter Test Station Test report
6. Proof of existence or access to facilities
7. Others.
Name: Signature: Date:
SIERRA LEONE ELECTRICITY AND WATER REGULATORY
COMMISSION
PROVIDERS RULES, 2018
SCHEDULE 1B: APPLICATION FORM
FOR THE CERTIFICATION OF AN IMPORTER
IN METERING SYSTEMS
Rule7(2)(b)
Section A
1. Full Name of Applicant
2. ID/Social Security No.
3. Business name:
4. Address
5. Contact person (if different
from applicant)
6. Telephone number
7. Email
8. Indicate whether new
application or renewal.
If renewal state current
certificate number.
9. Names and particulars of
directors of company
10. List of relevant documents
attached as required under
11. Description of electric energy meter
a) Make:
b) Type: whether single or three phase
12. Estimated annual imports
13. Technical data
a)Nominal voltage;
b) Operating voltage;
c) Accuracy class;
d) Current rating;
e) Frequency;
d) Operating temperature;
e) Storage temperature;
f) Lifespan;
15. Purpose of importing/ main customers
It is mandatory to provide the following information:
1. Business registration certificate
2. NRA Certificate
3. Type test certificate report
4. Meter test station test report
5. Proof of existence or access to facilities
6. Others.
Name: Signature: Date:
SIERRA LEONE ELECTRICITY AND WATER REGULATORY
COMMISSION
PROVIDERS RULES, 2018
SCHEDULE 2A-QUALIFICATIONS
SCHEDULE 2A: QUALIFICATIONS OF INSTALLER OF
METERING SYSTEMS –CLASS A
Rule 6(2)(a)
Qualifications of Installer of Metering System Class “A” Certificate
No of Education Competency
Employee
2 (1) MSc Engineering Experience in installation,
(5 years) BSc maintenance and accuracy
Engineering checks of grid meters
(7 years) HND (above 33 KV)
(15 years)
3 (2) MSc Engineering – 1. Experience and
3years demonstrable ability to
BSc Engineering – recognize and effectively
5years deal with hazards related
HND – 10 years to grid metering panels
2. Competence in grid
metering systems
installation, maintenance,
calibration, trouble
shooting and repairs
3. Ability to calculate
meter constraints,
multipliers and summation scheme values
4. Enhanced safety skills
at grid level
4 (2) BSc Engineering–
3 years HND –
7 years Master
Electrician -15 years
Technician – 20 years
SCHEDULE 2B-QUALIFICATIONS OF INSTALLER OF
METERING SYSTEMS -CLASS B
Rule 6(2)(b)
Qualifications of Installer of Metering System Class "B" Certificate
1 MSc Engineering (3 years) Experience in installation,
BSc Engineering (5 years)
HND(10 years) maintenance and accuracy
checks of distribution network
meters (33 KV or below)
No of Education Competency
Employee
SCHEDULE 2C-QUALIFICATIONS OF INSTALLER OF
METERING SYSTEMS CLASS C
Rule 6(2)©
Qualifications of Installer of Metering System Class “C” Certificate
No of Education Competency
Employee
1 BSc Engineering (5 years) Experience in installation,
HND (10 years) maintenance and accuracy
checks of low voltage energy
meters of not more than 415V
1 BSc Engineering – 2 years 1. Experience and demonstra-
HND – 5 years ble ability to recognize and
Master Electrician – effectively deal with hazards
7 years related to low voltage wiring
Technician – 10 years 2. Competence in metering
systems installation, maintenance, calibration, trouble
shooting and repairs
2 MSc Engineering - 1years
BSc Engineering - 3years strable ability to recognize
HND - 7years and effectively deal with
hazards related to distribution
network metering panels
2. Competence in grid
metering systems installation,
maintenance, calibration,
trouble shooting and repairs
3. Ability to calculate meter
constraints, multipliers and
summation scheme values
4. Enhanced safety skills at
the distribution network level
3 BSc Engineering- 2 years
HND - 5 years
Master Electrician -10 years
Technician - 15 years
1. Experience and demon-
MADE this th day of , 2019.
MOHAMED D. B. SESAY,
Chairman
PRINTED AND PUBLISHED BY THE GOVERNMENT PRINTING DEPARTMENT, SIERRA LEONE
EXTRAORDINARY GAZETTE NO. 91 OF 13TH DECEMBER , 2019.
EXPLANATORY MEMORANDUM
(This explanatory memorandum is not part of these rules but is
intended to indicate its general purport)
The statutory instrument is made pursuant to section 66 of the Sierra
Leone Electricity and Water Regulatory Commission Act 2011.This
instrument is divided into 4 parts .
Part 1 covers the interpretation and application provisions. The
interpretation provision defines words and expressions used throughout
the instrument .The application provision stipulates that the instrument
applies to manufacturers, assemblers, importers and installers of energy
metering systems but does not apply to a licensee who undertakes
metering activities itself.
Part II covers provisions on application for certificate. The instrument
provides that no person should manufacture , assemble, import or install
electric meters or metering systems unless that person holds a certificate
issued by the Commission for that purpose.
Part III covers provisions on duration of certificates and other related
provisions
Part IV contains miscellaneous provisions.
3. Ability to calculate meter
constraints, multipliers and
summation scheme values
4. Safety skills at within a low
voltage wiring system
3 Technician – 7 years
Electrician – 5 years
Read the whole lawDownload PDFAsk Tima what this means
Check the current official version before relying on this text. MiLAWYER shares legal information, not legal advice.