Law library · Sierra Leone · Commission (Mini Grid ) Regulations, 2019
Schedule 2, Commission (Mini Grid ) Regulations, 2019
Status not yet checkedCommission (Mini Grid ) Regulations, 2019, Sierra Leone
Regulation 8 (1) (b)
Application form for full mini-grid licence
IMPORTANT NOTES: Your application is incomplete unless all required
documents are submitted.
SLEWRC reserves the right to verify the accuracy
of this information.
The full mini-grid licence, if approved by SLEWRC
Commission, will be valid for a duration up to
twenty (20) years and may be renewed or extended
by the Commission beyond that time following
procedure described in the Regulations.
In compliance with the SLEWRC Mini-Grid Regulations, 2019I............[name of
representative] certify that, [name of company] .............................................
isintending to construct, install and/or start to operate a mini-grid system for the
provision of electricity on [date] ........................, and hereby applies to register
theproject as a mini-grid for a full mini-grid licence pursuant to the SLEWRC Mini-
Grid Regulations, 2019.
1.0 PARTICULARS OFAPPLICANT AND CONTACT PERSON
Name of applicant:..............................................................................................................
Physical address:................................................................................................................
Postal address:.....................................................................................................................
Tel:........................................................................................................................................
Fax:..........................................................................................................................................
Mobile phone:.....................................................................................................................
E-mail:...................................................................................................................................
Website address:.................................................................................................................
Name of contact person:...................................................................................................
Mobile phone of contact person:.....................................................................................
E-mail of contact person:....................................................................................................
2.0 LEGAL STATUS OFAPPLICANT
2.1 Indicate legal status of applicant (tick relevant option)
A. Sole proprietorship
B. Partnership
C. Company Limited by Shares (Private)
D. Company Limited by Shares (Public)
E. Cooperative society
F. Other (please specify)
2.2 List and particulars of directors:
Name Nationality Address Expiry date of tenure
3.0 NATURE OFAPPLICATION
3.1 State whether application is a new application.
3.2 Existing Licence
Does the applicant have an existing basic or full mini-grid licence issued by the
commission for other systems?
If yes, state the nature of the licence, date issued and the licence.
3.3 Refusal, Suspension or cancellation of licence
Has the applicant ever been refused a licence or had its licence suspended and/or
cancelled by the Commission?
If yes, give details of the refusal, suspension, and/or cancellation.
4.0 MAIN BUSINESS ACTIVITIES OFAPPLICANT
Please indicate the main business activities the applicant is currently engaged in.
5.0 DESCRIPTION OF PROJECT
Detailed description of the project:
5.1 Site of the mini-grid
Village:.............................. Ward:......................
Chiefdom:...................... District:..............
5. 2 Generation
Solar .................kW
Wind .................kW
Generation Biomass .................kW
Hydro .................kW
Diesel .................kW
other: .................kW
Total: .................kW
Storage ................. .............. kWh
Inverters ................. .............. kWh
Terminal Voltage .................v
Rated Frequency .................Hz
Expected Annual .................kWh/year
Generation (kWh/year)
Location of the power plant (geographical coordinates / GPS):
Is the power plant new? If no, please state number of years the plant has been in
operation. If yes, please state the expected date of commissioning.
5. 3 Distribution
Three-phase MV ........... metres
Lines Single phase LV ........... metres
Three-phase LV ........... metres
Total: ........... metres
Type of Lines Overhead
Underground
Concrete ............... poles
Wood ............... poles
Poles Steel ............... poles
Other: ................. ............... poles
Total: ............... poles
Transformers ............... type
............... number ............... kVA
Length of distribution network (indicate geographical coordinates of four reference
points)
5.4 Consumers
Number of consumers:
Residential:.............................. Commercial:..............................
Productive/Industrial:.................... Health Centres:...........................
Schools:............................. Street lighting:............................
Other (please specify): ...................................................
5.5 Electricity sales
Expected electricity sales [kWh/year]:
6.0 DECLARATION BY THE APPLICANT
The project is not unlawful or contrary to the interest of Sierra Leone, the National
Electricity Act, 2011, the SLEWRC Act, 2011 and relevant SLEWRC Regulations. I/
we hereby declare that the details stated above are, to the best of my/our knowledge,
true and correct.
Dated this..................... day of ........................................... 20................
THE COMMON SEAL OF THE WITHIN NAMED APPLICANT
Name of Applicant Signature
Has hereunto been affixed in the presence of:
Sign: Sign:
Name: Name:
Designation: Designation:
Sworn to this...................... day of..............................................................20............at
72 73
FOR OFFICIAL USE ONLY
Date of submission of application:.....................................................................................
Fees paid and receipt Number:.........................................................................................
Results of verification for completeness:.......................................................................
Recommendation of SLEWRC Legal Division: ..............................................................
Recommendation of SLEWRC Head of Electricity: ......................................................
Decision of SLEWRC:........................................................................................................
Issue date of licence: .........................................................................................................
Expiration date of licence: ...................................................................................................
Other relevant information: .............................................................................................
ACCOMPANYINGDOCUMENTATION
1. Completed application Form
2. MoU between proposed mini-grid developer and GoSL / site confirmation
from Ministry of Energy
3. Power station layout drawings
4. Map with position of power station and distribution network marked using
indicators to distinguish single phase and three phase as well as medium
voltage networks
5. Certified copy of certificate of incorporation,
6. Memorandum and articles of association, deed of partnership or deed of
trust (as applicable),
7. Tax & NASSIT registration certificates
8. Agreement for land occupancy or land lease for project site
9. Environmental Protection Agency (EPA)permit, permission, licence, approval
or similar document or confirmation for exemption as is required by EPA for
this project
10. Signed health and safety guidelines
11. Financing Agreements
12. Business Plan or Feasibility Study outlining among others the operational
concept
13. Work plan
Read the whole lawDownload PDFAsk Tima what this means
Check the current official version before relying on this text. MiLAWYER shares legal information, not legal advice.