Law library · Sierra Leone · Subsidiary legislation
Materials and Equipments) Rules 2019
Status not yet checkedSubsidiary legislation · 28 provisions
Sign in to download the PDFAsk Tima about this lawCases on this law
Contents
- Preamble
- Section 1 — In these rules, unless the context otherwise requires -
- Section 2
- Section 3
- Section 4
- Section 5 — (1) The Commission shall-
- Section 6
- Section 7
- Section 8
- Section 9
- Section 10
- Section 11
- Section 12
- Section 13
- Section 14
- Section 15 — The holder of a manufacturing certificate shall ensure that –
- Section 16
- Section 17
- Section 18
- Section 19
- Section 20 — The Commission may-
- Section 21
- Section 22
- Section 23 — A person who –
- Section 24
- Schedule 3
- Schedule 4
- Schedule 5
CERTIFICATION (ELECTRICAL CONTRACTORS,
MANUFACTURERS AND IMPORTERS OF ELECTRICAL
MATERIALS AND EQUIPMENTS) RULES 2019
In exercise of the powers conferred upon it by section 66 of the
Sierra Leone Electricity and Water Regulatory Commission Act 2011, the
Commission makes the following rules-
PART I-PRELIMINARY
“Act” means the Sierra Leone Electricity and Water
Regulatory Commission Act, 2011 ;
“approved standard” means a standard adopted or
recommended by the Standards Bureau for application in
Sierra Leone ;
“artisan” means an electrician who is qualified through an
apprenticeship programme and has been certified;
“associate engineer” means a person with the technical
school certificate Level 4 of NCTVA certified for level 4 in
construction or the equivalent in a relevant field;
“consultant” means an engineer or engineering company
which has been issued with a certificate to provide
services relating to the design, engineering, procurement
and construction or project supervision;
“contractor” means an individual or a company that has
been certified to undertake electrical or electromechanical
contracting, including installation and maintenance;
“contracting company” means an electrical or electromechanical entity which is registered with the
related trades certificate;
“Council” means the Sierra Leone Professional Engineers
Registration Council established under section 2 of the
Professional Engineers Act 1990;
“electrical activity” includes electrical design, installation,
maintenance, testing, inspection, contracting, consultancy,
inspection and the manufacture and importation in various
electric electrical goods and materials;
“electrical professional” means an engineer of all classes or
a technician of all grades or both that has an electrical or
relevant technical educational qualification of a degree,
diploma or certificate in electrical or technical training;
“engineer” means a person with a Bachelor of Science or
engineering degree or higher or an equivalent qualification in an approved course in electrical or mechanical
engineering from a recognized university or equivalent
institution and is a member of the Professional Engineers of
Sierra Leone and is duly recognized as such by the Council;
“experience” means verifiable previous personal
involvement in or practice of electrical or electromechanical and other related activities;
“import” means the importation of electrical goods and
materials;
“importer” means a person certified to import electrical
goods and materials;
“inspector” means a person certified to undertake the
inspection and testingof new, existing or rehabilitated
facilities;
“junior technician” means a person who has completed the
Level 1 of NCTVA and successfully undergone at least six
months of technical training from a recognised training
centre or a supervised mentorship or apprenticeship
programme;
“manufacturer” means a person certified to produce
electrical goods and materials;
“NCTVA” means the National Council for Technical,
Vocational and Other Academic Awards established under
the National Council for Technical, Vocational and Other
Academic Awards Act 2001;
“material and equipment” include electrical plant,
equipment, cable, wires and appliances;
“senior technician” means a person with the technical
school certificate Level 3 of NCTVA certified for level 3 in
construction or the equivalent in a relevant field;
“technician” means a person with the technical school
certificate Level 2 of NCTVA certified for construction or
the equivalent in a relevant field.
These Rules shall apply to electrical professionals or electricalcompanies that undertake-
(a) electrical activities which includes–
(i) electrical design;
(ii) installation;
(iii) maintenance;
(iv) testing;
(v) inspection;
(vi) contracting;
(vii) consultancy;
(b) electromechanical activities;
(c) manufacture of electrical goods and materials;
(d) importation of electrical goods and materials.
Application.
PART II- APPLICATION FOR CERTIFICATE AND OTHER
RELATED PROVISIONS
A person shall not undertake any activity under these rulesunless that person holds a certificate issued by the Commission for that
specific purpose.
(1) A person wishing to undertake any activity under theserules shall submit a written application to the Commission in the
prescribed form.
(2) A person applying for an-
(a) electrical professional certificate shall fill
out the form set out in Schedule 1-A;
(b) electrical contractor’s certificate shall fill out
the form set out in Schedule 1-B;
(c) electrical consultant or inspector’s certificate
shall fill out the form set out in Schedule 1-C;
(d) electrical manufacturer’s certificate shall fill
out the form set out in Schedule 1-D;
(e) importers certificate shall fill out the form set
out in Schedule 1-E.
(3) The applicant shall –
(a) attach all relevant documentation to the
application form;
(b) sign the application and address it to the Commission ;
(c) pay the prescribed fee as determined by the
Commission and published in the Gazette; and
(d) deliver the application by post or email .
(a) acknowledge receipt of the application made
under rule 4 within 10 days of receiving the
application;
Requirement for a
certificate.
Application
for certificate.
Issuance of
certificate
(b) inform the applicant in writing of its decision
within 30 days of receiving the application.
(2) The Commission shall issue a certificate to the
successful applicant subject to the applicant meeting the requirement set
out in the Act or statutory instruments made under the Act.
(3) Where the Commission refuses the application it shall
communicate its decision to the applicant within 30 days stating the
reasons for the refusal.
Subject to these rules the Commission shall issue any of thefollowing certificate –
(a) electrical professional's certificate;
(b) electrical contractor's certificate;
(c) consultant or inspector's certificate;
(d) manufacturer's certificate; and
(e) importer's certificate.
The applicant whose application is successful shall pay thecertificate fee as determined by the Commission and published in the
Gazette.
(1) A certificate issued under these rules shall be valid for aperiod of 3 years in the case of an individual and 5 years in the case of a
corporate body.
(2) A certificate may be renewed at the end of its term
subject to the holder complying to the terms and conditions of the
certificate.
A holder of a certificate shall pay an annual fee as determinedby the Commission and published in the Gazette.
(1) The Commission may suspend or cancel a certificatewhere it is satisfied that -
(a) the holder has contravened a term or condition
of the certificate;
Types of
Certificate.
Certificate
Fee.
Duration of
Certificate.
Annual fee.
Suspension
or cancellation of
certificate.
(b) the holder has given information to the
Commission which is false or misleading;
(c) it is in the public's interest to do so.
(2) When the Commission has grounds for the suspension
or cancellation of a certificate it shall notify the holder of its intention and
shall give the holder an opportunity to show cause why the certificate
should not be suspended or cancelled.
(3) Where the holder of the certificate is unable to persuade
the Commission or fails to respond to the notice, the Commission shall
proceed to suspend or cancel the certificate in accordance with section 35
of the Act.
(4) The Commission shall restore the certificate when the
holder remedies the defect that gave rise to the cancellation or suspension.
PART III-
ELECTRICAL PROFESSIONAL'S CERTIFICATION
(1) The Commission shall categorise the electricalprofessional's certification into the following categories-
(a) engineer;
(b) associate engineer;
(c) senior technician;
(d) technical;
(e) junior technical
(f) artisan
(2) The Commission shall classify the categories outlined
under sub-rule (1) in accordance with the applicant's education and
experience as follows-
(a) Class A;
CATEGORIES OF CERTIFICATE
Professional's
Certification.
(b) Class B;
(c) Class C; and
(d) Class D
(3) The qualification criteria for each class outlined under
sub-rule (2) shall be as set out under Schedule 2A.
(4) The technical work limit for each class of electrical
professionals shall be as set out under Schedule 2B.
ELECTRICAL CONTRACTOR'S CERTIFICATION
(1) The Commission shall categorise the electricalcontractor's certification into the following categories-
(a) Class1;
(b) Class 2;
(c) Class 3;
(d) Class 4;
(e) Class 5 .
(2) The qualification criteria for each class outlined under
sub-rule (1) shall be as set out under Schedule 2C.
(3) The technical work limit for each class of electrical
contractors shall be as set out under Schedule 2D.
(4) The criteria for evaluating contractors shall be as set out
in Schedule 3.
(5) The personnel and equipment requirement for
contractors shall be as set out in Schedule 4.
ELECTRICAL CONSULTANT CERTIFICATION
(1) The Commission shall categorise the electricalconsultant's certification as follows-
Contractor's
Certification.
Consultant's
Certification.
(a) Class A;
(b) Class B.
(2) The qualification and experience criteria for each class
of electrical consultant shall be as set out under Schedule 2E and Schedule
5 respectively.
(3) The technical work limit for each class of electrical
consultant shall be as set out under Schedule 2F.
ELECTRICAL INSPECTOR'S CERTIFICATION
(1) The Commission shall categorise the electricalinspector's certification as follows-
(a) Class A;
(b) Class B.
(2) The qualification and experience criteria for each class
of electrical Inspectors shall be as set out under Schedule 2G and Schedule
(3) The technical work limit for each class of electrical
inspectors shall be as set out under Schedule 2H.
(4) The Commission shall establish guidelines determining
the framework for inspection of electrical installations and works.
ELECTRICAL MANUFACTURER CERTIFICATE
(a) the material and equipment produced meet the
Sierra Leone or approved international
standard;
(b) it employs competent personnel of the requisite
qualification for the type of material and
equipment produced and nature of processes
undertaken;
Inspector's
Certification.
Manufacturer.
(c) there are adequate facilities for the storage of
material and equipment for undertaking the
business;
(d) sound environmental principles are observed
during its operations; and
(e) the manufacturing is undertaken with due
regard to health and safety of the workmen and
the public.
ELECTRICAL IMPORTER'S CERTIFICATE
(1) The holder of an electrical importer's certificate shallensure that -
(a) the goods and material imported meet the Sierra
Leone or approved international standards; and
(b) an adequate requirement of qualified personnel
and facilities are employed in his business.
PART IV-EXAMINATION
(1) The Commission may examine an applicant through awritten examination, performance test and if it deems it necessary a
practical test before the certificate is upgraded or granted.
(2) The Commission shall develop or appoint a professional
entity to develop a curriculum for the training and continuous education
and examination of electrical professionals.
(3) The outline of the curriculum referred to in sub-rule(2)
shall be based on the technical codes, standards and rules of practice of the
electricity sector.
(4) The Commission may establish a Committee to be
known as the Electrical Works Certification Committee which shall be
responsible for conducting the written examination, performance and
practical tests or.
(5) The Commission may outsource the responsibility of
conducting the written examination, performance and practical tests to an
appropriate external professional or educational body.
Importer.
Evaluation
and
Grading.
(1) The Commission shall notify the applicant in writing ofthe applicant's written examination, performance and practical tests
results.
(2) An applicant who is not successful in a written
examination, performance and practical tests conducted by the
Commission may re-take the written examination, performance or
practical test after six months from the publication of the results.
An applicant who has served a minimum10 years with agovernmental agency, licenced public utility company or other relevant
organization may apply to the Commission to waive the written
examination, performance and practical test requirements.
(a) issue guidelines on the procedures for written
nation and examination, performance and
practical tests;
(b) set criteria for waiving the written
examination performance and practical tests.
PART V-MISCELLANEOUS PROVISIONS
(1) The holder of a certificate shall submit an annual reportto the Commission on its activities for each operation
(2) The report referred to under sub-rule (1) shall be
submitted before the end of the first quarter of the following year.
(1) The Commission shall maintain a register of certifiedpersons and the type of services they are qualified to perform.
(2) The Commission shall publish the list of certified
persons in the Gazette.
(a) is not a holder of a certificate issued by the
Commission and undertakes any activity for
which a certificate is required under these rules;
Examination
results and
resit.
Waiving
examination require
-ments.
Guidelines
for examination and
tests.
Reporting
Requirements.
Register.
Offences.
(b) employs persons without a certificate to
undertake any activity for which a certificate is
required under these rules;
(c) obstructs a member of the Commission or
authorised officers of the Commission in the
exercise of their duties under the Act or these
rules,
(d) fails to comply with other provisions of these
rules.
commits an offence punishable under section 65 of the Act.
A person who prior to the commencement of these ruleswas engaged in an activity requiring a certificate under these rules shall
within 3 months of the coming into effect of these rules apply for the
relevant certificate.
Transitional
Provision.
SCHEDULE - 1A Rule 4(2)(a)
APPLICATION FORM FOR CERTIFICATE FOR ELECTRICAL
PROFESSIONALS
Please fill entire form; add Receipt of Application Fee and 2 Photographs
PART 1 - TYPE OF CERTIFICATE
1. Certificate that applicant is seeking: please check as applicable
Engineer Class A Class B Class C
Associate Engineer Class B Class C
Senior Technician Class B Class C Class D
Technician Class B Class C Class D
Junior Technician ClassC Class D
Artisan Class C Class D
PART 2
2. Applicant's personal information
1. Full Name:
2. Date of Birth:
3. ID / Social Security No.:
4. Address:
5. TIN:
6. Telephone No.:
7. Email:
PART 3
3. Applicant's educational record
Type of Training Dates School or Institute Diploma or Degree
PART 4
4. Professional experience
Type of certificate held Issuing Authority Certificate No Issue date
PART 5
5. Verifiable Work Experience: Indicate capacity and nature of practical
electrical work performed
Description of Job Time in Months Employer Contact Person's
details
PART 6
6. References: Provide names of references in the Electrical Industry to
be used as references
Reference Address and Telephone No.
PART 7
7. Remarks: Provide additional information on training and work
experience which can help the EWRC
___________________________ _________________
Signature of Applicant and Title Date
SCHEDULE 1-B Rule 4(2)(b)
APPLICATION FORM FOR ELECTRICAL CONTRACTORS'
CERTIFICATE
PART A
Please fill entire form and add receipt of Application Fee
1. ELECTRICAL CONTRACTOR
Indicate Class 1 – 5
2. Full Name of Presenter:
3. ID / Social Security No.:
4. Business Name:
5. Type of Ownership
Sole Proprietorship Partnership Limited Partnership Limited
Liability Company
5. Mailing Address: (please use P.O. Box):
6. Physical Address: (location address):
7. Phone No.: 8. Fax No.:
9. Email Address:
10. Contact Person if different from presenter:
Name: _________________________________________________
11. Details of Each Director of Company:
Name/Address/Telephone number
a)
b)
c)
12. Liability Insurance:
Evidence of adequate insurance cover (A certificate of insurance MUST
be attached to the application):
13. Workmen's compensation insurance:
Available Not Available
If available state limit:
14. Electrical Professional employed by the Contractor:
I agree to assign my certificate to the contractor and affirm that I shall
comply with all the applicable laws relating to electricity and any other
Standards in force in Sierra Leone, at any given time.
revocation of my certificate.
(A contractor MUST be or employ at least or be a certified Technician to
qualify)
Name: ________________________Certificate of Competence No.:____________
Signature: ___________________ Date signed: ______________
15. Key staff (if corporate applicant):
Electrical professionals:
Managerial staff:
Other professionals:
(Attach list and profiles of key staff)
16. STATEMENT OF OWNER/CHIEF EXECUTIVE
I certify that I shall maintain the required insurance and that I shall comply
with all the applicable laws relating to electricity and any other Standards in
force in Sierra Leone, at any given time.
revocation of the certificate. I am requesting.
Name:_______________________________________________________
Signature: ______________________ Date Signed: ______________
PART B
Additional Information requirement for corporate bodies
(1) A corporate applicant shall provide the following additional
information in respect of the application for a certificate, as shall be
relevant:
a. a business registration certificate;
b. particulars of facilities and equipment;
c. annual reports for preceding two years including a financial
statement and a summary of electrical industry activities
undertaken during the period;
d. list of sub-contractors, if any;
e. evidence of insurance cover for personnel, equipment and
facilities
.
(2) Where the electrical contracting company has been in existence for less
than two (2) years, the Commission may rely on the individual
experience of the key professional staff in lieu of the corporate
experience of the company and the written references from the clients of
such employees or a former employer.
(3) With regard to an application for a certificate for the manufacture of
electrical material and equipment, including the manufacture of electric
lamps and lighting equipment the applicant shall provide the related
Environmental Impact Assessment study.
SCHEDULE 1-C Rule 4 (2)(c)
APPLICATION FORM FOR CONSULTANTS AND INSPECTORS
1. CONSULTANT
Indicate Class A or B Indicate Class A or B
2. Full Name of Presenter:
3. ID / Social Security No.:
4. Business Name:
5. Type of Ownership
Sole Proprietorship Partnership Limited Partnership
Limited Liability Company
5. Mailing Address: (please use P.O. Box):
6. Physical Address: (location address):
7. Phone No.: 8. Fax No.:
9. Email Address:
10. Contact Person if different from presenter:
Name: __________________________________________________
11. Details of Each Director (if a corporate body):
Name/Address/Telephone number
a)
b)
c)
12. Liability Insurance:
Evidence of adequate insurance cover (A certificate of insurance MUST
be attached to the application)
13. Workmen's compensation insurance:
Available Not Available
If available state limit:
15. Key staff (if corporate applicant):
Electrical professionals:
Managerial staff:
Other professionals:
(Attach list and profiles of key staff)
INSPECTOR
16. STATEMENT OF OWNER/CHIEF EXECUTIVE
I certify that I shall maintain the required insurance and that I shall
comply with all the applicable laws relating to electricity and any other
Standards in force in Sierra Leone, at any given time.
I understand that providing false information on this application or in
any report to the Commission may result in civil or criminal penalties or
a revocation of the certificate. I am requesting.
Name:___________________________________________________
Signature: __________________ Date Signed: _________________
SCHEDULE 1-D rule 4(2)(d)
APPLICATION FORM FOR MANUFACTURER OF
ELECTRICAL EQUIPMENT CERTIFICATE
Please fill entire form and add Application Fee
1. Full Name of Presenter:
2. ID / Social Security No.:
3. Business Name:
4. Type of Ownership
Sole Proprietorship Partnership Limited Partnership Limited
Liability Company
5. Mailing Address: (please use P.O. Box):
6. Physical Address: (location address):
7. Phone No.:
9. Email Address:
10. Contact Person:
Name: __________________________________________________
11. Indicate material and equipment category:
(a) cables, wires, appliances.
(b) electrical motors and accessories.
(c) Other (specify)
12. Statement of owner/Chief Executive
I certify that I shall maintain the required insurance and that I shall comply
with all the applicable laws relating to electricity and any other Standards in
force in Sierra Leone, at any given time.
revocation of the certificate.
Name:___________________________________________________
Signature:___________________ Date Signed: __________________
An applicant for a manufacturer's certificate shall provide the following
additional information in respect of the application for a certificate -
(a) a business registration certificate;
(b) particulars of education and experience of key professional
staff;
(c) particulars of facilities and equipment;
(d) annual reports for preceding 2 years including a financial
statement and a summary of electrical industry activities
undertaken during the period;
(e) list of sub-contractors, if any;
(f) evidence of insurance cover for personnel, equipment and
facilities; and
(g) Environmental Impact Assessment study and related
certificate from EPA.
SCHEDULE 1-E
rule 4(2)(e)
APPLICATION FORM FOR AN IMPORTER OF ELECTRICAL
MATERIALS AND EQUIPMENT CERTIFICATE
Please fill entire form and add Application Fee
1. Certificate Type:
2. Business Name:
3. National ID No.:
4. Type of Ownership
Sole Proprietorship Partnership Limited Partnership Limited
Liability Company
5. Mailing Address: (please use P.O. Box):
6. Physical Address: (location address):
7. Phone No.: 8. Fax No.:
9. Email Address:
10. Contact Person:
Name: __________________________________________________
11. Indicate material and equipment imported:
(a) Generation equipment, including generation sets
(b) Transmission and Distribution equipment
(c) Cables, wires, appliances
(d) Motors and accessories
12. The source and specification of the material and equipment:
13. STATEMENT OF OWNER
I certify that I shall maintain the required insurance and that I shall comply
with all the applicable laws relating to electricity and any other Standards
in force in Sierra Leone, at any given time.
revocation of the certificate,
Name:____________________________________________________
Signature:___________________ Date Signed: ________________
A corporate applicant for a certificate to import electrical material and
equipment shall provide the following additional information in respect
of the application for a certificate-
(a) business registration certificate;
(b) particulars of facilities and equipment; and
(c) annual reports for preceding 2 years including a financial
statement and a summary of electrical industry activities
undertaken during the period.
SCHEDULE 2-A
rule 11(3)
CLASSES OF ELECTRICAL PROFESSIONALS
QUALIFICATION AND EXPERIENCE
Category of Electrical Years' Experience
Professional
Education Class A Class B Class C Class D
Engineer & PhD 2 1 0 0
Consultant Msc 4 2 1 0
Bsc 6 4 2 0
Engineering Level 4 - 6 4 0
Technician
Technician Level 3 - 10 6 2
Assistant Level 2 - 12 8 4
Technician
Artisan Level - - 12 6
SCHEDULE 2-B
Rule 11(4)
TECHNICAL WORK LIMITS OF ELECTRICAL
PROFESSIONALS
Activity Limit / Grade Class A Class B Class C Class D
Maximum Demand No Limit 500KVA 200KVA 12 KVA
Transmission No Limit High Voltage Medium Low
Voltage Voltage
Generation Plant No Limit 100 MW 10 MW -
SCHEDULE 2C-ELECTRICAL CONTRACTOR-
QUALIFICATION
Rule 12(2)
CLASS QUALIFICATION
Class 1 contractor Minimum qualification requirements as set
Class 2 contractor Minimum qualification requirements as set
Class 3 contractor Minimum qualification requirements as set
Class 4 contractor Minimum qualification requirements as set
Class 5 contractor Minimum qualification requirements as set
SCHEDULE 2D
ELECTRICAL CONTRACTOR-TECHNICAL WORK LIMITS
Rule 12(3)
CLASS TECHNICAL WORK LIMITS
Class 1 contractor No work limit
Class 2 contractor Shall work within a technical limit of 50MW,
high voltage Transmission Networks,
maximum demand of 650 KVA
Class 3 contractor Technical limit of 5MW, medium voltage
transmission networks, a maximum demand
of 315KVA
Class 4 contractor Undertake electrical works in respect of
commercial, industrial and residential
facilities
Class 5 contractor Undertake electrical works in respect of
residential homes
SCHEDULE 2E
ELECTRICAL CONSULTANT-QUALIFICATION
Rule 13(2)
CLASS QUALIFICATION
Class A Minimum qualification set out in Schedule 5-1A
Class B Minimum qualification set out in Schedule 5-1B
SCHEDULE 2F
ELECTRICAL CONSULTANT'S -TECHNICAL WORK LIMITS
Rule 13(3)
CLASS TECHNICAL WORK LIMITS
Class A no work limit
Class B Work within a technical limit of 10MW, medium
voltage transmission networks, maximum demand of
315KVA
SCHEDULE 2G
ELECTRICAL INSPECTOR'S-QUALIFICATION
Rule 14(2)
CLASS QUALIFICATION
Class A Minimum qualification set out in parts A and B of
Schedule 5-2A
Class B Minimum qualification requirement set out in parts A
and B of Schedule 5-2B
SCHEDULE 2H
ELECTRICAL INSPECTOR'S-TECHNICAL WORK LIMITS
Rule 14(3)
CLASS TECHNICAL WORK LIMITS
Class A no work limit
Class B Inspect commercial and residential premises
CRITERIA FOR EVALUATION OF CONTRACTORS
Rule 12(4)
Part 1: Criteria for Grading of New Contractors
1. Scope of works for each class based on generation capacity level,
transmission or distribution levels which are ultra-high Voltage, high
voltage, medium voltage and low voltage and load size in kVA
capacity
2. Number of qualified professional employed by the organization
3. Size and layout of office facilities
4. Transport and plant, machinery, equipment capacity as needed for
undertaking jobs professionally
5. Value of projects handled
6. Availability of relevant applicable laws, regulations, codes, technical
manuals, procedural manuals
7. Testing and measurement equipment
8. Insurance policy
Part 2: Criteria for Grading and Upgrading Contractors
1. Financial soundness from bank statement or Working Capital
availability such as overdraft facility from bank and fixed deposits
receipts with banks
2. Value of assets
3. Track record and evidence of works
4. Financial capability from tax clearance, equity, liability and credit
statements and guarantee
5. Insurance guarantee
PERSONNEL AND EQUIPMENT REQUIREMENT
FOR CONTRACTORS
Rule 12(5)
Section A: Personnel Requirements for Contractors (number of
personnel per class of contractor)
Item Professional Staff Classes
5 4 3 2 1
1 Class A
2 Class B
3 Class C
4 Class D
Section B: Facility and equipment requirements for electrical contractor
No Requirement Quantity for each Class
Item Specification D C B A
(if any)
1 Facility
1.1 Office Floor Area
1.2 Floor Area
1.3 Workshop Floor Area
1.4 Floor Area
2 Vehicles and Heavy Equipment
2.1
2.2
2.3
2.4
2.5
3 Workshop Machinery
3.2
3.3
3.4
3.5
4 Hand Tools & Personal Safety Gear
5 Measurement Equipment
QUALIFICATION AND EXPERIENCE REQUIREMENT FOR
CONSULATANTS AND INSPECTORS
Rule 13(2), 14(2)
Item Description Class
1 2
Engineer Class A
Engineer Class B
Engineer Class C
Engineer Class D
An inspector shall in addition comply with the following:
a. Wiring Rules relating to Electricity and the Light and Power
Rules of Sierra Leone
b. BS7671 17th Edition of the IEE Wiring Regulation
c. BS7430 Code of Practice for Earthing
d. BS6651 Code of Practice for Lightening Protection
PRINTED AND PUBLISHED BY THE GOVERNMENT PRINTING DEPARTMENT, SIERRA LEONE
EXTRAORDINARY GAZETTE NO. 91 OF 13TH DECEMBER , 2019.
EXPLANATORY MEMORANDUM
(This explanatory memorandum is not part of these rules but is
intended to indicate its general purport)
This statutory instrument is made pursuant to section 66 of the Sierra
Leone Electricity and Water Regulatory Commission Act 2011.This
instrument is divided into 5 parts .
Part 1 covers the interpretation and application provisions. The
interpretation provision defines words and expressions used throughout
the instrument .The application provision stipulates that the instrument
applies to electrical professionals or electrical companies that undertake
the following activities
(a) Electrical activities which includes –
(i) Electrical design;
(ii) Installation;
(iii) Maintenance;
(iv) Testing
(v) Inspection
(vi) Contracting
(vii)Consultancy
(b) Electromechanical activities;
(c) Manufacture of electrical goods and materials ;
(d) Importation of electrical goods and materials
Part II covers provisions relating to the application for a certificate. The
instrument provides that no person should undertake any activity
prescribed under the instrument unless the person holds a certificate
issued by the Commission for that purpose.
Part III covers provisions on the categories and classes of certificates
Part IV covers provisions on evaluation and training
Part V contains miscellaneous provisions. The instrument criminalises
among other things actions that are undertaken without certification.
MADE this th day of , 2019.
MOHAMED D. B. SESAY,
Chairman
Check the current official version before relying on this text. MiLAWYER shares legal information, not legal advice.