Law library · Sierra Leone · Materials and Equipments) Rules 2019
Schedule 4, Materials and Equipments) Rules 2019
Status not yet checkedMaterials and Equipments) Rules 2019, Sierra Leone
PERSONNEL AND EQUIPMENT REQUIREMENT
FOR CONTRACTORS
Rule 12(5)
Section A: Personnel Requirements for Contractors (number of
personnel per class of contractor)
Item Professional Staff Classes
5 4 3 2 1
1 Class A
2 Class B
3 Class C
4 Class D
Section B: Facility and equipment requirements for electrical contractor
No Requirement Quantity for each Class
Item Specification D C B A
(if any)
1 Facility
1.1 Office Floor Area
1.2 Floor Area
1.3 Workshop Floor Area
1.4 Floor Area
2 Vehicles and Heavy Equipment
2.1
2.2
2.3
2.4
2.5
3 Workshop Machinery
3.2
3.3
3.4
3.5
4 Hand Tools & Personal Safety Gear
5 Measurement Equipment
Read the whole lawDownload PDFAsk Tima what this means
Check the current official version before relying on this text. MiLAWYER shares legal information, not legal advice.