MiLAWYER

Law library · Sierra Leone · Materials and Equipments) Rules 2019

Schedule 4, Materials and Equipments) Rules 2019

Status not yet checkedMaterials and Equipments) Rules 2019, Sierra Leone

PERSONNEL AND EQUIPMENT REQUIREMENT FOR CONTRACTORS Rule 12(5) Section A: Personnel Requirements for Contractors (number of personnel per class of contractor) Item Professional Staff Classes 5 4 3 2 1 1 Class A 2 Class B 3 Class C 4 Class D Section B: Facility and equipment requirements for electrical contractor No Requirement Quantity for each Class Item Specification D C B A (if any) 1 Facility 1.1 Office Floor Area 1.2 Floor Area 1.3 Workshop Floor Area 1.4 Floor Area 2 Vehicles and Heavy Equipment 2.1 2.2 2.3 2.4 2.5 3 Workshop Machinery 3.2 3.3 3.4 3.5 4 Hand Tools & Personal Safety Gear 5 Measurement Equipment

Read the whole lawDownload PDFAsk Tima what this means

Check the current official version before relying on this text. MiLAWYER shares legal information, not legal advice.