Schedule 3, Materials and Equipments) Rules 2019
Status not yet checkedMaterials and Equipments) Rules 2019, Sierra Leone
CRITERIA FOR EVALUATION OF CONTRACTORS
Rule 12(4)
Part 1: Criteria for Grading of New Contractors
1. Scope of works for each class based on generation capacity level,
transmission or distribution levels which are ultra-high Voltage, high
voltage, medium voltage and low voltage and load size in kVA
capacity
2. Number of qualified professional employed by the organization
3. Size and layout of office facilities
4. Transport and plant, machinery, equipment capacity as needed for
undertaking jobs professionally
5. Value of projects handled
6. Availability of relevant applicable laws, regulations, codes, technical
manuals, procedural manuals
7. Testing and measurement equipment
8. Insurance policy
Part 2: Criteria for Grading and Upgrading Contractors
1. Financial soundness from bank statement or Working Capital
availability such as overdraft facility from bank and fixed deposits
receipts with banks
2. Value of assets
3. Track record and evidence of works
4. Financial capability from tax clearance, equity, liability and credit
statements and guarantee
5. Insurance guarantee