Section 10: OBLIG TIONS OF THE COMPANIES
Status not yet checkedOil Agreement (1979)(Ratification) Act, 1982, Sierra Leone
()The Companjes undertake to commence exploration operation
not later th n six (6) months after the Effective Date: to pursue
these operations to the maximum extent consistent with good
petroleum industry practice; and to commenc the drilling of
at least one well for Petroleum not later than twenty four (24)
months after the Effective Date. Such well will be drilled to a
depth sufficient to test the Devonian Strata (estimated at
7,000 feet), to basement, or to the depth at which commer
cial production is found, whichever comes first.
Nevertheless, if in the opinion of the Companies drilling of
such a well is not feasible due to a lack of a drilling prospect,
it shall not be necessary to drill such well and the Conpanies
may revert the concession to the Government.
(ii) Previous notice shall be given to the Government concern
ing the commencementof any drillings, with a description of the
location of the proposed welI, and work on drilling shall not
be started before consulting with the Government.
(iü) When a productive field has been discovered, the Con panies
shall exert its utmost efforts for developing it to the maximum
extent consistent with good potroleum industry practice, and
shall conduct production operations as e peditiously as possible.
(iv) No well shall be abandoned without first consulting with the
Government. All wells so abandoned shallbe plugged only with
the consent of the Government and in accordance with specifi
cations to be proposed by the Companies and approved by the
Government.
(v) The Companies undertake to carry ou all Authorised Opera
tions with due diligance, eficiency and economy; to observe
sound technical and engineering principles, in particular in
regard to the conservation of hydrocarbon deposits; and to take
atall times every reasonable precaution and adopt all reasonable
safety measures to prevent injury to person and property, the
occurence of blow-out and fire, the contamination of water
through the escape of petroleum or other injurious substances,
the pollution of the air by liberation of gas and in general all
avoidable waste.
(vi) All Petroleum produced shall be measured or weighed by
methods used in good oil industry practice. The Companies
shall propose the methods to be adopted to the Government
for approval.
(vii) The Companies shall enable duly nominated representatives
of the Government to inspect at all reasonable times the
operations conducted under this Agreement, to control and
test the methods and apparatus used for measuring or weigh
ing Petroleum, and to examine all books and records connected
with Companies' operations.
No. 2 Exploration, Mining and Processing Mineral 1982 15
(vii) The Companies shall keep in Sierra Leone ooks of accounts
and maintain full records of operations in accordance with a
system which it shall propose to the Government for its
approval. Such system shall conform to generally accepted
accounting principles and procedures in international petro
leum industry, and the books of accounts and records of
operations shall be opened to the Government's inspection at
all times, upon reasonable notice.
(ix) The Companies shall give the Government notice of the erectionof all fxed installation and shall kecPe
of all fixed installation and shall keep the Government informed
ony discOvery ofof the progress of operations as well as of any discovery of
materials other than Petroleum which may come to light in the
course of Authorised Operations. The Companies shall furnish
the Government with characteristic samples, duly labelled,
of strata as well as of Petroleum or of any other minerals which
may be discovered in the course of operation.
(x) The Companies shall submit to the Government within thirty
(30) days of the end of cach calendar quarter reports contain
ing information in respect of operations carried out and within
thirty (30) days of the end of cach calendar year a yearly report
containing all information required by the Government inres
pect of operations carried out by the Companies. These reports
shall be accompanied by accurate copies of maps, sections,
well logs, and other data relating to topographical, geological,
geophysical with its interpretation, drilling, producing and other
relevant matters. In addition, monthly progress reports shall be
submitted by the Companies concerning allwells being drilled.
(xi) Any plans, maps, records and general technical information
except statistical information, obtained by the Companies shall
be treated as confidential in the sense that neither party shall
disclose the same to third parties without the other party's con
sent which shall not be unreasonably withheld. However, the
duration of such confidentiality shall be limited to three (3)
years, except for seismic information which shall only be
released with consent of the Companies.
(xii) In the event of discovery of a gasficld the reserves of which
are not deemed by the Companies to be of sufficient size to
warrant its commercial development, then such field will be
offered to the Government free of charge and if accepted, the
Companies will have no further responsibilitiesfor that gasficld.
(xiii) If additional facilities are required for the purpose of enabling
the Government to take delivery of Natural Gas under Sub
clause 10 (xii) the capital for tbe creation of such facilities shal
be providod by the Government.
16 No. 2 Exploration, Mining and Processing Mineral
(xiV) The Companics shall supply to the Government or to refiners
to be nominated by the Government such quantities of Petro
leum, to be determined by the Government from time to time,
as may be necessary for internal consumption in Sierra Leone,
such consumption to include the bunkering of vesseis and fuel
ling of aircrat. Such supplies shall besubject to the following
provisions :
(a) The Companies shall not be called upon to supply Petroleum
the Government tothe extent that such Petroleum is required for
the conduct of Authorised Operations.
(6) The Companiesshall not be required,in order to meet the require
ments provided for in this Clause to produce Petroleunt at a
rate higher than the maximum efficient rate of production.
(c) The Government shall notify the Companies of its requirements
under this Clause in respect of each quarter of the calendar year
namely three months ending on Maroh 31st, June 30th, September
30th and December 31st; cach notification to be given not less
than two (2) months before the beginning of the quarter during
which delivery is to be made.
()Deliveries of Petroluem under this Clause shall be made at the
Companies' export terminal.
The price to be paid to the Companies for Petroleum supplied
under the terms of Clause 14 shall be an amount equivalent to the
of the prices ex terminal at which the Companies have sold
Petroleum to Nonaffiliates during that quarter. In the event no sales
of crude ol were mado during the said quarter to other than Afiliates
the price shall be equivalent to the minimum unit price exterminal
as obtained by producers of crude oil in West Africa (owned directly
or beneficially by persons or entities foreign to Nigeria) (for the pur
poses hereof West African producing countries are deemed to b those
along the coast of West Africa commencing with Spanish Sahara and
extending to Gabon) for the sale of crude oil during the immediately
preceding quarter, taking into consideration quantity and quality of
the crude oil in question and any other relevant factors.